{"operation":"document","citation":"PHMSA tx-2018-gas-program-evaluation","title":"2018 TX NG Program Evaluation - tx-2018-gas-program-evaluation (Texas; Natural Gas State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2018-01-01","effective_on":null,"summary":"2018 PHMSA natural gas program evaluation for Texas.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2018-gas-program-evaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2018-gas-program-evaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-tx-ng-program-evaluation-tx-2018-gas-program-evaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2020-03/tx-2018-gas-program-evaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2018 Gas State Program Evaluation for RAILROAD COMMISSION OF TEXAS Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 1\n\n2018 Gas State Program Evaluation -- CY 2018 Gas State Agency: Texas Rating: Agency Status: Date of Visit: 07/15/2019 - 09/20/2019 Agency Representative: Stephanie Weidman, Pipeline Safety Director PHMSA Representative: Agustin Lopez, State Liaison Michael Thompson, State Liason Commission Chairman to whom follow up letter is to be sent: Name/Title: Wayne Christian, Chairman Agency: Railroad Commission of Texas Address: 1701 N. Congress City/State/Zip: Austin, Texas 78711-2967 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2018 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 9 B Program Inspection Procedures 13 13 C Program Performance 49 44 D Compliance Activities 15 13 E Incident Investigations 11 11 F Damage Prevention 8 8 G Field Inspections 12 12 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 118 110 State Rating................................................................................................................................................... 93.2 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 2\n\nPART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: RRC tracks the inspection types and days in their database, PES (Pipeline Evaluation System). PES tracks the inspections from inspector packages and weekly work reports. Verified inspections for 2018 and seem to be accurate. 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: RRC tracks the inspection days in their database, PES (Pipeline Evaluation System). Verified inspections days and they seem to be accurate. 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Verified operators in Attachment 3 with PDM annual reports. The number of operators seem accurate. 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, verified federally reportable incidents in PDM with Attachment 4 and they all seem to be accurate. 1 1 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Reviewed PES and verified compliance activities submitted in Attachment 5 .The numbers seem to be accurate. There is a concern on the increased number of carry over compliance actions from previous years. There were 1348 carry over in 2017 which increased to 1738 in 2018 which was discussed with the RRC. There is an increase in number of inspectors which is a reason for the increase of violations. This issue was a concern in last year's evaluation which has not improved. The RRC needs to improve on closing out cases specifically on cases that span over a year. (SEE QUESTION D2 FOR POINT LOSS) 6 Were pipeline program files well-organized and accessible? - Progress Report 2 1 Attachment 6 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: All program files are kept electronically in PES and are easily accessed. There seems to be a tracking issue in identifying pipeline pipelines after they are transferred from one unit to another or sold to another operator. While reviewing inspections in PES, there were several systems that had changed units and were difficult to track where the system had transferred. The RRC needs to improve in the way pipeline transfers are documented. 7 Was employee listing and completed training accurate and complete? - Progress Report 1 1 Attachment 7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Verified training with T&Q Blackboard and there's seems to be missing qualified inspectors in Blackboard. The problem seems to be with the most veteran inspectors. RRC will contact T&Q to check on the discrepancies. DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 3\n\n8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: All regulations and amendments adopted for Parts, 191, 192, 193, 198, 199 1 1 9 List of Planned Performance - Did state describe accomplishments on Progress Report in 1 1 detail - Progress Report Attachment 10 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they listed the following as one part. In 2018, Pipeline Safety inspectors completed approximately 2,046 gas safety evaluations of 509 operators (this includes master meter operators), for which we sent 358 violation letters citing 1,770 alleged violations. Also, during 2018, we reported 1,380 violations as corrected; this number includes violations that were cited in previous years. Also, the Commission collected a total of $204,725 in enforcement penalties for gas enforcement cases. 10 General Comments: Info Only Info Only Info Only = No Points Evaluator Notes: A.5-There is an increase in the number of carry over from the previous years. There were 1348 carry over in 2017 which increased to 1738 in 2018 which was discussed with the RRC. There is an increase in number of inspectors which is a reason for the increase of violations. This issue was a concern in last year's evaluation which has not improved. The RRC needs to improve on closing out cases specifically on cases that span over a year. (SEE QUESTION D.2 FOR POINT DEDUCTION) A.6- All program files are kept electronically in PES and are easily accessed. There seems to be a tracking issue in identifying pipeline pipelines after they are transferred from one unit to another or sold to another operator. While reviewing inspections in PES, there were several systems that had changed units and were difficult to track where the system had transferred. The RRC needs to improve in the way pipeline transfers are documented. Total points scored for this section: 9 Total possible points for this section: 10 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 4\n\nPART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspection procedures should give guidance to state inspectors that insure 2 2 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Standard Operating Procedure (SOG) 3: Routine Comprehensive Evaluation Procedures give guidance to the inspectors to perform standard inspections. Procedures include pre and post inspection procedures. 3.1 - Pre inspection, 3.2 DATA Collection for pre and post inspections. 2 IMP and DIMP Inspection procedures should give guidance to state inspectors that insure 1 1 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: SOG 6.1 TIMP Procedures and SOG 6.2 DIMP Procedures give guidance to inspectors for performing IM inspections. TXRRC - has given all inspectors access to PDM and training on how to utilize it for pre inspection activities. 3 OQ Inspection procedures should give guidance to state inspectors that insure 1 1 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: SOG 6.3 has OQ Inspection procedures which has details for performing OQ inspections. The procedures give enough guidance to inspectors to perform OQ inspections. OQ inspections are on a five year inspection cycle. 4 Damage Prevention Inspection procedures should give guidance to state inspectors that 1 1 insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post- inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: SOG 6.7 has details for Damage Prevention Inspections. Procedures give guidance to state inspectors that insure consistency in all inspections conducted by the state addressing pre-inspection activities, inspection activities, and post-inspection activities. Jim Ousterhaus retired in 2018. Stephanie is the Director for the Damage Prevention Section of RRC. Damage Prevention has 10.17 person years dedicated to program. 5 Any operator training conducted should be outlined and appropriately documented as needed. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Section 5 of SOG has operator training and how it is conducted and documented. 1 1 6 Construction Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 Need to add OQ verification of technicians while performing construction covered tasks. TAX 8.115 is Texas law that requires operators to report any new construction 30 days prior to constructing more than 1 mile of pipe. Law is changing to 60 day notice and .1 miles of new pipe. The New Construction Lead Inspector must successfully DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 5\n\ncomplete required TQ courses prior to conducting any new construction inspections. This person should lead the evaluation with the assistance of other participating team members, if a team is utilized, and is to remain present during the duration of the evaluation. 7 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection (Within five year interval) Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: The RRC has developed a risk based formula in which PES uses to prioritize inspections. The risk base formula uses all of the following elements: a. Inspection intervals are at 5 year intervals. b. Operating history is included in their unit inspection risk ranking c. Procedures include activities undertaken by operator. d. HCA's and population are part of the unit risk ranking. e. SOG 3 was amended last year to include the tracking of incidents and causes which include Excavation damage. corrosion, natural outside forces, material and welds, equipment, operators and other factors. f. Units are broken down mostly by operating area for Distribution and by mileage for Transmission. Procedures need to be amended to include that each LNG facility will be inspected at 3 year intervals. 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only The RRC of TX is mainly complying with Part B of the Evaluation. B.6-Need to add to procedures that during construction inspections, OQ of technicians while performing construction covered tasks will be verified. B.7-Procedures need to be amended to include that each LNG facility will be inspected at 3 year intervals. Total points scored for this section: 13 Total possible points for this section: 13 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 6\n\nPART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 Yes = 5 No = 0 5 5 A. Total Inspection Person Days (Attachment 2): 8116.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 41.80 = 9194.90 Ratio: A / B 8116.00 / 9194.90 = 0.88 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Verified inspection days submitted in the Progress Report to verify inspection person days to total person days ratio. Ratio meets the required of .38. 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector. Yes No Needs Improvement Evaluator Notes: a. Yes, all OQ lead inspectors have completed all required courses. b. Yes, all IMP/DIMP lead inspectors have completed all required courses. c.Yes, there are several inspectors who have completed the Root Cause Course. d. New inspectors attend a training provided at an operators facility. Working on providing additional training to inspectors. e. Yes, reviewed inspection reports to assure qualified inspectors are leading inspection types in which they are qualified to lead. 3 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Stephanie Weidman is knowledgeable of the pipeline safety rules and regulations. 2 2 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct 2 2 or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the Chairman responded within the 60 days, letter was sent on February 8, 2019 and response was received on March 28, 2019. 5 Did State conduct or participate in pipeline safety training session or seminar in Past 3 Years? Chapter 8.5 Yes = 1 No = 0 Evaluator Notes: Yes, the RRC conducts Pipeline Safety Seminars once a year. The last seminar was August 21-22, 2018 1 1 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 7\n\n6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 5 2 Evaluator Notes: No, the RRC is still behind on their inspection cycles on DIMP, TIMP, CRM, PAPEI and OQ inspections. There are many operators that have not been inspected within their established intervals of 5 years. The RRC is improving and with the retention of inspectors and growth they expect to be in compliance in the near future. 7 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Yes, the RRC utilizes the PHMSA forms and also have state forms to guide the inspectors during an inspection. 8 Did the state review operator procedures for determining if exposed cast iron pipe was 1 1 examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: Have PHMSA Form which was modified to include all NTSB and ADB questions included in the Evaluation. Cast iron examination is question 27 and 28 of form. 9 Did the state review operator procedures for surveillance of cast iron pipelines, including 1 1 appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: The RRC utilizes a form which resembles PHMSA Forms which have been modified to include the review of operator procedures for survelliance of cast iron pipelines. 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 Yes = 1 No = 0 1 1 Evaluator Notes: The RRC utilizes a form which resembles PHMSA Forms which have been modified to include the review of operator emergency procedures for leaks caused by excavation damage near buildings and to determine if procedures address multiple leaks. 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: 1 1 Accidents and failures are reviewed during inspections to assure operator response is appropriate as required by 192.617. 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Their procedures state that they will review annual reports and accident report for accuracy and analyze for trends. The RRC reviews the reports and analyzes for issues, trends or concerns. They utilize this data as part of their risk ranking of inspections.DUNS: 028619182 Texas 2018 Gas State Program Evaluation RAILROAD COMMISSION OF TEXAS, Page: 8\n\n13 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: Review and verify NPMS data during standard inspections. The question is included in the standard inspection forms. 14 Is the state verifying operators are conducting drug and alcohol tests as required by 2 1 regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the RRC is conducting Drug and Alcohol inspections on a yearly basis. Reviewed Drug and Alcohol inspections to verify the RRC is assuring operators are complying with CFR 199. Only issue is that the RRC is not conducting D&A inspections within their established inspection cycles, which per their procedures is every 5 years. 15 Is state verifying operators OQ programs are up to date? This should include verification 2 1 of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the RRC is conducting OQ inspections on a yearly basis. Reviewed OQ inspections to verify the RRC is assuring operators are complying with CFR 192 Part N. Only issue is that the RRC is not conducting OQ inspections within their established inspection cycles, which per their procedures is every 5 years. 16 Is state verifying operator's gas transmission integrity management programs (IMP) are 2 2 up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually? Are replies to Operator IM notifications addressed? (formerly part of Question C-13)). 49 CFR 192 Subpart 0 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the RRC is conducting IMP inspections on a yearly basis. Reviewed IMP inspections to verify the RRC is assuring operators are complying with CFR 193 Subpart O. Only issue is that the RRC is not conducting IMP inspections within their established inspection cycles, which per their procedures is every 5 years. This issue is identified in question C.6 as a point deduction. 17 Is state verifying operator's gas distribution integrity management Programs (DIMP)? 2 2 This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually?). 49 CFR 192 Subpart P Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the RRC conduct DIMP inspections on a yearly basis. Reviewed DIMP inspections to verify the RRC is assuring operators are complying with CFR 192 Subpart P. Only issue is that the RRC is not conducting DIMP inspections within their established inspection cycles, which per their procedures is every 5 years. This issue is identified in question C.6 as a point deduction. 18 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. PAPEI Effectiveness Inspections should be conducted every four years by operators. 49 CFR 192.616 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: DUNS: 028619182 2018 Gas State Program Evaluation 2 2 Texas RAILROAD COMMISSION OF TEXAS, Page: 9\n\nYes, the RRC is conducting Public Awareness (PAPEI) program inspections on a yearly basis. Reviewed PAPEI inspections to verify the RRC is assuring operators are complying with CFR 192.616. Only issue is that the RRC is not conducting PAPEI inspections within their established inspection cycles, which per their procedures is every 5 years. This issue is identified in question C.6 as a point deduction.. 19 Does the state have a mechanism for communicating with stakeholders - other than state 1 1 pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Communicate with stakeholders by a subscription email service provide to public to receive information on seminars, meetings, etc. Also posts enforcement cases online for the public to view. 20 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) 1 1 Reports? Chapter 6.3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, the RRC has a dedicated person to track the submittals of SRCR. Reviewed their datasheet which demonstrates the tracking of the SRCR. 21 Did the State ask Operators to identify any plastic pipe and components that has shown a 1 1 record of defects/leaks and what those operators are doing to mitigate the safety concerns? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The RRC has modified their inspection forms to include this question so the inspectors can verify with the operator of any known defects of plastic pipe and components and what they do to mitigate problem. 22 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, the RRC responds to surveys from NAPSR or PHMSA. 1 1 23 If the State has issued any waivers/special permits for any operator, has the state verified 1 1 conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: State has open waivers that have been approved. The waiver to Cinco Pipeline has no future provisions the operator has to meet. There were stipulations that the operator had to meet before the installation of the flex steel piping. The RRC does not have any record to verify the stipulations were met. The RRC did supply documentation that the pipeline has been abandoned and is no longer in service. Monument Pipeline waiver was rejected. Fasken Pipeiine waiver was rejected. RRC has included Waiver Request in PES which helps track the Waivers. In the future the TX RRC needs to verify all conditions of waivers are met and keep records of the verification. 24 Did the state attend the NAPSR National Meeting in CY being evaluated? No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: Alan Mann attended the National meeting due to the program manager being on maternity leave. 1 1 25 DUNS: 028619182 2018 Gas State Program Evaluation Discussion on State Program Performance Metrics found on Stakeholder Communication site - http://primis.phmsa.dot.gov/comm/states.htm 2 2 Texas RAILROAD COMMISSION OF TEXAS, Page: 10\n\nNo = 0 Needs Improvement = 1 Yes = 2 a. Discussion of Potential Accelerated Actions (AA's) based on any negative trends Yes No Needs Improvement b. NTSB P-11-20 Meaningful Metrics Yes No Needs Improvement Evaluator Notes: Damages per 1,000 locates is gathered by the Damage Prevention section of the RRC. Their damages per 1,000 is 2.57. Discussed the steady increase of leaks repaired, hazardous leaks repaired and scheduled leaks to be repaired with Stephanie Weidman. Increase is due to more advanced leak survey equipment being utilized by operators. Inspector training has been trending in a positive way. 26 Discussion with State on accuracy of inspection day information submitted into State 1 1 Inspection Day Calculation Tool (SICT) Has the State updated SICT data? No = 0 Yes = 1 Evaluator Notes: Discussed SICT calculation with Stephanie Weidman and there is no issues or concerns in meeting the inspection days in the future. Reviewed numbers and there does not seem to be any issues with the numbers submitted in the SICT. 27 Did the State verify Operators took appropriate action regarding Pipeline Flow Reversals, Product Changes and Conversions to Service? See ADP-2014-04 Needs Improvement = .5 No = 0 Yes = 1 1 1 Evaluator Notes: Discussed with RRC the verification of flow reversals. Recommend to the RRC add question to their Inspection Form to verify that the operator takes appropriate action during flow reversals. 28 General Comments: Info Only Info Only Info Only = No Points Evaluator Notes: C.6- The RRC is still behind on their inspection cycles on DIMP,TIMP and PAPEI inspections. There are many operators that have not been inspected within their established intervals of 5 years. The RRC is improving and with the retention of inspectors and growth they expect to be in compliance in the near future. Loss of 2 Points C15-C18 - RRC is not conducting Drug and Alcohol, OQ, PAPEI, IMP and DIMP nspections per their procedures. Procedures state they will conduct each type of inspection every 5 years. C,27-Discussed with RRC the verification of flow reversals. Recommend to the RRC add question to their Inspection Form to verify that the operator takes appropriate action during flow reversals. Total points scored for this section: 44 Total possible points for this section: 49 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 11\n\nPART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement c. Procedures regarding closing outstanding probable violations Yes No Needs Improvement Evaluator Notes: a. Procedures states that all compliance notifications are sent to company officers. b. Section 11, addresses the review of open compliance cases to avoid breakdowns. If no response or plan of correction is received, the RRC issues a delinquent letter to the operator. PES calculates the due date and keeps track of delinquent cases. c. Lead inspectors review the Plan of Corrections to assure the operator has responded to all probable violations. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 2 document all probable violations, including what resolution or further course of action is needed to gain compliance? (Incident Investigations do not need to meet 30/90 day requirement) Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Document probable violations Yes No Needs Improvement c. Resolve probable violations Yes No Needs Improvement d. Routinely review progress of probable violations Yes No Needs Improvement e. Within 30 days, conduct a post-inspection briefing with the owner or operator of the gas or hazardous liquid pipeline facility inspected outlining any concerns; and Yes No Needs Improvement f. Within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection. Yes No Needs Improvement Evaluator Notes: a. Reviewed many inspection reports and found that compliance actions are being sent to company officers. b. Reviewed inspection reports and found Drug and Alcohol inspections that did not document probable violations found during the inspection. c. There seems to be some delay in resolving or closing out compliance actions. The number of carry over have increased in the last several years. There are some open compliance actions dating back to 2017. d. The review of the progress of probable violations needs to improve. There are open compliance actions dating back to 2017. e. Yes, the RRC conducts and documents post inspection briefings after each inspection. f. Yes, the RRC provides the operator written notice of all preliminary findings. In addition, all compliance letters reviewed were issued within 90 days. Recommend to add the civil penalty amounts to be addressed in each compliance letter sent to operators. 3 Did the state issue compliance actions for all probable violations discovered? Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: 2 instances were found in the 251 randomly sampled inspections performed during the evaluation. Not seen as a systemic issue, advised the PM to have each inspector highlight the cells were an unsatisfactory has been found so the reviewer can see them easily. They are also in the process of creating a new data base system that will track the unsatisfactory, so as they are input into the inspection form the unsatisfactory items transfer automatically to the compliance letter. 4 Did compliance actions give reasonable due process to all parties? Including \"show cause\" hearing if necessary. Yes = 2 No = 0 Evaluator Notes: DUNS: 028619182 2018 Gas State Program Evaluation 2 2 Texas RAILROAD COMMISSION OF TEXAS, Page: 12\n\nYes the RRC gives due process to all parties. SOG 11.2 has Pleading proceedings for operators to contest cases which is addressed in their state code under TAC Chapter 1 5 Is the program manager familiar with state process for imposing civil penalties? Were 2 2 civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Stephanie Weidnman is familiar with the civil penalty process. TAC 8.135 is state rules which has civil penalty process and explains amounts of civil penalty based on severity of violations. Recommend to reference the TAC 8.135 code in their SOG which has civil penalty process. 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, the RRC issued Civil Penalties in 2018. Reviewed inspections which Civil Penalties were issued. 1 1 7 General Comments: Info Only Info Only Info Only = No Points Evaluator Notes: D.2- b. Reviewed inspection reports and found Drug and Alcohol inspections that did not document probable violations found during the inspection. c. There seems to be some delay in resolving or closing out compliance actions. The number of carry over have increased in the last several years. There are some open compliance actions dating back to 2017. d. The review of the progress of probable violations needs to improve. There are open compliance actions dating back to 2017. D.5-Recommend to reference the TAC 8.135 code in their SOG which has civil penalty process. Total points scored for this section: 13 Total possible points for this section: 15 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 13\n\nPART E - Incident Investigations Points(MAX) Score 1 Does the state have written procedures to address state actions in the event of an incident/ 2 2 accident? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: SOG Section 8 has procedures for addressing incident/accident actions and investigations. Section 8.1.1.2 addresses the need for documentation to verify there's sufficient data gathered if no onsite investigation was made. 2 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: Yes, the RRC has a 24 hour answering system that transfers calls to on-call inspector. Section 18 has incident procedures. On site investigation will be conducted on all PHMSA reportable incidents. a. Have acknowledgement of MOU between NTSB and PHMSA. b. Have acknowledgement of MOU and of federal/state cooperation in case of an incident/accident. 3 If onsite investigation was not made, did state obtain sufficient information from the 1 1 operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Most reportable incidents were investigated on-site. There was enough information gathered on the incidents that were not investigated on-site. 4 Were all incidents investigated, thoroughly documented, and with conclusions and 3 3 recommendations? Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: a. The RRC documents all incident investigations in the Incident Form and is uploaded to PES. Reports that were reviewed were well documented. b. Yes, incident investigations had contributing factors in the report. c. The RRC reviews the operators recommendations and plans of action to prevent recurrence of the incidents. 5 Did the state initiate compliance action for violations found during any incident/accident investigation? Yes = 1 No = 0 Evaluator Notes: Yes, there were several incident investigations that resulted in the issuance of compliance actions. 1 1 6 Did the state assist Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 1 1 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 14\n\nYes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The RRC assists the Accident Investigation Division (AID) when they ask for information or assistance. 7 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) Yes = 1 No = 0 Evaluator Notes: Yes, the RRC shares lessons learned during the NAPSR SW Region meeting. 1 1 8 General Comments: Info Only = No Points Evaluator Notes: The RRC is mainly complying with Part E of the Evaluation. Info Only Info Only Total points scored for this section: 11 Total possible points for this section: 11 DUNS: 028619182 2018 Gas State Program Evaluation Texas RAILROAD COMMISSION OF TEXAS, Page: 15\n\nPART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or 2 2 its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, the RRC has modified their inspection forms to included the review of directional/boring procedures of each pipeline operator. Question 27 and 31 of the transmission and distribution form covers this topic. 2 Did the state inspector verify pipeline operators are following their written procedures 2 2 pertaining to notification of excav","truncated":true,"body_characters":53463}