{"operation":"document","citation":"PHMSA sc-2021-gas-program-evaluation","title":"2021 SC NG Program Evaluation - sc-2021-gas-program-evaluation (South Carolina; Natural Gas State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2021-01-01","effective_on":null,"summary":"2021 PHMSA natural gas program evaluation for South Carolina.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-sc-ng-program-evaluation-sc-2021-gas-program-evaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-sc-ng-program-evaluation-sc-2021-gas-program-evaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-sc-ng-program-evaluation-sc-2021-gas-program-evaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2023-06/sc-2021-gas-program-evaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2021 Gas State Program Evaluation for Office of Regulatory Staff of South Carolina Document Legend PART: O -- Representative, Dates and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- State Qualifications D -- Program Performance E -- Field Inspections F -- Damage prevention and Annual report analysis G -- Interstate Agent/Agreement States DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 1\n\n2021 Gas State Program Evaluation -- CY 2021 Gas State Agency: South Carolina Rating: Agency Status: Date of Visit: 09/12/2022 - 09/14/2022 Agency Representative: Johnny Eustace PHMSA Representative: Don Martin Commission Chairman to whom follow up letter is to be sent: Name/Title: Nanette Edwards, Executive Director Agency: South Carolina Office of Regulatory Staff Address: 1401 Main Street, Suite 900 City/State/Zip: Columbia, South Carolina 29201 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Evaluator Guidance for conducting state pipeline safety program evaluations. The evaluation should generally reflect state program performance during CY 2021 (not the status of performance at the time of the evaluation). A deficiency in any one part of a multiple-part question should be scored as “Needs Improvement.” Determine the answer to the question then select the appropriate point value. If a state receives less than the maximum points, include a brief explanation in the appropriate notes/comments section. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and they OBJECTIVELY reflect the state's program performance for the question being evaluated. Increasing emphasis is being placed on how the state pipeline safety programs conduct and execute their pipeline safety responsibilities (their performance). This evaluation, together with selected factors reported in the state's annual progress report attachments, provide the basis for determining the state's pipeline safety grant allocation. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 0 0 B Program Inspection Procedures 15 15 C State Qualifications 10 10 D Program Performance 50 49 E Field Inspections 15 15 F Damage prevention and Annual report analysis 10 10 G Interstate Agent/Agreement States 0 0 TOTALS 100 99 State Rating................................................................................................................................................... 99.0 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 2\n\nPART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Were the following Progress Report Items accurate? (*items not scored on progress Info Only Info Only report) Info Only = No Points a. Stats On Operators Data - Progress Report Attachment 1 b. State Inspection Activity Data - Progress Report Attachment 2 c. List of Operators Data - Progress Report Attachment 3* d. Incidents/Accidents Data - Progress Report Attachment 4* e. Stats of Compliance Actions Data - Progress Report Attachment 5* f. List of Records Kept Data - Progress Report Attachment 6 * g. Staff and TQ Training Data - Progress Report Attachment 7 h. Compliance with Federal Regulations Data - Progress Report Attachment 8 i. Performance and Damage Prevention Question Data - Progress Report Attachment 10* Evaluator Notes: a. Compared to annual report information in PDM. No issues. b. A spreadsheet accounting for inspection person days was reviewed. No issues identified. c. Attachment 3 shows 18 MM inspection units. Attachment 1 shows 19 MM inspection units. Columbia Housing Authority is no longer MM. Program Manager contacted Carrie Winslow to correct Attachment 1. d. Incidents listed in Attachment 4 match incidents in the PDM. There were two incidents in CY2021. e. There were no probable violations found during CY2021. Three carryover probable violations from CY2020 were corrected during CY2021. f. No issues g. Training information in Attachment 7 was imported from Training and Qualification Division's (TQ) training database. h. The ORS has automatic adoption authority. No issues. i. No issues. Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 3\n\nPART B - Program Inspection Procedures Points(MAX) Score 1 Do written procedures address pre-inspection, inspection and post inspection activities 5 5 for each of the following inspection types: Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 a. Standard Inspections, which include Drug/Alcohol, CRM and Public Awareness Effectiveness Inspections b. TIMP and DIMP Inspections (reviewing largest operator(s) plans annually) c. OQ Inspections d. Damage Prevention Inspections e. On-Site Operator Training f. Construction Inspections (annual efforts) g. LNG Inspections Evaluator Notes: The SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program, revised 10/1/2020, were reviewed. The procedures were revised in 2022 but were not in effect during CY2021. a. Standard inspection procedures are contained in the procedures. Pre-inspection, inspection and post inspection information are located under Inspection Activity on pages 3-4. b. IMP & DIMP inspection procedures are located on pages 8 and 9 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 3-4. c. OQ Plan Inspections are listed on Page 2. OQ inspection procedures are located on page 7 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 3-4. d. Damage Prevention Inspection Activities are located on page 8 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 3-4. e. Onsite Operator training inspection activities are located on page 3 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 3-4. f. Construction inspection activities are located on pages 5-8 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 3-4. g. The SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program, revised 10/1/2020, were reviewed. Standard inspection procedures are contained in the procedures. All units, including the two LNG units in SC, are inspected annually. Pre-inspection, inspection and post-inspection information is located on pages 3-4. 2 Do written procedures address inspection priorities of each operator, and if necessary 4 4 each unit, based on the following elements and time frames established in its procedures? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Length of time since last inspection b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) c. Type of activity being undertaken by operators (i.e. construction) d. Locations of operator's inspection units being inspected - (HCA's, Geographic area, Population Centers, etc.) e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Operators and any Other Factors) f. Are inspection units broken down appropriately? Evaluator Notes: The SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program, revised 10/1/2020, was reviewed. Items (a. thru (e. are located on pages 2-4 in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. The procedures states that all operators will be inspected annually. The ORS has a spreadsheet that risk ranks Distribution Operators. f. Inspection units appear to be broken down correctly.DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 4\n\n3 (Compliance Procedures) Does the state have written procedures to identify steps to be 3 3 taken from the discovery to resolution of a probable violation? Chapter 5.1 Yes = 3 No = 0 Needs Improvement = 1-2 a. Procedures to notify an operator (company officer) when a noncompliance is identified b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns c. Procedures regarding closing outstanding probable violations Evaluator Notes: 13. The SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program, revised 10/1/2020, was reviewed. The procedure and process in the NON-COMPLIANCE INSPECTION GUIDELINES section on pages 9 through a. Notification procedures located in Paragraph 1 on pages 9 and 10. b. These procedures are located in Paragraph 5 through 10 on pages 10 through 11. c. These procedures are located in Paragraph 13 and 14 on page 12. 4 (Incident/Accident Investigations) Does the state have written procedures to address state 3 3 actions in the event of an incident/accident? Yes = 3 No = 0 Needs Improvement = 1-2 a. Mechanism to receive, record, and respond to operator reports of incidents, including after-hours reports b. If onsite investigation was not made, do procedures require on-call staff to obtain sufficient information to determine the facts to support the decision not to go on-site. Evaluator Notes: The SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program, revised 10/1/2020, was reviewed. a. Each gas system shall, as soon as possible, report to the ORS each incident occurring wherein there exist either: (a) serious injury or death of any person; (b) property damage in excess of $5,000, in the gas system's commercially reasonable estimation, including the gas system's cost of lost gas exiting the gas system's lines to a customer's meter and the expense to make repairs to its facilities or property; or (c) an event that is significant in the judgment of the gas system. Each gas system shall establish and follow procedures for analyzing, reporting and minimizing the possibilities of any future incidents. Operators are provided with program manager and staff 24/7 contact information. There is a reporting requirements link on the ORS website; however, the contact information for the Program Manager needs updating. b. The ORS procedures state that all reportable incidents will be investigated on-site on Page 9. 5 General Comments: Info Only = No Points Evaluator Notes: There were no findings resulting in the loss of points for Part B of this evaluation. Info Only Info Only Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 5\n\nPART C - State Qualifications Points(MAX) Score 1 Has each inspector and program manager fulfilled training requirements? (See Guidelines 5 5 Appendix C for requirements) Chapter 4.3 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead b. Completion of Required DIMP/IMP Training before conducting inspection as lead c. Completion of Required LNG Training before conducting inspection as lead d. Root Cause Training by at least one inspector/program manager e. Note any outside training completed f. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector (Reference State Guidelines Section 4.3.1) Evaluator Notes: PHMSA TQ's Blackboard Training Records were reviewed. a. - b. All inspectors have completed the training requirements to lead a TIMP/DIMP inspection and OQ Inspection. c. All inspectors have completed the training to lead a LNG inspection. d. All inspectors have completed the Root Cause course. e. No outside training noted. f. All inspectors and the Program Manager have completed the minimum required training courses and therefore are qualified to lead a Standard Inspection. 2 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Yes = 5 No = 0 Needs Improvement = 1-4 5 5 Evaluator Notes: The program manager has completed the minimum required training for leading a Standard Inspection, IMP/DIMP inspection, OQ inspection, LNG inspection and has taken Root Cause class. He understands the requirements of the grant program for annual document preparation and submittal. No issues were found with his knowledge of the pipeline safety program and its requirements. 3 General Comments: Info Only = No Points Evaluator Notes: There were no findings resulting in the loss of points for Part C of this evaluation. Info Only Info Only Total points scored for this section: 10 Total possible points for this section: 10 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 6\n\nPART D - Program Performance Points(MAX) Score 1 Did state inspect all types of operators and inspection units in accordance with time 5 5 intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 a. Standard (General Code Compliance) b. Public Awareness Effectiveness Reviews c. Drug and Alcohol d. Control Room Management e. Part 193 LNG Inspections f. Construction (did state achieve 20% of total inspection person-days?) g. OQ (see Question 3 for additional requirements) h. IMP/DIMP (see Question 4 for additional requirements) Evaluator Notes: A spreadsheet containing the operators and inspection units that were randomly selected for CY2021. The ORS entered the inspection completion dates into the spreadsheet. A review of the completed spreadsheet resulted in no issues. The ORS inspection person days for design, testing and construction inspections was 20% (76 of 387) of the total inspection person days. 2 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1. Do inspection records indicate that adequate reviews of procedures, records and field activities, including notes and the appropriate level of inspection person-days for each inspection, were performed? Yes = 10 No = 0 Needs Improvement = 1-9 a. Standard (General Code Compliance) b. Public Awareness Effectiveness Reviews c. Drug and Alcohol d. Control Room Management e. Part 193 LNG Inspections f. Construction g. OQ (see Question 3 for additional requirements) h. IMP/DIMP (see Question 4 for additional requirements) 10 10 Evaluator Notes: The inspection reports and forms were reviewed for any inspection conducted in CY2021 for the randomly selected operators. No issues were found with code requirements covered. All applicable portions of the forms were completed. 3 Is state verifying monitoring (Protocol 9/Form15) of operators OQ programs? This 2 2 should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals established in the operator's plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: A spreadsheet containing the operators and inspection units that were randomly selected for CY2021. The ORS entered the inspection completion dates into the spreadsheet. A review of the completed spreadsheet resulted in no issues. 4 Is state verifying operator's integrity management Programs (IMP and DIMP)? This should include a review of plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operator's plan(s). 49 CFR 192 Subparts O and P Yes = 2 No = 0 Needs Improvement = 1 a. Are the implementation plans of the state's large/largest operators(s) being reviewed annually to ensure they are completing full cycle of the IMP process? b. Are states verifying with operators any plastic pipe and components that have shown a record of defects/leaks and mitigating those through DIMP plan? 2 2 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 7\n\nc. Are the states verifying operators are including low pressure distribution systems in their threat analysis? Evaluator Notes: a. A spreadsheet containing the operators and inspection units that were randomly selected for CY2021. The ORS entered the inspection completion dates into the spreadsheet. A review of the completed spreadsheet resulted in no issues. IMP and DIMP implementation activity for largest transmission and distribution operators were reviewed annually. b. Yes. Annual report information and operator records are reviewed for plastic pipe failures. c. There are no low pressure systems in South Carolina. 5 Did the state review the following (these items are NTSB recommendations to PHMSA 2 2 that have been deemed acceptable response based on PHMSA reviewing these items during the evaluation process): Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 a. Operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken; b. Operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance); c. Operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21; d. Operator records of previous accidents and failures including reported third- party damage and leak response to ensure appropriate operator response as required by 192.617; e. Directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies; f. Operator procedures for considering low pressure distribution systems in threat analysis? g. Operator compliance with state and federal regulations for regulators located inside buildings? Evaluator Notes: (a. No cast iron reported by operators in SC. (b. No cast iron reported by operators in SC. (c. Question #5 on page 44 of the Distribution Standard Comprehensive Inspection form covers this requirement. (d. Question on page 42 of the Distribution Standard Comprehensive Inspection form covers this requirement. (e. The ORS added a Question on all standard comprehensive , Forms 1 and 2. (f. Operator procedures for considering low pressure distribution systems in threat analysis? The ORS has a question on Page 42 of its inspection form. (g. Operator compliance with state and federal regulations for regulators located inside buildings? The ORS has a question on Page 46 of its inspection form. The ORS sent an email requesting operators to respond to f. and g. The responses indicated that there are no low pressure systems or inside meter sets in South Carolina. 6 Did the State verify Operators took appropriate action regarding advisory bulletins issued since the last evaluation? (Advisory Bulletins Current Year) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: The NCUC provided the Advisory Bulletin page that is included in the inspection checklist for Standard Inspections. Advisory Bulletins issued since the last inspection are discussed with the operator. Discussed with operator at end of inspections. 7 (Compliance Activities) Did the state follow compliance procedures (from discovery to resolution) and adequately document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 Yes = 10 No = 0 Needs Improvement = 1-9 10 9 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 8\n\na. Were compliance actions sent to company officer or manager/board member if municipal/government system? b. Were probable violations documented properly? c. Resolve probable violations d. Routinely review progress of probable violations e. Did state issue compliance actions for all probable violations discovered? f. Can state demonstrate fining authority for pipeline safety violations? g. Does Program Manager review, approve and monitor all compliance actions? (note: Program Manager or Senior Official should sign any NOPV or related enforcement action) h. Did state compliance actions give reasonable due process to all parties? Including \"show cause\" hearing, if necessary. i. Within 30 days, conduct a post-inspection briefing with the owner or operator outlining any concerns j. Within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection. (Incident investigations do not need to meet 30/90-day requirement) Evaluator Notes: a. No issues. b. There were no probable violations found during CY2021. c. At the end of 2021, all probable violations prior to 2021 were corrected. d. All probable violations prior to 2021 were monitored and corrected. e. There were no probable violations found during CY2021. f. The ORS has not issued a civil penalty within the last ten years. One Point Deduction. g. Yes. h. Yes, enforcement procedures provide for due process. i. Yes j. Yes 8 (Incident Investigations) Were all federally reportable incidents investigated, thoroughly 10 10 documented, with conclusions and recommendations? Yes = 10 No = 0 Needs Improvement = 1-9 a. Does state have adequate mechanism to receive and respond to operator reports of incidents, including after-hours reports? b. Did state keep adequate records of Incident/Accident notifications received? c. If onsite investigation was not made, did the state obtain sufficient information from the operator and/or by means to determine the facts to support the decision not to go on site? d. Were onsite observations documented? e. Were contributing factors documented? f. Were recommendations to prevent recurrences, where appropriate, documented? g. Did state initiate compliance action for any violations found during any incident/accident investigation? h. Did state assist Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? i. Does state share any lessons learned from incidents/accidents? Evaluator Notes: The incident investigation forms were reviewed for the two incidents reported during CY2021. The information was obtained by phone call and virtual meetings. a. Operators are provided with program manager and staff 24/7 contact information. There is a reporting requirements link on the ORS website. The ORS has a form that is completed to capture initial reporting details of the incident. b. Records are kept on the network server hard drive. No issues. c. The two incidents were caused by third party excavation (boring), the ORS was able to confirm the cause and details of the incident without the need for an on-site investigation. d. The information was obtained by phone call and virtual meetings. e. There were no probable violations found for the pipeline operators. The ORS forwarded non-compliance by the excavator with damage prevention law to SC811 enforcement committee. DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 9\n\nf. No issues were identified with the ORS's assistance to the Region Office or AID. g. Details of incidents and lessons learned were shared with other Southern Region states during the NAPSR Southern Region Meeting. 9 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The ORS responded in nine days. 1 1 10 Did State conduct or participate in pipeline safety training session or seminar in Past 3 Years? Chapter 8.5 Info Only = No Points Evaluator Notes: The ORS is conducting a seminar in November, 2022. Due to Covid, last seminar in 2019. Info Only Info Only 11 Has state confirmed transmission operators have submitted information into NPMS database along with changes made after original submission? Info Only = No Points Evaluator Notes: ORS uses federal standard form which includes this question. It is the first question on the form. Info Only Info Only 12 Does the state have a mechanism for communicating with stakeholders - other than state 1 1 pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The ORS's webpage was reviewed. It provides a good source of communication with stakeholders The ORS has added a drop box for access to all of the inspection forms used by the ORS. The ORS staff also makes presentations at local Utility Coordinating Committee meetings and the annual CPGA and SGA meetings. 13 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: There were no SRC reports filed by an operator during CY2021. 1 1 14 Was the State responsive to: Yes = 1 No = 0 Needs Improvement = .5 a. Surveys or information requests from NAPSR or PHMSA; and b. PHMSA Work Management system tasks? Evaluator Notes: There were no known instances where the ORS did not respond. 1 1 15 If the State has issued any waivers/special permits for any operator, has the state verified 1 1 conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The ORS has one active waiver concerning the use of high pressure PE pipe that was not covered in standards for use. The operator must comply with a condition that requires pipe samples to be removed and tested once every three years. The ORS has verified that the operator complies with this condition and reviews testing results. The operator removed sample(s) in CY2019. The next year for sampling and testing is CY2022. DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 10\n\n16 Were pipeline program files well-organized and accessible? Info Only Info Only Info Only = No Points Evaluator Notes: Files, reports and records are kept electronically. They are easily accessible. No issues during the CY2021 Program Evaluation. 17 Discussion with State on accuracy of inspection day information submitted into State Inspection Day Calculation Tool (SICT). Has the state updated SICT data? Yes = 3 No = 0 Needs Improvement = 1-2 3 3 Evaluator Notes: Excerpt from communication to the ORS concerning peer review results: Below is your calendar year 2022 Inspection-day requirement(s) along with your state specific operator summary in attached excel file. Gas Program 346 days Peer review notes: No concerns. 18 Discussion on State Program Performance Metrics found on Stakeholder Communication Info Only Info Only site.\\ http://primis.phmsa.dot.gov/comm/states.htm?nocache=4805 Info Only = No Points Evaluator Notes: Excavation damages per 1000 tickets (EDT) continued a downward trend in 2020 (positive performance). SC's EDT in 2020 is 3.1 which continues a 10 year downward trend. The National Average is slightly below 3. SC has initiated a committee to enhance enforcement actions. The ORS has a seat on the committee which provides a direct link to Attorneys General office to pursue prosecutions. Leak forms are sent to SC 811 so they can be put in a dashboard to analyze damages including identifying geographical areas that are problems. Inspection person days per 1000 miles reached a high point of 11.2 in 2013. Since 2013 there is a trend downward (negative direction) to 8 but the ORS continues to exceed the minimum number contained in the SICT. Inspector Qualification reached 100% in 2018 and continued at 100% through 2020. Gas Distribution System Leaks - Number of leak repairs is trending level with a slight reduction in CY2021; however, outstanding leaks to be repaired at end of year are trending upward. ORS is monitoring this issue. Enforcement - ORS has not reached 100% due to program evaluation scoring \"Needs Improvement\" on the lack issuing civil penalties. 19 Did the state encourage and promote operator implementation of Pipeline Safety Management Systems (PSMS), or API RP 1173? This holistic approach to improving pipeline safety includes the identification, prevention and remediation of safety hazards. Info Only = No Points a. https://pipelinesms.org/ b. Reference AGA recommendation to members May 20, 2019 Info Only Info Only Evaluator Notes: The ORS included SMS on its agenda during the pipeline safety seminar attended by operators. Erin Kurilla from APGA spoke at Seminar and included SMS. Gary McDonald of TQ also presented SMS. The ORS will be holding a pipeline safety seminar in 2022. A section of the agenda on November 3rd will be dedicated to promoting SMS. 20 General Comments: Info Only = No Points Evaluator Notes: Question D.7 - The ORS has not issued a civil penalty within the last ten years. One Point Deduction. Info Only Info Only Total points scored for this section: 49 Total possible points for this section: 50 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 11\n\nPART E - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative (enter specifics into the comments box below) Info Only = No Points a. What type of inspection(s) did the state inspector conduct during the field portion of the state evaluation? (i.e. Standard, Construction, IMP, etc) b. When was the unit inspected last? c. Was pipeline operator or representative present during inspection? d. Effort should be made to observe newest state inspector with least experience Info Only Info Only Evaluator Notes: The ORS conducted construction inspections for two main extension projects on Dominion Energy South Carolina's distribution system in Conway, SC. One project involved the installation of 3700 feet of 2 inch main utilizing open trenching on September 12, 2022. The second project involved the installation of 350 feet of 2 inch PE main utilizing horizontal directional drilling on September 13, 2022. The ORS inspector was John Iglesias. Dominion was represented by Mark Kurilla, Supervisor of Engineering Projects, and Spencer Turner, Construction Inspector III. The inspection unit was last inspected in December, 2021. 2 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: The ORS inspector used the ORS's New Steel and Plastic Pipeline Construction Form. The form covered all requirements for the construction of gas distribution pipeline facilities The inspector used the form as a guide while observing the construction activities and procedures. 3 Did the inspector adequately review the following during the inspection 10 10 Yes = 10 No = 0 Needs Improvement = 1-9 a. Procedures (were the inspector's questions of the operator adequate to determine compliance?) b. Records (did the inspector adequately review trends and ask in-depth questions?) c. Field Activities/Facilities (did inspector ensure that procedures were being followed, including ensuring that properly calibrated equipment was used and OQ's were acceptable?) d. Other (please comment) e. Was the inspection of adequate length to properly perform the inspection? Evaluator Notes: A meeting was conducted with the Supervisor of Engineering Projects to cover Dominion Energy's construction procedures on the morning of September 12 prior to departing for the construction sites. Records for materials, test equipment and joining qualifications were reviewed. The inspector was very thorough in his coverage of the regulations. The length of the inspection was appropriate for the activities that were being performed. 4 From your observation did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: There were no issues with the inspector's knowledge. 2 2 5 Did the inspector conduct an exit interview, including identifying probable violations? (If inspection is not totally completed the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: The ORS conducted an exit interview at the end of the day on September 13, 2022. Dominion Energy representatives were Mark Kurilla and Spencer Turner. The inspector stated there were no probable violations found during the inspection. DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 12\n\n6 Was inspection performed in a safe, positive, and constructive manner ? Info Only = No Points a. No unsafe acts should be performed during inspection by the state inspector b. What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) c. Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) d. Other Info Only Info Only Evaluator Notes: Yes. A pre-inspection safety presentation was provided by the construction contractor's foreman at the job site. Potential hazards and personal protection equipment requirements were covered. The inspector observed condition of PE pipe, joining of PE by butt fusion and electrofusion, installation of pipe in ditch or bore hole along with tracer wire, use of proper equipment and joining qualifications of workers performing pipe fusion. 7 General Comments: Info Only = No Points Evaluator Notes: There were no issues found that resulted in the loss of points for Part E of this evaluation. Info Only Info Only Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 13\n\nPART F - Damage prevention and Annual report analysis Points(MAX) Score 1 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues. Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: During Pre-inspection activities, Annual Reports and Incident Reports are reviewed by inspectors. These are discussed with operators at the beginning of inspections. All operators reports are reviewed for accuracy. Excavation damage information on the Annual Reports is reviewed as detailed Questions F.2 and F.3. The ORS requires operators to submit annual report excavation damage data to the ORS on a monthly basis. The full year totals from the monthly data are compared to annual report submittals. 2 Has the state verified that the operators analyze excavation damages for the purpose of 2 2 determining root causes and minimizing the possibility of a recurrence? (192.617) Has the state verified that the operators have appropriately identified excavators who have repeatedly violated one-call laws and damaged their facilities. Have the operators taken steps to mitigate that risks? (192.1007) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: The excavation damage data collected by the ORS is provided to SC 811. SC 811 is putting the data into a dashboard for which all operators have access. The ORS analyzes the collected data and trends the data for each operator's system. After six months of collecting the data, the ORS will schedule a visit with each operator to discuss any issues found during the collection period. The visits will focus on the four causes in the Annual Reports along with ensuring operators are developing root cause identification and developing actions to minimize damages resulting from the root causes. 3 Has the state reviewed the operator's annual report pertaining to Part D - Excavation 4 4 Damage? Yes = 4 No = 0 Needs Improvement = 1-3 a. Is the information complete and accurate with root cause numbers? b. Has the state evaluated the causes for the damages listed under \"One-Call Notification Practices Not Sufficient\" (Part D.1.a.)? c. Has the state evaluated the causes for the damages listed under \"Locating Practices Not Sufficient\" (Part D.1.b)? For each operator, does the state review the following? d. Is the operator or its locating contractor(s) qualified and following written procedures for locating and marking facilities? e. Is the operator appropriately requalifying locators to address performance deficiencies? f. What is the number of damages resulting from mismarks? g. What is the number of damages resulting from not locating within time requirements (no-shows)? h. Is the operator appropriately addressing discovered mapping errors resulting in excavation damages? i. Are mapping corrections timely and according to written procedures? j. Has the state evaluated the causes for the damages listed under \"Excavation Practices Not Sufficient\" (Part D.1.c.)? Evaluator Notes: During 2021, the ORS and SC 811 agency worked on a plan to address the damages to pipelines in South Carolina. The ORS is collecting a monthly report from each operator which is input into a database. Damages by the four categories listed on the annual reports are summarized for each operator. a. Yes. b. Yes. c. Yes. d. It is monitored by the ORS. e. It is monitored by the ORS. f. 468 g. 65 h. Yes DUNS: 805889529 2021 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 14\n\ni. Yes j. Yes 4 Has the agency or another organization within the state collected data and evaluated 2 2 trends on the number of pipeline damages per 1,000 locate requests? Yes = 2 No = 0 Needs Improvement = 1 a. What stakeholder group is causing the highest number of damages to the pipelines? Operator, contractor, locating company or public. b. Has the state verified the operator is appropriately focusing damage prevention education and training to stakeholders causing the most damages? c. Has the state evaluated which of the following best describes the reason for the excavation damages; i.e., operator or contractor not following written procedures, failure to maintain marks, failure to support exposed facilities, failure to use hand tools were required, failure to test-hole (pot hole)","truncated":true,"body_characters":43144}