{"operation":"document","citation":"PHMSA mn-2018-underground-natural-gas-storage-program-evaluation","title":"2018 MN UNGS Program Evaluation - mn-2018-underground-natural-gas-storage-program-evaluation (Minnesota; Underground Natural Gas Storage State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2018-01-01","effective_on":null,"summary":"2018 PHMSA underground natural gas storage program evaluation for Minnesota.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-mn-ungs-program-evaluation-mn-2018-underground-natural-gas-storage-program-evaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-mn-ungs-program-evaluation-mn-2018-underground-natural-gas-storage-program-evaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-mn-ungs-program-evaluation-mn-2018-underground-natural-gas-storage-program-evaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2021-08/mn-2018-underground-natural-gas-storage-program-evaluation.pdf","body":"PHMSA UNDERGROUND NATURAL GAS STORAGE (UNGS) MN PROGRAM EVALUATION – CY2018 CONDUCTED 7/22-26/2019 A – PROGRESS REPORT AND PROGRAM DOCUMENTATION REVIEW 9 B – PROGRAM INSPECTION PROCEDURES 14 C – PROGRAM PERFORMANCE 34 D – COMPLIANCE ACTIVITIES 21 E – INCIDENT INVESTIGATIONS 13 F – DAMAGE PREVENTION 4 G – FIELD INSPECTIONS 12 H - 60106 AGREEMENT STATE (if applicable) 6 TOTAL PROGRAM EVALUATION POINTS 113\n\nPHMSA UNGS STATE PROGRAM EVALUATION – CY2018 A – PROGRESS REPORT AND PROGRAM DOCUMENTATION REVIEW THIS SECTION ANALYZES ACCURACY AND COMPLETENESS OF ANNUAL PROGRESS REPORT SCORE 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data – Progress Report Attachment 1 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: The information reviewed appears correct, only one operator with one facility. 1 2 Review of Inspection Days for accuracy – Progress Report Attachment 2 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: Days reviewed with inspection summaries. No issues. 1 3 Accuracy verification of Operators and Operators Inspection Units in State – Progress Report Attachment 3 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: One operator, Center Point energy 1 4 Accuracy verification of Compliance Activities – Progress Report Attachment 5 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: there were none in CY2018. 1 5 Were UNGS program files well-organized and accessible? - Progress Report Attachment 6 (Yes= 2 points, No= 0 Points, NI=1 point) Comments: No issues 2 6 Was employee listing and completed training accurate and complete? – Progress Report Attachment 7 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: No issues 1 7 Verification of Part 192 and 199 Rules and Amendments – Progress Report Attachment 8 (Yes= 1 point, No= 0 Points) Comments: No issues 1 8 List of Planned Performance - Did State describe accomplishments on Progress Report in detail – Progress Report Attachment 10 (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: No issues, combined Gas, HL and UNGS programs 1 9 General Comments: - None 9\n\nB – PROGRAM INSPECTION PROCEDURES Does State Inspection Plan include procedures that address the following elements? (See Guidelines Section 5.1) 1 Does State have written inspection procedures? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 2 Standard Inspections Do Standard Inspection procedures give guidance to State inspectors that insure consistency for inspections conducted by the State? The following elements should be addressed at a minimum. • Pre-Inspection Activities • Inspection Activities • Post Inspection Activities (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 3 Specialized Inspections Do Specialized Inspection procedures give guidance to State inspectors that insure consistency for inspections conducted by the State? The following elements should be addressed at a minimum. • Pre-Inspection Activities • Inspection Activities • Post Inspection Activities (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 4 Design, Testing, and Construction Inspections Do Design, Testing, and Construction Inspection procedures give guidance to State inspectors that insure consistency for Inspections conducted by the State? The following elements should be addressed at a minimum. • Pre-Inspection Activities • Inspection Activities • Post Inspection Activities (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 2 2 2 1\n\n5 Drug and Alcohol Inspections Do Drug and Alcohol Inspection procedures give guidance to State inspectors that insure consistency for Inspections conducted by the State? The following elements should be addressed at a minimum. • Pre-Inspection Activities • Inspection Activities • Post Inspection Activities (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 1 6 Does inspection plan address inspection priorities of each inspection unit, based on the following elements? • Length of time since last inspection (Within five-year interval per inspection unit) • Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) • Type of activity being undertaken by operators in inspection units (i.e. construction) • Locations of operator’s inspection units being inspected - (HCA's, Geographic area, Population Density, etc.) • Process to identify high-risk inspection units considering integrity threats • Are inspection units broken down appropriately? (Yes= 6 points, No= 0 Points, NI=1-5 points) Comments: Yes, covered in MNOPS manual section 5. Combined with NG and HL program. No issues. 6 7 General Comments: 14\n\nC – PROGRAM PERFORMANCE 1 Was ratio of Total Inspection Person-Days to Total Person-Days acceptable? (Chapter 4.2) A = Total Inspection Person Days (Attachment 2) B = Total Inspection Person Days Charged to the program (220 x Number of Inspection person years from Attachment 7) Ratio = A/B If Ratio >= .38 then score = 5 points. If Ratio < .38 then score = 0 points. (Yes= 5 points, No= 0 Points) Comments: They had 4.67 days, with .06 FTE, no issues 5 2 Has each Inspector and Program Manager fulfilled the TQ Training Requirements? (See Guidelines Appendix C for requirements and Chapter 4.3.1) (Yes= 5 points, No= 0 Points, NI=1-4) Comments: Inspectors Jeff Blackwell and Jeff Cremin are assigned to UNGS, they both took course May 2018. No issues. 5 3 Does State use the PHMSA Inspection Assistant (IA) program to document inspections? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, no issues. 2 4 Did records and discussions with Program Manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, No issues. 2 5 Did State respond to PHMSA's Evaluation Letter within 60 days and correct or address any noted deficiencies? Chapter 8.1 (Yes= 2 points, No= 0 Points, NI=1 point) Comments: N/A 2 6 Did State inspect all types of operators and inspection units in accordance with time intervals established in their written procedures? Chapter 5.1 (Yes= 5 points, No= 0 Points, NI=1-4 points) Comments: Yes, no issues. This is first round so not really applicable. 5 7 Did State Inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Chapter 5.1 (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, one inspection of single operator (Watertown Storage) began in November 2018. Uses IA and all complete 2 8 Did State complete all applicable portions of inspection forms? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, the inspection form was provided for review. 2 9 Has the State reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: No issues 2\n\n10 11 12 13 14 15 16 Is the State verifying operators are conducting drug and alcohol tests required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 (Yes= 2 points, No= 0 Points, NI= 1 point) Comments: No issues, common operator with Gas Program 2 Does the State have a mechanism for communicating with stakeholders regarding the inspection and enforcement program? (This should include making enforcement cases available to public). (Yes= 1 points, No= 0 Points, NI=.5 point) Comments: Yes, they have website https://dps.mn.gov/divisions/ops/Pages/default.aspx Enforcement and various other communications are available. No issues. 1 Did State execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 (Yes= 1 points, No= 0 Points, NI=.5 point) Comments: N/A 1 Did the State participate in/respond to surveys or information requests from PHMSA? (Yes= 1 points, No= 0 Points, NI=.5 point) Comments: No issues. Combination program with Gas and HL. 1 Did the State forward any potential waivers/special permits to PHMSA for review prior to issuing them to operators? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: N/A 1 If the State has issued any waivers/special permits for any operator, has the State verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: N/A 1 General Comments: 34\n\nD – COMPLIANCE ACTIVITIES 1 Does the State have written procedures to identify steps to be taken from the discovery to resolution of a probable violation? Chapter 5.1 • Procedures to notify an operator (company officer) when a noncompliance is identified • Procedures to routinely review progress of compliance actions to prevent delays or breakdowns • Procedures regarding closing outstanding probable violations (Yes= 4 points, No= 0 Points, NI=1-3 points) Comments: Yes, this is same as procedures with Gas and HL programs. Section 5.3 of MNOPS procedures. No issues. 2 Did the State follow compliance procedures (from discovery to resolution) and adequately document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 • Were compliance actions sent to company officer or manager/board member if municipal/government system? • Document probable violations • Resolve probable violations • Routinely review progress of probable violations • ; and (Yes= 4 points, No= 0 Points, NI=1-3 points) Comments: Yes, they issued NOPV in February to Center Point (only UNGS operator). Various documentation is sufficient. Operator I believe is waiting on publication of final rule for response. However, all is fine with the states actions. 3 Did State within 30 days of the end of an inspection conduct a post-inspection briefing with the owner or operator of the UNGS facility inspected outlining any concerns identified during the inspection? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: No issues 4 Did State within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: No issues 5 Did the State issue compliance actions for all probable violations discovered? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, NOPV issued February 6, 2019 on November 2018 inspection 6 Did compliance actions give reasonable due process to all parties? Including \"show cause\" hearing if necessary. (Yes= 2 points, No= 0 Points) Comments: Yes, No issues. 4 4 2 2 2 2\n\n7 Is the Program Manager familiar with State process for imposing civil penalties? (describe any actions taken) (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, again this is a combination program and program has history of imposing civil penalties. 2 8 Were civil penalties considered for repeat violations, violations which can’t be corrected by other means, or violations resulting in incidents? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: N/A – new program – new rules 2 9 Can the State demonstrate it is using their enforcement fining authority for safety violations? (Yes= 1 point, No= 0 Points, NI= .5 point) Comments: Yes, no issues. 1 10 General Comments: 21\n\nE – INCIDENT INVESTIGATIONS 1 Does the State have written procedures to address State actions in the event of an incident? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, Section 6 of MNOPS procedures outlines incidents. No issues. 2 2 Does State have adequate mechanism to receive and respond to operator reports of incidents, including after-hours reports? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, also covered in Chapter 6 MNOPS procedures. No issues. 2 3 Did the State keep adequate records of Incident notifications received? (Yes= 2 points, No= 0 Points, NI=1 point) Comments: Yes, however no incidents on UNGS, but process is there will combination program and all activities are acceptable. No issues. 2 4 If onsite investigation was not made, did State obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 (Yes= 1 point, No= 0 Points, NI= .5 point) Comments: N/A 1 5 Were all incidents investigated, thoroughly documented, and with conclusions and recommendations? • Observations and document review • Contributing Factors • Recommendations to prevent recurrences where appropriate (Yes= 3 points, No= 0 Points, NI=1-2 points) Comments: N/A 3 6 Did the State initiate compliance action for violations found during any incident investigation? (Yes= 1 point, No= 0 Points) Comments: N/A 1 7 Did the State assist the Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents and investigate discrepancies) Chapter 6 (Yes= 1 point, No= 0 Points, NI= .5 point) Comments: N/A 1 8 Does State share lessons learned from incidents with PHMSA? (Yes= 1 point, No= 0 Points) Comments: N/A However, this is combination program and no issues. 1\n\n9 General Comments: 13\n\nF – DAMAGE PREVENTION 1 Did the State inspector verify UNGS operators are following their written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? (API 1171 Section 11.10 Public Awareness and Damage Prevention) (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes, part of damage prevention inspection. 2 Did the State encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (Common Ground Alliance Best Practices, support excavation damage prevention legislation, etc.) (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes, state has robust damage prevention program. Also has various training sessions and significant participation. 3 General Comments: 2 2 4\n\nG – FIELD INSPECTIONS 1 Operator, Inspector, Location, Date and PHMSA Representative Comments: CenterPoint Energy, opid 12350, Jeff Blackwell-Inspector, Jeffrey Cremin-Supervisor, Waterville Underground Storage, 12510 440th Ave, Waterville, MN 56096, 7/23-24/19, Patrick Gaume 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? (Yes= 1 point, No= 0 Points) Comments: Yes. The inspection had been scheduled, was conducted in the UNGS office, and several operator personnel participated in the inspection. 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes. IA was used to conduct and record the inspection. 2 4 Did the inspector thoroughly document results of the inspection? (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes. Each question was asked and findings were noted with comments as needed. 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Yes= 1 point, No= 0 Points) Comments: Yes. All of the resources of the facility were made available for the inspection. 1 6 Did the inspector adequately review the following during the field portion of the State Program Evaluation? • Procedures • Records • Field Activities/Facilities • Other (please comment) (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes*3. Procedures, Records, and Field was addressed. 2 7 Did the inspector have adequate knowledge of the UNGS safety program and regulations? (Evaluator will document reasons if unacceptable) (Yes= 2 points, No= 0 Points, NI=1 Point) Comments: Yes. Jeff & Jeff are both TQ certified and conducted the inspection in a competent and professional manner. 2 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) (Yes= 1 point, No= 0 Points) Comments: Yes. Several parts of the procedures are still in ‘draft’ form and progress toward completing them was strongly encouraged. Certain wellheads need maintenance. There is a need to quantify and investigate casing pressures. Several flanges had not been properly installed. Records appeared to be in good order. CenterPoint’s Prep for the inspection was helpful. Need to finish working up the well control plan with Wild Well. 1\n\n9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) (Yes= 1 point, No= 0 Points) Comments: Yes. Several parts of the procedures are still in ‘draft’ form and progress toward completing them was strongly encouraged. Certain wellheads need maintenance. There is a need to quantify and investigate casing pressures. Several flanges had not been properly installed. Records appeared to be in good order. CenterPoint’s Prep for the inspection was helpful. Need to finish working up the well control plan with Wild Well. 10 General Comments: • What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) • Best Practices to Share with Other States - (Field - could be from operator visited or State inspector practices) • Other Field Observation Areas Observed (check all that apply) wellheads Y flanges Y Atmospheric corrosion Y Signs & markers for wells and safety. Y Site security Y locks Y Site cleanliness Y Casing pressures Y Air/soil interface Y Pit cover, Y 1 12\n\nH - 60106 AGREEMENT STATE (if applicable) 1 Did the State use the current federal inspection form(s)? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: H1-6, NA. Not a 60106 program. 1 2 Are results documented demonstrating inspection units were reviewed in accordance with State inspection plan? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: 1 3 Were any probable violations identified by State referred to PHMSA for compliance action? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: 1 4 Did the State immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: 1 5 Did the State give written notice to PHMSA within 60 days of all probable violations found? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: 1 6 Did the State initially submit adequate documentation to support compliance action by PHMSA on probable violations? (Yes= 1 point, No= 0 Points, NI=.5 point) Comments: 1 7 General Comments: 6","truncated":false,"body_characters":19166}