{"operation":"document","citation":"PHMSA ok2010ngprogramevaluation","title":"2010 OK NG Program Evaluation - ok2010ngprogramevaluation (Oklahoma; Natural Gas State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2010-01-01","effective_on":null,"summary":"2010 PHMSA natural gas program evaluation for Oklahoma.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-ok-ng-program-evaluation-ok2010ngprogramevaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-ok-ng-program-evaluation-ok2010ngprogramevaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-ok-ng-program-evaluation-ok2010ngprogramevaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/subdoc/1316/ok2010ngprogramevaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2010 Natural Gas State Program Evaluation for Oklahoma Corporation Commission Document Legend PART: O -- Representative Date and Title Information A -- General Program Qualifications B -- Inspections and Compliance - Procedures/Records/Performance C -- Interstate Agent States D -- Incident Investigations E -- Damage Prevention Initiatives F -- Field Inspection G -- PHMSA Initiatives - Strategic Plan H -- Miscellaneous I -- Program Initiatives DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 1\n\n2010 Natural Gas State Program Evaluation -- CY 2010 Natural Gas State Agency: Oklahoma Rating: Agency Status: Date of Visit: 07/18/2011 - 07/22/2011 Agency Representative: Dennis Fothergill, Pipeline Safety Manager PHMSA Representative: Patrick Gaume Commission Chairman to whom follow up letter is to be sent: Name/Title: Ms. Dana Murphy, Chairman Agency: Oklahoma Corporation Commission Address: 2101 N. Lincoln Blvd. City/State/Zip: Oklahoma City, Oklahoma 73105 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2010 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual certification/agreement attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART F): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART F, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A General Program Qualifications 26 26 B Inspections and Compliance - Procedures/Records/Performance 24 24 C Interstate Agent States 0 0 D Incident Investigations 7 7 E Damage Prevention Initiatives 9 9 F Field Inspection 12 12 G PHMSA Initiatives - Strategic Plan 9.5 9 H Miscellaneous 3 3 I Program Initiatives 9 9 TOTALS 99.5 99 State Rating................................................................................................................................................... 99.5 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 2\n\nPART A - General Program Qualifications Points(MAX) Score 8 8 1 Did the state submit complete and accurate information on the attachments to its most current 60105(a) Certification/60106 (a) Agreement? (NOTE: PHMSA Representative to verify certification/agreement attachments by reviewing appropriate state documentation. Score a deficiency in any one area as \"needs improvement\". Attachment numbers appear in parenthesis) Previous Question A.1, Items a-h worth 1 point each Yes = 8 No = 0 Needs Minor Improvement = 3-7 Needs Major Improvement = 2 a. State Jurisdiction and agent status over gas facilities (1) b. Total state inspection activity (2) c. Gas facilities subject to state safety jurisdiction (3) d. Gas pipeline incidents (4) e. State compliance actions (5) f. State record maintenance and reporting (6) g. State employees directly involved in the gas pipeline safety program (7) h. State compliance with Federal requirements (8) SLR Notes: A.1 YES. 8 of 8 points. A--- yes, B---OK inspects not by Operator, but by Unit &/or System. A Unit can have between one and forty-two Systems. The Unit is where the records are kept. A System is a geographical group of pipe or distribution lines that is a sub-part of the Unit. State policy is to inspect every System every 2-5 years. As a practical matter, a Unit may be visited every year as a result of various Systems in the Unit being inspected. C-----the Operator IDs are missing on Attachment 3, Warning only as OPID is not specified as required in Guidelines 2.5.3. Note for Carrie Winslow: The opid are present in the DRAFT of Attachment 3 , but are absent in the FINAL printed version. Please change FedStar. D---Yes. E---Yes; In 2010 NOAs were considered but not adopted as a practice, (it is in the scope of the regulations but not used). Since 1987, the Policy has been that the only tool available is notices of non-compliance. F---Records are kept by paper records, in-house electronic records, and or FedStar. G---Yes. H---Yes. 2 Did the state have an adequate mechanism to receive operator reporting of incidents to ensure state compliance with 60105(a) Certification/60106(a) Agreement requirements (fatality, injury requiring hospitalization, property damage exceeding $50,000 - Mechanism should include receiving \"after hours\" reports)? (Chapter 6) Previous Question A.2 Yes = 1 No = 0 SLR Notes: A.2. Yes. OCC meets the Federal reporting requirements, & requires reporting at $5000 loss. 1 1 3 Has the state held a pipeline safety TQ seminar(s) in the last 3 years? (NOTE: Indicate date of last seminar or if state requested seminar, but T&Q could not provide, indicate date of state request for seminar. Seminars must be held at least once every 3 calendar years.) (Chapter 8.5) Previous Question A.4 Yes = 2 No = 0 SLR Notes: A.3. Yes, in Nov 6-9, 2007, & in May 12-15, 2009, scheduled for Nov 14-18, 2011. Practice is to schedule every 18 months or so. 2 2 4 Were pipeline safety program files well-organized and accessible?(NOTE: This also includes electronic files) (Chapter 5) Previous Question A.5 Yes = 1 No = 0 SLR Notes: A.4. Yes, the paper files are in the Pipeline Section Office area. 1 1 5 Did state records and discussions with the state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? (Chapter 4.1, Chapter 8.1) Previous Question A.6 Yes = 2 No = 0 Needs Improvement = 1 SLR Notes: A.5. Yes, The Program Managers show a professional knowledge of the regulations. 2 2 6 Did the state respond in writing within 60 days to the requested items in the Chairman's letter following the Region's last program evaluation? (No response is necessary if no items are requested in letter and mark \"Yes\") (Chapter 8.1) Previous Question A.8 Yes = 1 No = 0 1 1 SLR Notes: A.6. Yes, The Chairman letter was sent within 7 days of receipt. It addressed State Damage Prevention Statutes, Staffing concerns, Incident and accident reporting, and Effectiveness of State's Damage Prevention Efforts. DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 3\n\n7 What actions, if necessary, did the State initiate as a result of issues raised in the Chairperson's letter from the 1 1 previous year? Did actions correct or address deficiencies from previous year's evaluation? (No response is necessary if no items are requested in letter and mark \"Yes\") (Chapter 8.1) Previous Question A.8/A.9 Yes = 1 No = 0 SLR Notes: A.7. Mostly, 1 pt. Civil penalties for excavation damage did not become law but efforts are continuing in this area. Hired two new employees in 4th qtr 2010. A job posting is current effective 7/7/11. When the posting is filled, then staffing will be at 100%. One additional position has been requested and approved; it will be posted in 1st qtr, 2012. Revised procedures have been implemented to minimize the under-reporting of incidents or accidents. The OCC is working with Oklahoma One-Call to improve data gathering for the purpose of measuring the effectiveness of operator's Damage Prevention Programs. Personnel and Qualifications 8 Has each inspector fulfilled the 3 year TQ training requirement? If No, has the state been granted a waiver regarding TQ courses by the Associate Administrator for Pipeline Safety? (NOTE: If the State has new inspectors who have not attended all TQ courses, but are in a program which will achieve the completion of all applicable courses within 3 years of taking first course (5 years to sucessfully complete), or if a waiver has been granted by the applicable Region Director for the state, please answer yes.) (Chapter 4.4) Previous Question A.10 Yes = 3 No = 0 3 3 SLR Notes: A.8. Yes, all inspectors with 3+ years of service have passed all TSI core courses, and the new inspectors are taking courses and are scheduled for the rest. 9 Brief Description of Non-TQ training Activities: Info Only = No Points Info Only Info Only For State Personnel: A.9. State- All Inspectors are HAZWOPER certified. For Operators: Operators ? 5 days per year, each inspector is required to provide training in the regulations to the operators. OCC is emphasizing the training of Master Meter Operators and Municipal Distribution. Have a program to strongly encourage/force distribution companies to assume operations & maintenance of customer owned sales/ fuel lines. To date about 90% of the sales lines are O&M by the LDC. 38.5 days of on-site training was provided in 2010. For Non-Operator Entities/Parties, Information Dissemination, Public Meetings: Non-operator/public - nothing beyond enforcing RP 1162 to cause Operators to interface with the public. SLR Notes: A.9. State- All Inspectors are HAZWOPER certified. Operators ? 5 days per year, each inspector is required to provide training in the regulations to the operators. OCC is emphasizing the training of Master Meter Operators and Municipal Distribution. Have a program to strongly encourage/force distribution companies to assume operations & maintenance of customer owned sales/fuel lines. To date about 90% of the sales lines are O&M by the LDC. 38.5 days of on-site training was provided in 2010. Non-operator/public - nothing beyond enforcing RP 1162 to cause Operators to interface with the public. 10 Did the lead inspectors complete all required T&Q OQ courses and Computer Based Training (CBT) before conducting OQ Inspections? (Chapter 4.4.1) Previous Question A.12 Yes = 1 No = 0 1 1 SLR Notes: have also been trained. A.10. Yes. John Harper ('04) & Kelly Phelps ('05) are the OQ Leads, They were trained to TSI course 299 in 04 & 05. The other inspectors with 3+ years 11 Did the lead inspectors complete all required TQ Integrity Management (IMP) Courses/Seminars and CBT before conducting IMP Inspections? (Chapter 4.4.1) Previous Question A.13 Yes = 1 No = 0 1 1 SLR Notes: course 294. A.11. Yes. IMP Leads are John Harper ('05 & '04) & Kelly Phelps ('05 & '02). They were trained in 2005 for TSI course 297 and in 2004 or 2002 for TSI 12 Was the ratio acceptable of Total inspection Person-days to Total Person-days charged to the program by state inspectors? (Region Director may modify points for just cause) (Chapter 4.3) Previous Question B.12 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 947.50 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 7.05 = 1551.73 DUNS: 150235299 2010 Natural Gas State Program Evaluation 5 5 Oklahoma Oklahoma Corporation Commission, Page: 4\n\nRatio: A / B 947.50 / 1551.73 = 0.61 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 SLR Notes: A.12 A=947.5 person days. B=7.05 man years * 220 = 1551 person days. A/B= .6109 . .61>.38, okay. 13 Have there been modifications or proposed changes to inspector-staffing levels? (If yes, describe) Previous Info Only Info Only Question B.13 Info Only = No Points SLR Notes: A.13. Yes, staffing levels were down during 2008-2010 and were restored at the end of 2010. Staffing was at 13 through 2007. In November, 2007, an inspector resigned & that position was not replaced. Mr. Phelps changed his time from 100% supervision to 50/50 supervision/inspector to make up some of the shortfall. Effective 12/31/2009, Ted Tiger retired and staffing became 11. Effective August, 2010, Staffing was authorized to 12 (actual staff was at 10), by year end 2010 actual and authorized staff was at 12. A 13th position has been authorized and posted effective July, 2011. A 14th position will be authorized effective January, 2012. 14 Part-A General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: A.14. The OCC Pipeline Department was restored to 12 positions at the end of 2010, and will be authorized to 14 positions by January, 2012. Effective 7/1/2011, All non-regulated gas gathering line operators must report all incidents that meet Federal reporting criteria. OCC changed their enforcement procedures on 7/1/2009 to incorporate ?198 into their regulations. OCC continues to work to have its authority changed to allow the State to be more stringent than the Federal Code in certain situations. OCC has been unsuccessful so far in making needed changes to the State's Damage Prevention Law to cause inclusion of civil penalties against excavators. Total points scored for this section: 26 Total possible points for this section: 26 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 5\n\nPART B - Inspections and Compliance - Procedures/Records/ Performance Points(MAX) Score Inspection Procedures 1 Does the State have a written inspection plan to complete the following? (all types of operators including LNG) 6.5 6.5 (Chapter 5.1) Previous Question B.1 + Chapter 5 Changes + Incorporate LNG Yes = 6.5 No = 0 Needs Improvement = 50% Deduction a Standard Inspections (Including LNG) (Max points = 2) b IMP Inspections (Including DIMP) (Max points = .5) c OQ Inspections (Max points = .5) d Damage Prevention (Max points = .5) e On-Site Operator Training (Max points = .5) f Construction Inspections (Max points = .5) g Incident/Accident Investigations (Max points = 1) h Compliance Follow-up (Max points = 1) Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement SLR Notes: B.1. A---, Yes, have procedures in SOP pages 1-10. The SOP shows that Units are inspected every 2-3 years, but certain Systems in large Units may be on a 4-5 year rotation. B--- IMP plan review is on an 8 yr cycle. C--- OQ plan review is on a 10 yr cycle. D--- yes, Damage Prevention is part of the Std Insp; see SOP pg 6 of 10. E--- yes, see SOP pg 7 of 10, also see questions A.3 & A.9. F. G. & H--- These inspections will be conducted as needed and as per the SOP. 2 Did the written Procedures for selecting operators adequately address key concerns? (Chapter 5.1) Previous 2 2 Question B.2, items a-d are worth .5 point each Yes = 2 No = 0 Needs Improvement = 50% Deduction a Length of time since last inspection Yes No Needs Improvement b History of Operator/unit and/or location (including leakage , incident and compliance history) Yes No Needs Improvement c Type of activity being undertaken by operator (construction etc) Yes No Needs Improvement d For large operators, rotation of locations inspected Yes No Needs Improvement SLR Notes: B.2. yes, Items a, b, c, & d are all found in the SOP pages 3-6 of 8. Inspection Performance 3 Did the state inspect all types of operators and inspection units in accordance with time intervals established in its written procedures? (Chapter 5.1) Previous Question B.3 Yes = 2 No = 0 2 2 SLR Notes: by System. B.3. Yes, Units are being inspected in accordance with the SOP. Inspections are tracked to the System level & the year and type of inspection are recorded 4 Did the state inspection form cover all applicable code requirements addressed on the Federal Inspection forms? (Chapter 5.1 (3)) Previous Question B.4 Yes = 1 No = 0 SLR Notes: B.4. Yes, OCC uses the Federal Forms and an addendum sheet. 1 1 5 Did state complete all applicable portions of inspection forms? (Chapter 5.1 (3)) Previous Question B.5 1 1 Yes = 1 No = 0 SLR Notes: B.5. YES. A Spot check of 8 inspections showed them to be complete. Reviewed IMP inspections NG-10-552, NG-10-107, & HL-10-017, OQ inspections NG-09-148, Standard inspections NG-10-087, NG-10-359, HL-10-011, & HL-10-013. 6 Did the state initiate appropriate follow-up actions to Safety Related Condition Reports? (Chapter 6.3) Previous Question B.6 Yes = .5 No = 0 DUNS: 150235299 2010 Natural Gas State Program Evaluation .5 .5 Oklahoma Oklahoma Corporation Commission, Page: 6\n\nSLR Notes: B.6. Yes, had 2 gas & 1 haz liq. SRCR are tracked similar to any other inspection, & updates are sent to the Feds. 7 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Previous Question B.7 Yes = .5 No = 0 SLR Notes: B.7. NA, there is no remaining cast iron in service in Oklahoma. .5 NA 8 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Previous Question B.8 Yes = .5 No = 0 SLR Notes: B.8. NA, there is no remaining cast iron in service in Oklahoma. .5 NA 9 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Previous Question B.9 Yes = .5 No = 0 .5 .5 SLR Notes: B.9. Yes, OCC queries the Operator, and addresses it during Standard and OQ inspections. OCC has created an addendum sheet to address this question. 10 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? (NTSB) Previous Question 1 1 B.10 Yes = 1 No = 0 SLR Notes: B.10. Yes, Incident investigations are placed in the Operator file, & that file is reviewed by the inspector as he prepares for an inspection. Also, the OCC Field Supervisor reviews all accidents and alerts inspectors to issues found. It is also on the Std Insp Form, and all significant accidents are followed up with on-site investigation. Compliance - 60105(a) States 11 Did the state adequately document sufficient information on probable violations? (Chapter 5.2) Previous Question B.14 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.11. Yes, the inspection reports and the NOPV are kept together as one document. 1 1 12 Does the state have written procedures to identify the steps to be taken from the discovery to the resolution of a probable violation as specified in the \"Guidelines for State Participating in the Pipeline Safety Program\"? (Chapter 5.1) Previous Question D(1).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.12. Yes, in SOP, Part 3 Procedure. 1 1 13 Does the state have written procedures to notify an operator when a noncompliance is identified as specified in the \"Guidelines for States Participating in the Pipeline Safety Program\"? (Chapter 5.1(4)) Previous Question D (1).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.13. Yes, in SOP, Part 3 Procedure, & the Department Guidelines, & the Commission Rules & Practice. 1 1 14 SLR Notes: DUNS: 150235299 2010 Natural Gas State Program Evaluation Does the state have a written procedure for routinely reviewing the progress of compliance actions to prevent delays or breakdowns of the enforcement process, as required by the \"Guidelines for States Participating in the Pipeline Safety Program\"? (Chapter 5.1(5)) Previous Question D(1).3 Yes = 1 No = 0 Needs Improvement = .5 1 1 Oklahoma Oklahoma Corporation Commission, Page: 7\n\nB.14. Yes, in SOP, Part 3 Procedure, & the Department Guidelines pg 8 of 8. 15 Has the State issued compliance actions for all probable violations discovered? (Note : PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation) Previous Question D(1).4 Yes = 1 No = 0 SLR Notes: B.15.Yes, 54 in 2010, 55 in 2009, 47 in 2008, 105 in 2007, & 87 in 2006. 1 1 16 Did the state follow its written procedures for reviewing compliance actions and follow-up to determine that prompt corrective actions were taken by operators, within the time frames established by the procedures and compliance correspondence, as required by the \"Guidelines for States Participating in the Pipeline Safety Program\"? Previous Question D(1).5 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.16.Yes, the OCC follows its own procedures. 1 1 17 If compliance could not be established by other means, did state pipeline safety program staff request formal action, such as a \"Show Cause Hearing\" to correct pipeline safety violations? (check each states enforcement procedures) Previous Question D(1).6 No = 0 Yes = 1 1 1 SLR Notes: B.17.Yes, the mechanism is in the SOP, sec 165:20-13-15. There were no actions in 2008, 2009, or 2010, & one action in 2007, to shut in a small town. A Show Cause Hearing is scheduled for July, 2011 for probable violations discovered in 2010 (Contempt ? Town of Freedom). As of July, 2011, an incident in 2010 is on track for a Show Cause Hearing (Contempt ? Enogex). 18 Did the state adequately document the resolution of probable violations? (Chapter 5.1 (6)) Previous Question 1 1 D(1).7 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.18. Yes, the NOPV & Operator response are placed in the Operator file, & if the operator response is sufficient, the case is closed by the Pipeline Section. The PV are recorded as violations, but no closure letter is generally sent to the Operator. If the Operator has contested the NOPV and gone to commissioner's court, then upon conclusion of the court, a court determination is placed in the public record, and the legal staff sends a letter of final resolution to the operator. A spot check of 8 inspections shows the records to be in compliance with the procedures. 19 Were compliance actions sent to a company officer? (manager or board member if municipal/government system) (Chapter 5.1(4)) Previous Question D(1).8 Yes = .5 No = 0 SLR Notes: B.19. Yes, it was done & the mechanism is in the SOP , pg 8 of 10. .5 .5 20 Did the compliance proceedings give reasonable due process to all parties? (check each states enforcement procedures) Previous Question D(1).9 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.20. Yes, due process was followed. 1 1 Compliance - 60106(a) States 21 Did the state use the current federal inspection form(s)? Previous Question D(2).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.21-26. NA, OCC is a 60105(a) program. 1 NA 22 Are results adequately documented demonstrating inspection units were reviewed in accordance with state inspection plan? Previous Question D(2).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.21-26. NA, OCC is a 60105(a) program. DUNS: 150235299 2010 Natural Gas State Program Evaluation 1 NA Oklahoma Oklahoma Corporation Commission, Page: 8\n\n23 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(2).3 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: B.21-26. NA, OCC is a 60105(a) program. 24 SLR Notes: Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(2).4 Yes = 1 No = 0 Needs Improvement = .5 1 NA B.21-26. NA, OCC is a 60105(a) program. 25 SLR Notes: Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(2).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA B.21-26. NA, OCC is a 60105(a) program. 26 SLR Notes: Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Previous Question D(2).6 Yes = 1 No = 0 Needs Improvement = .5 1 NA B.21-26. NA, OCC is a 60105(a) program. 27 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Info Only = No Points Info Only Info Only SLR Notes: B.27. Yes, Dennis knows the process for civil penalties, and the areas where he doesn't have civil penalty authority. Consideration for repeat violations is limited but for egregious and some repeat violations escalation of civil penalties are considered. Examples include both current Show Cause Hearings. 28 Part B: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: B.28. It is welcome news that you are nearly at full staff and will be authorized two additional positions by January, 2012. The heavy work load on OCC Pipeline Safety staff continued during 2010. A full performance position is expected to be 85-100 days out of office on inspections with the remainder of the 220 day man-year being spent in the office writing reports and doing follow up on issues found during those inspections. In 2010 it was observed that your staff spent 134 days out of the office on inspections which is an indication that your staff was overloaded. The PIPES ACT of 2006 makes it clear that pipeline safety involves more and more detailed inspections. Some of those additional inspections include: RP 1162, one-call, IMP, GIMP, SHRIMP, OQ, PIPES ACT (low pressure gathering), 192.8 gathering line definition, PAPEE, CRM, DIMP, etc. We appreciate your commitment for increased staffing. Total points scored for this section: 24 Total possible points for this section: 24 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 9\n\nPART C - Interstate Agent States Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Previous Question D(3).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with \"PHMSA directed inspection plan\"? Previous Question D(3).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Previous Question D(3).3 Yes = 1 No = 0 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 4 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(3).4 Yes = 1 No = 0 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(3).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: C.1-8. NA, not an Interstate Agent. 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(3).6 Yes = 1 No = 0 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Previous Question D(3).7 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA, not an Interstate Agent. 1 NA 8 Part C: General Comments/Regional Observations Info Only = No Points SLR Notes: C.1-8. NA, not an Interstate Agent. Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 10\n\nPART D - Incident Investigations Points(MAX) Score 1 Are state personnel following the procedures for Federal/State cooperation in case of an incident? (See Appendix in \"Guidelines for States Participating in the Pipeline Safety Program\") (Chapter 6.1) Previous Question E.1 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: NTSB. D.1. Yes, Appendix E specifies 1. Determine if safety violations occurred. 2. Determine root causes of the accident if asked by NTSB. 3. Cooperate with 2 Are state personnel familiar with the jurisdictional authority and Memorandum of Understanding between NTSB and PHMSA? (See Appendix in \"Guidelines for States Participating in the Pipeline Safety Program\") (Chapter 6 ? Appendix D) Previous Question E.2 Yes = .5 No = 0 SLR Notes: D.2. Yes, the MOU between NTSB and OPS is understood, and OCC fully cooperates with NTSB. .5 .5 3 Did the state keep adequate records of incident notifications received? Previous Question E.3 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: D.3. Yes, gas incidents are investigated and placed in the files. In addition, the incidents meeting State reporting criteria are in the files. 4 If an onsite investigation of an incident was not made, did the state obtain sufficient information by other means to determine the facts and support the decision not to go on-site? Previous Question E.4 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: D.4. Yes, In 2010, all 5 Federally reportable incidents were investigated on-site. In addition most state reportable incidents were investigated on-site. However the SOP provides for telephonic reporting and after-the-fact follow up. 5 Were investigations thorough and conclusions and recommendations documented in an acceptable manner? Previous Question E.5, comprehensive question worth 2 points total Yes = 2 No = 0 Needs Improvement = 1 a. Observations and Document Review 2 2 b. Contributing Factors c. Recommendations to prevent recurrences where appropriate SLR Notes: Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement D.5. Yes, yes, yes, OCC uses the federal Form 11 for incident investigations. The events are documented and Appendix E is followed. 6 Did the state initiate enforcement action for violations found during any incident investigation(s)? Previous Question E.6 Variation Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: D.6. Yes, the SOP dictates action similar to any other violation. 1 1 7 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports .5 0.5 to ensure accuracy and final report has been received by PHMSA? (validate annual report data from operators concerning incidents/accidents and investigate discrepancies) (Chapter 6) Previous Question E.7/E.8 Yes = .5 No = 0 SLR Notes: D.7 yes, OCC is a full partner with PHMSA to ensure that incident reports are accurate & updated, and the reports are reviewed for completeness & to ensure that a final report is submitted. 8 Part D: General Comments/Regional Observations Info Only Info Only Info Only = No Points SLR Notes: D.8. There were no fatalities but one injury in 2010 due to reportable incidents. Lack of span of control resulted in a crew doing work which inadvertently DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 11\n\ndefeated a gas lockout tag out, which allowed gas to go where it was not supposed to be which came in contact with spark which then ignited and caused burn injury to a member of another crew. All 5 Federally reportable incidents were investigated on-site. Total points scored for this section: 7 Total possible points for this section: 7 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 12\n\nPART E - Damage Prevention Initiatives Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? Previous Question B.11 Yes = 2 No = 0 Needs Improvement = 1 2 2 SLR Notes: question. E.1. Yes, it is addressed in standard inspections during review of line locate and one-call procedures. OCC has created an addendum sheet to address this 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? New 2008 Yes = 2 No = 0 SLR Notes: E.2. Yes, it is part of the Standard Inspection Forms for Form 1, Form 2, & Form 3. 2 2 3 Did the state encourage and promote the adoption of the Common Ground Alliance Best Practices document to 2 2 its regulated companies as a means of reducing damages to all underground facilities? Previous Question A.7 Yes = 2 No = 0 Needs Improvement = 1 SLR Notes: E.3. Yes, OCC gives a One-Call & RP 1162 Seminar every 18 months in conjunction with the TSI Seminars. They also give a One-Call & RP 1162 Seminar in the annual Municipal presentations. OK requires that either one call notifications be made or that pre-engineered & certified projects be followed. 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? New 2008 Yes = 1 No = 0 1 1 SLR Notes: E.4. Okay, OCC is focused on excavation line leaks not line hits. It is being counted and reported by Oklahoma One Call. Line locates were 3,966,025 in 2010 and Line leaks were 1684. Recommended to start capturing total count of reported line hits. Also recommended that One-Call laws be revised to specify the reporting of all line hits by operators and excavators. 5 Did the state review operators' records of accidents and failures due to excavation damage to ensure causes of failure are addressed to minimize the possibility of recurrence as required by 192.617? Yes = 2 No = 0 2 2 SLR Notes: E.5. Yes, Federal incident/accident forms and DIRT are used. 6 Part E: General Comments/Regional Observations Info Only = No Points SLR Notes: Info Only Info Only E.6. 49 CFR Part 198 has been adopted effective 7/1/2009. OCC continues to work on achieving the 9 elements of the 2006 PIPES ACT. Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 13\n\nPART F - Field Inspection Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: Eastok Pipeline, LLC OPID 32491, Tulsa Unit, Wagner 12\" Discharge Name of State Inspector(s) Observed: Rick Matthews, Randy Snyder, & Kelly, Phelps Location of Inspection: Eastok Pipeline, LLC, 2424 E 21st St., Ste 550, Tulsa, OK 74114 Date of Inspection: 4/18-19/2011 Name of PHMSA Representative: Patrick Gaume SLR Notes: Eastok Pipeline, LLC OPID 32491, Tulsa Unit, Wagner 12\" Discharge Rick Matthews, Randy Snyder, & Kelly, Phelps Eastok Pipeline, LLC, 2424 E 21st St., Ste 550, Tulsa, OK 74114 4/18-19/2011 Patrick Gaume Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? New 2008 Yes = 1 No = 0 SLR Notes: F.2. yes, and the inspection was held in the Operator's office. 5 operator and contract personnel participated in the inspection 1 1 3 Did the inspector use an acceptable inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Previous Question F.2 Yes = 2 No = 0 SLR Notes: F.3. yes, used the Federal Form 1, for Gas Transmission Standard Inspection, revision dated 4/6/2011. 2 2 4 Did the inspector thoroughly document results of the inspection? Previous Question F.3 Yes = 2 No = 0 SLR Notes: F.4. yes, the Federal Form 1 was used. The form was totally filled out. 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps, pyrometer, soap spray, CGI, etc.) New 2008 Yes = 1 No = 0 SLR Notes: F.5. Yes, he had system maps, multi meter, half cell, line locate equip, gate keys, cell phone, etc. 1 1 6 What type of inspection(s) did the state inspector conduct during the field portion of the state evaluation? (i.e. Standard, Construction, IMP, etc) New 2008 Info Only = No Points Info Only Info Only SLR Notes: F.6, It was a standard inspection of a gas transmission line with a field OQ for line locate, CP reading, and rectifier inspection. 7 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) New 2008, comprehensive question worth 2 points total Yes = 2 No = 0 Needs Improvement = 1 2 2 a. Procedures b. Records c. Field Activities/Facilities DUNS: 150235299 2010 Natural Gas State Program Evaluation Oklahoma Oklahoma Corporation Commission, Page: 14\n\nd. Other (Please Comment) SLR Notes: F.7. Yes, for Procedures, Records, Field, and OQ Protocol 9. 8 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Liaison will document reasons if unacceptable) Previous Question F.8 Yes = 2 No = 0 SLR Notes: F.8. yes, Rick & Randy showed good & adequate knowledge of the pipeline safety program goals and regulations. 2 2 9 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Previous Question F.10 Yes = 1 No = 0 1 1 SLR Notes: supports. F.9. Yes, he noted concerns about IR drop, line markers in line of sight, a regular review of abnormal operating procedures, and to install adjustable pipe 10 During the exit interview, did the inspector identify probable violations found during the inspections? Previous 1 1 Question F.11 Yes = 1 No = 0 SLR Notes: supports. F.10. Yes, he noted concerns about IR drop, line markers in line of sight, a regular review of abnormal operating procedures, and to install adjustable pipe 11 What did the inspector observe in the field? (Narrative description of field observations and how inspector Info Only Info Only performed) Info Only = No Points SLR Notes: F.11. Yes. Verified field equipment was available, the emergency valve at the compressor station was well marked and accessible, atmosphere corrosion, signs and pipeline markers, within normal operating pressures, locks and site security, fencing, emergency contact number, flange ratings, valve ratings, bolts and threads, line locate and marking, pig launcher and receiver, noted compressed air supply for compressor station instrumentation, pipe CP, new system has no casing, abundant secondary containment, discussed records relative to the amine and glycol units, condition of pipe supports, ROW, ROW encroachment, highway crossings, test stations, rectifier check and reading, valve spacing.","truncated":true,"body_characters":62502}