{"operation":"document","citation":"PHMSA nc2015ngprogramevaluation","title":"2015 NC NG Program Evaluation - nc2015ngprogramevaluation (North Carolina; Natural Gas State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-01-01","effective_on":null,"summary":"2015 PHMSA natural gas program evaluation for North Carolina.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-nc-ng-program-evaluation-nc2015ngprogramevaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-nc-ng-program-evaluation-nc2015ngprogramevaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-nc-ng-program-evaluation-nc2015ngprogramevaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/subdoc/2216/nc2015ngprogramevaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2015 Gas State Program Evaluation for NORTH CAROLINA UTILITIES COMMISSION Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 1\n\n2015 Gas State Program Evaluation -- CY 2015 Gas State Agency: North Carolina Rating: Agency Status: Date of Visit: 05/09/2016 - 05/13/2016 Agency Representative: Steve Wood PHMSA Representative: Leonard Steiner Commission Chairman to whom follow up letter is to be sent: Name/Title: Edward S. Finley, Chairman Agency: North Carolina Utilities Commission Address: 430 North Salisbury Street, Dobbs Building City/State/Zip: Raleigh, North Carolina 27603-5918 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2015 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART G): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART G, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 9 B Program Inspection Procedures 13 12 C Program Performance 43 40 D Compliance Activities 15 15 E Incident Investigations 5 5 F Damage Prevention 8 7 G Field Inspections 12 12 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 106 100 State Rating................................................................................................................................................... 94.3 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 2\n\nPART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate as reported. 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate as reported on Progress Report. 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate as reported on Progress Report. 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate as reported on Progress Report. There were no federally reportable incidents in CY2015. 1 1 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate are reported on the Progress Report. 6 Were pipeline program files well-organized and accessible? - Progress Report Attachment 6 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 1 Needs improvement. The records were not readily retrievable and filed in a logical order. This was partially due to Mr. Wood being recently appointed as the Program Manager and the administrative assistant was in this job about 4 months. 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Accurate as reported on the Progress Report. 1 1 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 1 1 9 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 1 1 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 3\n\nYes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 9 Total possible points for this section: 10 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 4\n\nPART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes 2 2 2 IMP and DIMP Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 1 1 3 OQ Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 1 1 4 Damage Prevention Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post- inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes adequate procedure. 1 1 5 Any operator training conducted should be outlined and appropriately documented as needed. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, adequate procedure 1 1 6 Construction Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, adequate procedure 1 1 DUNS: 780414723 2015 Gas State Program Evaluation 7 Does inspection plan address inspection priorities of each operator, and if necessary each 6 5 unit, based on the following elements? Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection (Within five year interval) Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 5\n\nc. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: All the required factors for priorities are listed and explained. The operators are not evaluated against each of the inspection priorities to determine which operator will have the highest to lowest priority for an inspection. Each operator should be evaluated in each of the priority category to determine their overall inspection priority. 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 12 Total possible points for this section: 13 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 6\n\nPART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 580.50 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 4.28 = 942.33 Ratio: A / B 580.50 / 942.33 = 0.62 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Ratio is .62 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector. Yes No Needs Improvement Evaluator Notes: The South Carolina inspectors did not receive any non-TQ training in CY2015. 3 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes. Mr. wood has recently assigned the position of Program Manage, but he has be a long time pipeline safety inspector. 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No response from the Chairman was required for CY2014. 2 NA 5 Did State hold PHMSA TQ Seminar in Past 3 Years? Chapter 8.5 Yes = 2 No = 0 Evaluator Notes: Yes, Conducted a seminar with TQ in CY2013. 2 2 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 Evaluator Notes: yes Operators and their units were inspected accordance with the inspection plan. DUNS: 780414723 2015 Gas State Program Evaluation 5 5 North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 7\n\n7 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Inspection forms were either the PHMSA form or a modified version. 2 2 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No known cast iron in North Carolina. 1 NA 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No known cast iron in North Carolina. 1 NA 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: Yes, they have a supplement form with question. 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: Yes, have question to review the records of accidents and failures. 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Yes = 2 No = 0 Needs Improvement = 1 2 1 Evaluator Notes: the data. The pipeline safety division has collected the data from reports. No analysis has been done. They could not show trends of 13 Did state input all applicable OQ, DIMP/IMP inspection results into federal database in a 2 1 timely manner? This includes replies to Operator notifications into IMDB database. Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Needs improvement. The completed OQ inspections forms were not uploaded into the PHMSA OQ database. DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 8\n\n14 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: NPMS miles. Yes, through two methods, one with a question of the inspection form and the other is to compare the report of AR versus 15 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 NA North Carolina did not conduct drug and alcohol inspections in CY2015, but had conducted in previous years. 16 Is state verifying operators OQ programs are up to date? This should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Conducts protocol 9 inspections. 2 2 17 Is state verifying operator's gas transmission integrity management programs (IMP) are up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart 0 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, conducts IMP inspections in CY2015. 2 2 18 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart P DIMP ? First round of program inspections should have been complete by December 2014 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Conducted DIMP inspections in CY2015. 2 2 19 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. 49 CFR 192.616 (I13-16) PAPEI Effectiveness Inspections should be conducted every four years per RP1162 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Conducts PA inspections in conjunction with standard inspections. 2 2 20 Does the state have a mechanism for communicating with stakeholders - other than state 1 0.5 pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Needs improvement, North Carolina Public Utilities Commission has a website that had a minimum of information for operators. The site needs to be expanded to include information about who are the jurisdictional operators, the inspection effort, the probable violations discovered and the types of compliance actions. The website needs to be inclusive for all DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 9\n\nstakeholders, not just operators. Other items that may serve the community is a method for any stakeholder to contact the Commission especially the Pipeline Safety Section especially for reporting of possible safety issues of pipelines. 21 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) 1 0.5 Reports? Chapter 6.3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: During the inspection there were 7 Safety Related Condition Reports (SRCR) since CY2013 that were still open. The Pipeline Safety Section should inspect the corrections of each report, determine if the condition has been corrected and communicate with the PHMSA Southern Region the status. 22 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The have a question for this on a supplemental form. 1 1 23 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: YES 1 1 24 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: No Waivers 1 NA 25 Did the state attend the National NAPSR Board of Directors Meeting in CY being evaluated? No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: 1 1 26 Discussion on State Program Performance Metrics found on Stakeholder Communication 2 2 site - http://primis.phmsa.dot.gov/comm/states.htm No = 0 Needs Improvement = 1 Yes = 2 a. Discussion of Potential Accelerated Actions (AA's) based on any negative trends Yes No Needs Improvement b. NTSB P-11-20 Meaningful Metrics Yes No Needs Improvement Evaluator Notes: Discussion included the trends of the North Carolina Pipeline Safety Section. It is noted that probable violations discovered and compliance actions were lower. No monetary penalties have been issued. 27 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 40 Total possible points for this section: 43 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 10\n\nPART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement Evaluator Notes: Yes Adequate procedures. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 4 document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Document probable violations Yes No Needs Improvement c. Resolve probable violations Yes No Needs Improvement d. Routinely review progress of probable violations Yes No Needs Improvement e. Were applicable civil penalties outlined in correspondence with operator(s) Yes No Needs Improvement Evaluator Notes: 3 Did the state issue compliance actions for all probable violations discovered? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 4 Did compliance actions give reasonable due process to all parties? Including \"show cause\" hearing if necessary. Yes = 2 No = 0 Evaluator Notes: 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were 2 2 civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: The Program Manager is familiar with the state procedures. He needs to refine the procedures for the start of the process within the Pipeline Safety Section. 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety 1 1 violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: In recent years, not violation warranted a fine. However, a criteria should be developed when a fine is recommended and the amount of fine recommended. Examples are: when is a fine recommended, a repeat in 2 years? in 3 years? when a serious or dangerous violation? 7 General Comments: DUNS: 780414723 2015 Gas State Program Evaluation Info Only Info Only North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 11\n\nInfo Only = No Points Evaluator Notes: DUNS: 780414723 2015 Gas State Program Evaluation Total points scored for this section: 15 Total possible points for this section: 15 North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 12\n\nPART E - Incident Investigations Points(MAX) Score 1 Does the state have written procedures to address state actions in the event of an incident/ accident? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 2 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: 3 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No incidents in North Carolina in CY2015. 1 NA 4 Were all incidents investigated, thoroughly documented, and with conclusions and recommendations? Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review 3 NA Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: 5 Did the state initiate compliance action for violations found during any incident/accident investigation? Yes = 1 No = 0 Evaluator Notes: 1 NA 6 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) Yes = 1 No = 0 Evaluator Notes: DUNS: 780414723 2015 Gas State Program Evaluation 1 1 North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 13\n\nNo incidents, however related other near misses and potential incidents. 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 5 Total possible points for this section: 5 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 14\n\nPART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: A question is on the supplemental inspection form. 2 2 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Question about checking locate requests. 2 2 3 Did the state encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: yes, encourages operators to adopt procedures that mirror CGA best practices. 2 2 4 Has the agency or another organization within the state collected data and evaluated 2 1 trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Needs much improvement. The pipeline section collects the annual reports but doesn't use the data. There is no evaluation or analysis of excavation damage data. 5 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 7 Total possible points for this section: 8 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 15\n\nPART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: Piedmont Natural Gas Name of State Inspector(s) Observed: Harry Bryant, Hilary King, with Steve Wood observing Location of Inspection: Burlington, North Carolina area Date of Inspection: May 12, 2006 Name of PHMSA Representative: Leonard Steiner Evaluator Notes: Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? Yes = 1 No = 0 Evaluator Notes: Proper and adequate notice was provided to the operator. 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes 2 2 4 Did the inspector thoroughly document results of the inspection? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) Yes = 1 No = 0 Evaluator Notes: Yes, needed CGI and DMM with half cell. 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: Inspected the physical facilities. 2 2 7 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) 2 2 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 16\n\nYes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Evaluator Notes: Yes 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) Yes = 1 No = 0 Evaluator Notes: 1 1 During the exit interview there were no probable violations, however, noted several area of concern. Good exit interview. 10 General Comments: 1) What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) 2) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) 3) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance E. Vault Maintenance Info Only Info Only DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 17\n\nF. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: On May 12, 2006, I observed Harry Bryant, lead inspector, and Hilary King conduct a stand inspection of the physical facilities of Piedmont Natural Gas, a pipeline operator of distribution pipelines. Steve Wood, program manager, was observing the inspectors. Mr. Bryant has coordinated the inspection and both inspectors arrived at the operator's field office at the coordinated time. A list of locations and facilities to be inspected were presented to the operator. The schedule and location of facilities was planned to minimize travel time. The inspectors were knowledgeable and competent and conducted the inspection in a courteous and professional manner. Total points scored for this section: 12 Total possible points for this section: 12 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 18\n\nPART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with \"PHMSA directed inspection plan\"? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 19\n\nPART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 780414723 2015 Gas State Program Evaluation North Carolina NORTH CAROLINA UTILITIES COMMISSION, Page: 20","truncated":false,"body_characters":34586}