{"operation":"document","citation":"PHMSA tx-2009-gas-program-evaluation","title":"2009 TX NG Program Evaluation - tx-2009-gas-program-evaluation (Texas; Natural Gas State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2009-01-01","effective_on":null,"summary":"2009 PHMSA natural gas program evaluation for Texas.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2009-gas-program-evaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2009-gas-program-evaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2009-gas-program-evaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/subdoc/3421/tx-2009-gas-program-evaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2009 Natural Gas State Program Evaluation for RAILROAD COMMISSION OF TEXAS Document Legend PART: O -- Representative Date and Title Information A -- General Program Qualifications B -- Inspections and Compliance - Procedures/Records/Performance C -- Interstate Agent States D -- Incident Investigations E -- Damage Prevention Initiatives F -- Field Inspection G -- PHMSA Initiatives - Strategic Plan H -- Miscellaneous I -- Program Initiatives DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 1\n\n2009 Natural Gas State Program Evaluation -- CY 2009 Natural Gas State Agency: Texas Rating: Agency Status: Date of Visit: 08/23/2010 - 09/03/2010 Agency Representative: Mrs. Mary L. McDaniel, Director Safety Division PHMSA Representative: Mr. Patrick Gaume, State Liaison Commission Chairman to whom follow up letter is to be sent: Name/Title: Mr. Victor G. Carrillo, Chairman Agency: Railroad Commission of Texas Address: 1701 North Congress Ave. City/State/Zip: Austin, Texas 78711 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2009 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual certification/agreement attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART F): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART F, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A General Program Qualifications 26 25 B Inspections and Compliance - Procedures/Records/Performance 25 25 C Interstate Agent States 0 0 D Incident Investigations 7 7 E Damage Prevention Initiatives 9 9 F Field Inspection 12 12 G PHMSA Initiatives - Strategic Plan 10 10 H Miscellaneous 3 3 I Program Initiatives 9 9 TOTALS 101 100 State Rating................................................................................................................................................... 99.0 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 2\n\nPART A - General Program Qualifications Points(MAX) Score 8 7 1 Did the state submit complete and accurate information on the attachments to its most current 60105(a) Certification/60106 (a) Agreement? (NOTE: PHMSA Representative to verify certification/agreement attachments by reviewing appropriate state documentation. Score a deficiency in any one area as \"needs improvement\". Attachment numbers appear in parenthesis) Previous Question A.1, Items a-h worth 1 point each Yes = 8 No = 0 Needs Minor Improvement = 3-7 Needs Major Improvement = 2 a. State Jurisdiction and agent status over gas facilities (1) b. Total state inspection activity (2) c. Gas facilities subject to state safety jurisdiction (3) d. Gas pipeline incidents (4) e. State compliance actions (5) f. State record maintenance and reporting (6) g. State employees directly involved in the gas pipeline safety program (7) h. State compliance with Federal requirements (8) SLR Notes: correct. A.1 IMPROVEMENT NEEDED 7 points; D. 3 significant incidents were not reported on Attachment 4; #20090072, NRC 903371, Panther Pipeline, 4/21/09; #20090058, NRC 904121, ATMOS Pipeline, 4/29/09; 20090106, NRC 908572, ATMOS Energy, 6/15/09. All other information appeared to be 2 Did the state have an adequate mechanism to receive operator reporting of incidents to ensure state compliance with 60105(a) Certification/60106(a) Agreement requirements (fatality, injury requiring hospitalization, property damage exceeding $50,000 - Mechanism should include receiving \"after hours\" reports)? (Chapter 6) Previous Question A.2 Yes = 1 No = 0 1 1 SLR Notes: A.2. RRC meets the Federal reporting requirements. However with the new online damage reporting system, all damages to pipelines are reported regardless of value. Therefore the $5000 requirement was raised to match the Fed $50K requirement for telephonics effective March 2009. 3 Has the state held a pipeline safety TQ seminar(s) in the last 3 years? (NOTE: Indicate date of last seminar or if 2 2 state requested seminar, but T&Q could not provide, indicate date of state request for seminar. Seminars must be held at least once every 3 calendar years.) (Chapter 8.5) Previous Question A.4 Yes = 2 No = 0 SLR Notes: A.3. Yes, in June 2006, October 2007, with Louisiana in July, 2008, with Louisiana in July 2009, in Corpus Christi in June, 2010, & with LA & MS in July, 2010. The new practice is to request a seminar every year. 4 Were pipeline safety program files well-organized and accessible?(NOTE: This also includes electronic files) (Chapter 5) Previous Question A.5 Yes = 1 No = 0 SLR Notes: A.4. Yes, the paper files are in the Safety Division area. 1 1 5 Did state records and discussions with the state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? (Chapter 4.1, Chapter 8.1) Previous Question A.6 Yes = 2 No = 0 Needs Improvement = 1 SLR Notes: A.5. Yes, The Program Manager & the records review show a professional knowledge of the regulations. 2 2 6 Did the state respond in writing within 60 days to the requested items in the Chairman's letter following the Region's last program evaluation? (No response is necessary if no items are requested in letter and mark \"Yes\") (Chapter 8.1) Previous Question A.8 Yes = 1 No = 0 SLR Notes: A.6. Yes - A response to the Chairman letter was not required last year. 1 1 7 What actions, if necessary, did the State initiate as a result of issues raised in the Chairperson's letter from the previous year? Did actions correct or address deficiencies from previous year's evaluation? (No response is necessary if no items are requested in letter and mark \"Yes\") (Chapter 8.1) Previous Question A.8/A.9 DUNS: 028619182 2009 Natural Gas State Program Evaluation 1 1 Texas RAILROAD COMMISSION OF TEXAS, Page: 3\n\nYes = 1 No = 0 SLR Notes: A.7. Yes - RRC is continuing to improve its data base quality assurance such that reports will be more correct. Personnel and Qualifications 8 Has each inspector fulfilled the 3 year TQ training requirement? If No, has the state been granted a waiver regarding TQ courses by the Associate Administrator for Pipeline Safety? (NOTE: If the State has new inspectors who have not attended all TQ courses, but are in a program which will achieve the completion of all applicable courses within 3 years of taking first course (5 years to sucessfully complete), or if a waiver has been granted by the applicable Region Director for the state, please answer yes.) (Chapter 4.4) Previous Question A.10 Yes = 3 No = 0 3 3 SLR Notes: are scheduled for the rest. A.8. Yes, all inspectors with 3+ years of service have attended all T&Q core courses or are on the waiting list, and the new inspectors are taking courses and 9 Brief Description of Non-TQ training Activities: Info Only = No Points For State Personnel: A.9. State- all Inspectors are HAZWOPER certified and defensive driving trained. About half of the inspectors are H2S certified. In 2008 all employees attended the Anger Management and conflict in the Workplace 2 day seminar. All also attended a 1 day media training. In 2009, all hands took or renewed their HAZWOPER, and received instruction in using the new 'PEZ' database. In 2010 an All Hands meeting will focus in accident investigation and DIMP. For Operators: Operators ? training in PS 95 reporting of leak repairs (state requirement & state database), GIMP & DIMP training, and damage prevention program. For Non-Operator Entities/Parties, Information Dissemination, Public Meetings: Non-operator/public - the public was invited to the Damage prevention enforcement sessions. Info Only Info Only SLR Notes: A.9. State- all Inspectors are HAZWOPER certified and defensive driving trained. About half of the inspectors are H2S certified. In 2008 all employees attended the Anger Management and conflict in the Workplace 2 day seminar. All also attended a 1 day media training. In 2009, all hands took or renewed their HAZWOPER, and received instruction in using the new 'PEZ' database. In 2010 an All Hands meeting will focus in accident investigation and DIMP. Operators ? training in PS 95 reporting of leak repairs (state requirement & state database), GIMP & DIMP training, and damage prevention program. Non-operator/public - the public was invited to the Damage prevention enforcement sessions. 10 Did the lead inspectors complete all required T&Q OQ courses and Computer Based Training (CBT) before conducting OQ Inspections? (Chapter 4.4.1) Previous Question A.12 Yes = 1 No = 0 SLR Notes: A.10. Yes. Russell Pesek (TSI 299 12/03) is the OQ Lead. All inspectors with 3+ years are OQ certified. 1 1 11 Did the lead inspectors complete all required TQ Integrity Management (IMP) Courses/Seminars and CBT before conducting IMP Inspections? (Chapter 4.4.1) Previous Question A.13 Yes = 1 No = 0 1 1 SLR Notes: are completed). A.11. Yes. IMP Leads are Rickenson Daniel (TSI 297 6/05, TSI 294 9/07, CBT are completed); and Randy Vaughn (T&Q 297 8/01, T&Q 294 4/09, CBT 12 Was the ratio acceptable of Total inspection Person-days to Total Person-days charged to the program by state inspectors? (Region Director may modify points for just cause) (Chapter 4.3) Previous Question B.12 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 2768.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 20.12 = 4425.67 Ratio: A / B 2768.00 / 4425.67 = 0.63 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 DUNS: 028619182 2009 Natural Gas State Program Evaluation 5 5 Texas RAILROAD COMMISSION OF TEXAS, Page: 4\n\nSLR Notes: A.12. A=3450 person days. B=20.12 man years * 220 = 4426.4 person days. A/B= .7794 .7794>.38, okay. 13 Have there been modifications or proposed changes to inspector-staffing levels? (If yes, describe) Previous Info Only Info Only Question B.13 Info Only = No Points SLR Notes: A.13. Yes, In 2007 had 25 positions (Gas & Haz Liquid), with about 20 people for 2007. In 2008 they averaged 23 people. They asked for 9 more positions, 5 for damage prevention and 4 for pipeline safety in the January 2009 Legislative Session, and emergency funding to be able to hire one before Sept, 2009. The legislature approved 11.5 FTE effective Sept, 2009, and an additional FTE was approved for immediate hire (Feb, 2009). As of Aug 24th, they have 25 inspectors on staff, and, effective Sept 1, 2009, are approved for 5 more pipeline safety inspectors plus 5 more Damage Prevention FTEs. Staffing at the end of 2009 was 31 positions with 30 inspectors on staff plus 12 Damage Prevention personnel. 14 Part-A General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: A.14. In 2009, the leak survey, leak grading, and leak repairs became effective for all distribution operators in Texas. The first filing of the PS-95, leak repair data was filed in July 2009, followed by the second filing ending December 31, 2009. Based on the data received the pipeline safety staff began working on a risk based model to require the replacement of steel service lines in the State. At this time, the rule has been expanded to include a risk based replacement schedule for the greatest risks in distribution systems. The proposed rule is to compliment the federal DIMP program that becomes effective August 2011. Additionally, Pipeline Safety staff spent considerable time to recruit the additional eleven positions added to the program. A total of five pipeline safety inspectors were added and hired by the end of 2009, and the damage prevention enforcement program increased their staff by 5 positions. This year the Commission is undergoing the Sunset Review by the legislature and the Pipeline Safety program is sharing data regarding the operation and effectiveness of the program. A copy of the self evaluation report indicates the Commission is seeking authority to implement the damage prevention enforcement rules over interstate pipelines as well as the intrastate pipelines already covered. The second phase of the Pipeline Evaluation system PES was rolled out and the accident data base was delivered in February 2010. Total points scored for this section: 25 Total possible points for this section: 26 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 5\n\nPART B - Inspections and Compliance - Procedures/Records/ Performance Points(MAX) Score Inspection Procedures 1 Does the State have a written inspection plan to complete the following? (all types of operators including LNG) 6.5 6.5 (Chapter 5.1) Previous Question B.1 + Chapter 5 Changes + Incorporate LNG Yes = 6.5 No = 0 Needs Improvement = 50% Deduction a Standard Inspections (Including LNG) (Max points = 2) b IMP Inspections (Including DIMP) (Max points = .5) c OQ Inspections (Max points = .5) d Damage Prevention (Max points = .5) e On-Site Operator Training (Max points = .5) f Construction Inspections (Max points = .5) g Incident/Accident Investigations (Max points = 1) h Compliance Follow-up (Max points = 1) Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement SLR Notes: B.1. Yes, the procedure manual is best described as a collection of letters of direction. Std, IMP, OQ, Damage Prevention, On-Site operator Training, Constr, incident/accident, Compliance follow-up, & Specialized for Distr, transmission, Haz Liq, & Master Meter are all addressed. IMP-see TX 16 TAC 8.101; OQ-see SOP 16 B, Damage Prevention- as part of Std Insp; On-Site Training-see SOP 22 B & Form PS 55; Constr Insp- see SOP 24 B & TX 16 TAC 8.115; Acc.Inc-see SOP 20 B & SOP 24 hr Emergency Line and Performing On-Call Duties; Compliance Follow-up ? PEZ guidelines, Appendix A (Work in Progress through Closed), Appendix B, & Appendix C. LNG is not addressed because there is no State jurisdictional LNG facility. A procedures revision has been on-going for the last 2 years. 2 Did the written Procedures for selecting operators adequately address key concerns? (Chapter 5.1) Previous 2 2 Question B.2, items a-d are worth .5 point each Yes = 2 No = 0 Needs Improvement = 50% Deduction a Length of time since last inspection Yes No Needs Improvement b History of Operator/unit and/or location (including leakage , incident and compliance history) Yes No Needs Improvement c Type of activity being undertaken by operator (construction etc) Yes No Needs Improvement d For large operators, rotation of locations inspected Yes No Needs Improvement SLR Notes: B.2. Items a,b,c, & d are all found in Risk Factors for Pipeline Safety Work Plan & the letters of direction. Std-3 yr, Master Meters-5 yr, OQ-5yr, O&M-5 yr, IMP-5 yr, Damage Prevention addressed within a Std & an O&M. Inspection Performance 3 Did the state inspect all types of operators and inspection units in accordance with time intervals established in its written procedures? (Chapter 5.1) Previous Question B.3 Yes = 2 No = 0 2 2 SLR Notes: B.3. Yes, Units are being inspected in accordance with the Procedures and performance measures. Units are tracked through a data base which flags Systems ( a part of a Unit). In January, the data base prints out all systems that must be inspected in that calendar year. In the event a System is overdue, It is flagged as a 'top of the list' ultra high priority. If it is due in that year, it is flagged as a priority 1. 4 Did the state inspection form cover all applicable code requirements addressed on the Federal Inspection forms? (Chapter 5.1 (3)) Previous Question B.4 Yes = 1 No = 0 1 1 SLR Notes: B.4 Yes, RCC uses the Federal Forms for IMP, OQ, Accident, & Drug testing. The Texas accident and construction forms are better than the Federal Forms and they are used in addition to the Federal Forms. The Texas Std Insp Form is slightly less detailed than the Federal Form, & is used for special inspections. Starting in 2007, the RRC started using the Federal Std Insp Form once per Operator per Region once every three years. 5 Did state complete all applicable portions of inspection forms? (Chapter 5.1 (3)) Previous Question B.5 Yes = 1 No = 0 SLR Notes: B.5. Yes. Checked OQ, Std, & IMP inspections. NA items are now being explained on the Standard Inspection Form. DUNS: 028619182 2009 Natural Gas State Program Evaluation 1 1 Texas RAILROAD COMMISSION OF TEXAS, Page: 6\n\n6 Did the state initiate appropriate follow-up actions to Safety Related Condition Reports? (Chapter 6.3) Previous Question B.6 Yes = .5 No = 0 .5 .5 SLR Notes: B.6. Yes, in 2008, SRCR were tracked by Kendall Smith, an Engineering Specialist, & updates were sent to the Feds. In 2009 SRCR were passed to David Flores, Deputy Director, effective 7/1/09. 7 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Previous Question B.7 Yes = .5 No = 0 .5 .5 SLR Notes: B.7. Yes, It is part of the States' distribution Insp form. The only Operator with significant amounts of cast iron is Atmos Energy in the DFW area. There is also a pending Rule named 'Distributation Facility Replacements' that addressesd Cast Iron among several risk factors. 8 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Previous Question B.8 Yes = .5 No = 0 .5 .5 SLR Notes: B.8. Yes, It is part of the States' distribution Insp form. The only Operator with significant amounts of cast iron is Atmos Energy in the DFW area. There is also a pending Rule named 'Distributation Facility Replacements' that addressesd Cast Iron among several risk factors. 9 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Previous Question B.9 Yes = .5 No = 0 .5 .5 SLR Notes: the State Evaluation checklist. B.9. Yes, it is addressed in the Federal Pipeline Failure Investigation Report under 'Gas Migration Survey' on page 9 (Form 11 revised 03/17/06), & is on 10 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? (NTSB) Previous Question B.10 Yes = 1 No = 0 SLR Notes: B.10. Yes it is on the Std Insp Pre-evaluation checklist, and is reviewed prior to every Std Insp. 1 1 Compliance - 60105(a) States 11 Did the state adequately document sufficient information on probable violations? (Chapter 5.2) Previous 1 1 Question B.14 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: plus current. B.11. Yes, the inspections reports and the violation letter are kept together as one document. Filing is done by inspection. Records are retained at 4 years 12 Does the state have written procedures to identify the steps to be taken from the discovery to the resolution of a 1 1 probable violation as specified in the \"Guidelines for State Participating in the Pipeline Safety Program\"? (Chapter 5.1) Previous Question D(1).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.12. Yes, in the procedures, see Pipeline Evaluation System (PES) Appendices A, B, & C. Also letter dated August 10, 1994, memo dated May 10, 1990 & memo dated April 1, 1990. Also the new Procedures Manual is approaching completion. This information will be in the Pipeline Technical section. 13 Does the state have written procedures to notify an operator when a noncompliance is identified as specified in the \"Guidelines for States Participating in the Pipeline Safety Program\"? (Chapter 5.1(4)) Previous Question D 1 1 (1).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.13. Yes, in the procedures. See PES Appendix D & the violation form letter. DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 7\n\n14 Does the state have a written procedure for routinely reviewing the progress of compliance actions to prevent delays or breakdowns of the enforcement process, as required by the \"Guidelines for States Participating in the Pipeline Safety Program\"? (Chapter 5.1(5)) Previous Question D(1).3 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: B.14. Yes. Progress is tracked using a data-base to avoid delays in the enforcement process. A tracking report is automatically generated every week. 15 Has the State issued compliance actions for all probable violations discovered? (Note : PHMSA representative 1 1 has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation) Previous Question D(1).4 Yes = 1 No = 0 SLR Notes: B.15. Yes, all probable violations are addressed in writing per Standard Procedures (SOP). In addition the violation counts are found in the Gas Certification, attachment 5 summary page. 16 Did the state follow its written procedures for reviewing compliance actions and follow-up to determine that 1 1 prompt corrective actions were taken by operators, within the time frames established by the procedures and compliance correspondence, as required by the \"Guidelines for States Participating in the Pipeline Safety Program\"? Previous Question D(1).5 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.16. Yes, RRC requires a Plan of Correction (POC) from the Operator, the POC is reviewed using a Review of Operator Correspondence Form. The Operator Correspondence Form is used to guarantee full compliance. Starting in 2009, the on-line reporting system started being used for compliance reporting procedures. 17 If compliance could not be established by other means, did state pipeline safety program staff request formal action, such as a \"Show Cause Hearing\" to correct pipeline safety violations? (check each states enforcement procedures) Previous Question D(1).6 No = 0 Yes = 1 1 1 SLR Notes: B.17. Yes, there were some legal enforcement actions in 2009, resulting in $94,656 assessed and $94,656 in collected administrative penalties. Damage Prevention fines were $973,895 total in 2009. 18 Did the state adequately document the resolution of probable violations? (Chapter 5.1 (6)) Previous Question 1 1 D(1).7 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.18. Yes, the Violation letter & Operator response are placed in the Inspection file, & if the operator response is sufficient, the violation is closed by the appropriate Agency within the RRC. 19 Were compliance actions sent to a company officer? (manager or board member if municipal/government system) (Chapter 5.1(4)) Previous Question D(1).8 Yes = .5 No = 0 .5 .5 SLR Notes: Manager. B.19. Yes, in the case of some Master Meters & municipal; systems, two letters will be sent, one to the Owner / Mayor, and the other to the Operating 20 Did the compliance proceedings give reasonable due process to all parties? (check each states enforcement procedures) Previous Question D(1).9 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.20. Yes, due process is afforded all & is stated in the violation letters. 1 1 Compliance - 60106(a) States 21 Did the state use the current federal inspection form(s)? Previous Question D(2).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.21-26. NA. Not 60106(a). 1 NA 22 Are results adequately documented demonstrating inspection units were reviewed in accordance with state inspection plan? Previous Question D(2).2 DUNS: 028619182 2009 Natural Gas State Program Evaluation 1 NA Texas RAILROAD COMMISSION OF TEXAS, Page: 8\n\nYes = 1 No = 0 Needs Improvement = .5 SLR Notes: B.21-26. NA. Not 60106(a). 23 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(2).3 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: B.21-26. NA. Not 60106(a). 24 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(2).4 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: B.21-26. NA. Not 60106(a). 25 Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(2).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: B.21-26. NA. Not 60106(a). 26 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Previous Question D(2).6 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: B.21-26. NA. Not 60106(a). 27 Part B: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: B.27. The Pipeline Evaluation System (PES) is in its second year of operation, and has moved to Phase II to include more online data entry forms and details on accidents and incidents. For the distribution operations, the Leak Repair Data Form (PS-95) was fully implemented and operators completed two filings for CY2009. As a result of data filed, Commission staff have proposed a distribution facility replacement program to manage the issues identified through the leak repair data reports. The Safety Division was awarded 4 additional field positions and one deputy director position during the legislative session of 2009, and an additional field person was added as a result of a reorganization. Personnel training and qualification continue to be an area of focus as the staff has just recently reached the full complement of 31 field inspectors. Damage prevention has grown to 10 staff with 5 additional approved. The two year total of fines for damage prevention has grown to $1.5 MM, and the fines will continue in the $50 to $250 range until 2011 at least. Construction in the Barnett Shale continues to be active and a new play called the Eagleford Shale in South Texas (about 70 miles SW of San Antonio) has just recently become active. Total points scored for this section: 25 Total possible points for this section: 25 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 9\n\nPART C - Interstate Agent States Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Previous Question D(3).1 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with \"PHMSA directed inspection plan\"? Previous Question D(3).2 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Previous Question D(3).3 Yes = 1 No = 0 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 4 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Previous Question D(3).4 Yes = 1 No = 0 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Previous Question D(3).5 Yes = 1 No = 0 Needs Improvement = .5 1 NA SLR Notes: C.1-8. NA. Not an Interstate Agent. 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Previous Question D(3).6 Yes = 1 No = 0 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Previous Question D(3).7 Yes = 1 No = 0 Needs Improvement = .5 SLR Notes: C.1-8. NA. Not an Interstate Agent. 1 NA 8 Part C: General Comments/Regional Observations Info Only = No Points SLR Notes: C.1-8. NA. Not an Interstate Agent. Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 10\n\nPART D - Incident Investigations Points(MAX) Score 1 Are state personnel following the procedures for Federal/State cooperation in case of an incident? (See Appendix in \"Guidelines for States Participating in the Pipeline Safety Program\") (Chapter 6.1) Previous Question E.1 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: NTSB. D.1. Yes. Appendix C specifies 1. Determine if safety violations occurred. 2. Determine root causes of the accident if asked by NTSB. 3. Cooperate with 2 Are state personnel familiar with the jurisdictional authority and Memorandum of Understanding between NTSB and PHMSA? (See Appendix in \"Guidelines for States Participating in the Pipeline Safety Program\") (Chapter 6 ? Appendix D) Previous Question E.2 Yes = .5 No = 0 SLR Notes: D.2. Yes, the MOU between NTSB and OPS is understood, and RRC fully cooperates with NTSB. .5 .5 3 Did the state keep adequate records of incident notifications received? Previous Question E.3 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: answering service. D.3. Yes, 24 investigations, 27 reports, 149 phone calls. RRC has a full time employee to keep track of incident notifications. Also have an after hours 4 If an onsite investigation of an incident was not made, did the state obtain sufficient information by other means to determine the facts and support the decision not to go on-site? Previous Question E.4 Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: D.4. Yes, See Form PS-2. All incidents are checked by phone, and determination is made for an on-site visit. All of the Federally reportable incidents that the RRC was notified about had a field visit. 5 Were investigations thorough and conclusions and recommendations documented in an acceptable manner? Previous Question E.5, comprehensive question worth 2 points total Yes = 2 No = 0 Needs Improvement = 1 a. Observations and Document Review 2 2 b. Contributing Factors c. Recommendations to prevent recurrences where appropriate SLR Notes: Yes No Needs Improvement Yes No Needs Improvement Yes No Needs Improvement D.5. Yes, RRC uses its Form PS-55 for incident investigations, and supplement with Federal Form 11. The events are documented and Appendix C is followed. Including findings of fact, probable cause, and determine if Regulations were followed. 6 Did the state initiate enforcement action for violations found during any incident investigation(s)? Previous Question E.6 Variation Yes = 1 No = 0 Needs Improvement = .5 1 1 SLR Notes: appropriate. D.6. Yes, some violations were found. When violations are found, a violation letter is generated and follow up is done. Civil penalties are assessed when 7 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports .5 0.5 to ensure accuracy and final report has been received by PHMSA? (validate annual report data from operators concerning incidents/accidents and investigate discrepancies) (Chapter 6) Previous Question E.7/E.8 Yes = .5 No = 0 SLR Notes: D.7. Yes, the Safety Division has almost daily contact with PHMSA SW Region and DC to ensure that incident reports are accurate & updated. The reports are reviewed for completeness & to ensure that a final report is submitted. Corrective Action Orders are considered. 8 Part D: General Comments/Regional Observations Info Only Info Only Info Only = No Points SLR Notes: D.8. Incidents continue to be a highly visible issue for the Commission. The Commission has designed a system to be tied into the PES system and became DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 11\n\nactive in February 2010. Additionally, both pipeline operators and excavators started using the on-line damage prevention accident reporting program. One- call enforcement generated nearly $1MM in revenues at $50-$250 fines at a time. The Commission has seen a reduction of the number of 3rd party hits in 2009. The Commission has adopted rules for distribution operators for leak survey, leak grading, and leak reporting to help find leaks and repair them prior to the incident. Also, the Commission is proposing rules to require distribution facility replacements to complement the federal DIMP efforts. Total points scored for this section: 7 Total possible points for this section: 7 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 12\n\nPART E - Damage Prevention Initiatives Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? Previous Question B.11 Yes = 2 No = 0 Needs Improvement = 1 2 2 SLR Notes: E.1. Yes, Texas is very aware of this and has investigated incidents/accidents related to boring. This is a priority review with Texas, it is on Texas' insp check list & is part of the Third Party Damage Review (DIRT). 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? New 2008 Yes = 2 No = 0 2 2 SLR Notes: E.2. Yes, The Operator has to self report its excavation plans and results into the Texas on-line reporting system it and includes line marking and One-call. These reports are verified during Std and Damage prevention inspections. 3 Did the state encourage and promote the adoption of the Common Ground Alliance Best Practices document to 2 2 its regulated companies as a means of reducing damages to all underground facilities? Previous Question A.7 Yes = 2 No = 0 Needs Improvement = 1 SLR Notes: E.3. Yes, RRC participated in several damage prevention seminars, & a new damage prevention rule extending authority over excavators was approved by the RRC on May 30, 2007, & it became effective on Sept 1st, 2007. At present, TX has a law that names several CGA best Practices, The RRC Regulation names 10 additional CGA best practices, and the Damage Prevention Program staff is very active in enforcing Damage Prevention. There is pending regulation to require that 10 additional CGA best practices be followed. 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? New 2008 Yes = 1 No = 0 1 1 SLR Notes: E.4. Yes, The Damage Prevention Staff is getting the raw numbers of one-calls and line hits from One-call and the on-line reporting site, and is doing follow-up on almost every damage report that is filed. For CY 2009 the raw data shows 9,736 hits, 15,637 hit reports, and 1,677,282 one-calls. 5 Did the state review operators' records of accidents and failures due to excavation damage to ensure causes of failure are addressed to minimize the possibility of recurrence as required by 192.617? Yes = 2 No = 0 2 2 SLR Notes: E.5. Yes, review of accident records and failure records to discover causes of failure is a major duty of the Damage Prevention Staff. 6 Part E: General Comments/Regional Observations Info Only = No Points Info Only Info Only SLR Notes: E.6. The TX damage prevention program is off to a great start, but there is much more that can and is being proposed to be done. The Commissioners are very supportive of this project and have requested staff to increase the base penalty amounts. Operator and excavator training, effective treatment of repeat offenders, and adoption of more Best Practices such as Ticket life, and ownership of the Dig ticket, are just some of the areas that need additional work. The Commission has added field staff dedicated to damage prevention, and the employees are in their field training at this time. It is anticipated by the end of the calendar year, the damage prevention field personnel will be conducting inspections that focus only on damage prevention and accident prevention. Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 028619182 2009 Natural Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 13\n\nPART F - Field Inspection Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: City Public Service Board (dba CPS Energy), opid 18104 Name of State Inspector(s) Observed: Mr. Johnny Burgess, TRC Engr Spec 4 Location of Inspection: 613 Mission Road, San Antonio, TX 78210, South Gate Pipeline Date of Inspection: 8/30-9/1/10 Name of PHMSA Representative: Pat Gaume SLR Notes: F.1 City Public Service Board (dba CPS Energy), opid 18104 Mr. Johnny Burgess, TRC Engr Spec 4 613 Mission Road, San Antonio, TX 78210, South Gate Pipeline, 30\", 47 Miles, from San Antonio to Karnes, Co TX 8/30-9/1/10 Pat Gaume Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? New 2008 Yes = 1 No = 0 SLR Notes: F.2 Yes, CPS was notified & 8 CPS personnel participated in the inspection. 1 1 3 Did the inspector use an acceptable inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Previous Question F.2 Yes = 2 No = 0 2 2 SLR Notes: F.3 Yes, used a computer based form based on the current Texas Transmission Evaluation Checklist. The Texas form is used twice out of every 3 inspections, and the Federal form is used once out of every 3 inspections. 4 Did the inspector thoroughly document results of the inspection? Previous Question F.3 Yes = 2 No = 0 SLR Notes: F.4 Yes 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps, pyrometer, soap spray, CGI, etc.) New 2008 Yes = 1 No = 0 1 1 SLR Notes: various tools, etc. F.5 Yes, multi-","truncated":true,"body_characters":60548}