{"operation":"document","citation":"PHMSA wa-2020-hazardous-liquid-program-evaluation","title":"2020 WA HL Program Evaluation - wa-2020-hazardous-liquid-program-evaluation (Washington; Hazardous Liquid State Program Evaluation)","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2020-01-01","effective_on":null,"summary":"2020 PHMSA hazardous liquid program evaluation for Washington.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-wa-hl-program-evaluation-wa-2020-hazardous-liquid-program-evaluation.json","markdown":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-wa-hl-program-evaluation-wa-2020-hazardous-liquid-program-evaluation.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-state-evaluation-wa-hl-program-evaluation-wa-2020-hazardous-liquid-program-evaluation","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2022-05/wa-2020-hazardous-liquid-program-evaluation.pdf","body":"1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2020 Hazardous Liquid State Program Evaluation for Washington Utilities and Transportation Commission Document Legend PART: O -- Representative, Dates and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- State Qualifications D -- Program Performance E -- Field Inspections F -- Damage prevention and Annual report analysis G -- Interstate Agent/Agreement States DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 1\n\n2020 Hazardous Liquid State Program Evaluation -- CY 2020 Hazardous Liquid State Agency: Washington Rating: Agency Status: 60105(a): Yes 60106(a): No Interstate Agent: Yes Date of Visit: 04/08/2021 - 04/08/2021 Agency Representative: Sean May, Director, Pipeline Safety Division, WAUTC PHMSA Representative: David Lykken, Transportation Specialist, State Programs Division Commission Chairman to whom follow up letter is to be sent: Name/Title: David W. Danner, Chairman Agency: Washington Utilities and Transportation Commission Address: 621 Woodland Square Loop SE City/State/Zip: Lacey, WA 98503 INSTRUCTIONS: Complete this evaluation in accordance with the Evaluator Guidance for conducting state pipeline safety program evaluations. The evaluation should generally reflect state program performance during CY 2020 (not the status of performance at the time of the evaluation). A deficiency in any one part of a multiple-part question should be scored as “Needs Improvement.” Determine the answer to the question then select the appropriate point value. If a state receives less than the maximum points, include a brief explanation in the appropriate notes/comments section. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and they OBJECTIVELY reflect the state's program performance for the question being evaluated. Increasing emphasis is being placed on how the state pipeline safety programs conduct and execute their pipeline safety responsibilities (their performance). This evaluation, together with selected factors reported in the state's annual progress report attachments, provide the basis for determining the state's pipeline safety grant allocation. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 0 0 B Program Inspection Procedures 15 15 C State Qualifications 10 10 D Program Performance 50 50 E Field Inspections 15 15 F Damage prevention and Annual report analysis 6 6 G Interstate Agent/Agreement States 0 0 TOTALS 96 96 State Rating................................................................................................................................................... 100.0 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 2\n\nPART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Were the following Progress Report Items accurate? (*items not scored on progress Info Only Info Only report) Info Only = No Points a. Stats On Operators Data - Progress Report Attachment 1 b. State Inspection Activity Data - Progress Report Attachment 2 c. List of Operators Data - Progress Report Attachment 3* d. Incidents/Accidents Data - Progress Report Attachment 4* e. Stats of Compliance Actions Data - Progress Report Attachment 5* f. List of Records Kept Data - Progress Report Attachment 6 * g. Staff and TQ Training Data - Progress Report Attachment 7 h. Compliance with Federal Regulations Data - Progress Report Attachment 8 i. Performance and Damage Prevention Question Data - Progress Report Attachment 10* Evaluator Notes: a & c) Operator/Inspection Unit totals on Attachment 1 are consistent with the Operator/Inspection Unit totals on Attachment 3. b) No issues. d & e) No issues. g) Information verified through T&Q Blackboard training site. Training for personnel found to be complete and accurate. h) All rule amendments have been adopted to date. Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 3\n\nPART B - Program Inspection Procedures Points(MAX) Score 1 Do written procedures address pre-inspection, inspection and post inspection activities for each of the following inspection types: Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 a. Standard Inspections, which include Drug/Alcohol, CRM and Public Awareness Effectiveness Inspections b. IMP Inspections c. OQ Inspections d. Damage Prevention Inspections e. On-Site Operator Training f. Construction Inspections (annual efforts) 5 5 Evaluator Notes: Yes. Sections referenced come from the program's written Policy & Procedures Manual. a. Section 14 General and Specialized Insp Procedures, Section 15. Entire section devoted to Pre, Inspection, and Post inspection activities; b. HL IMP - Section 23; c. OQ - Section 17; d. Damage Prevention activities under Section 31; e. Section 27 - Training and Outreach Policy; f. Section 21 Design, Testing & Construction inspections; 2 Do written procedures address inspection priorities of each operator, and if necessary each unit, based on the following elements and time frames established in its procedures? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Length of time since last inspection b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) c. Type of activity being undertaken by operators (i.e. construction) d. Locations of operator's inspection units being inspected - (HCA's, Geographic area, Population Centers, etc.) e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Operators and any Other Factors) f. Are inspection units broken down appropriately? 4 4 Evaluator Notes: Yes. a thru e - Sections 13 and 13.1 Workplan Development and Scheduling. f) Units apportioned appropriately. 3 (Compliance Procedures) Does the state have written procedures to identify steps to be 3 3 taken from the discovery to resolution of a probable violation? Chapter 5.1 Yes = 3 No = 0 Needs Improvement = 1-2 a. Procedures to notify an operator (company officer) when a noncompliance is identified b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns c. Procedures regarding closing outstanding probable violations Evaluator Notes: Yes. Sections referenced taken from the program's Policy & Inspection Manual. a thru c addressed under Sections 15 (Standard Intra Inspections & Correspondence), 25 (Compliance Enforcement Tracking Policy), Section 26 (Follow-up Inspection Policy), and Section 34 (Compliance and Enforcement Policy). Section 37 (Civil Penalty Consideration Factor Policy). 4 (Incident/Accident Investigations) Does the state have written procedures to address state actions in the event of an incident/accident? Yes = 3 No = 0 Needs Improvement = 1-2 a. Mechanism to receive, record, and respond to operator reports of incidents, including after-hours reports 3 3 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 4\n\nb. If onsite investigation was not made, do procedures require on-call staff to obtain sufficient information to determine the facts to support the decision not to go on-site. Evaluator Notes: Yes. Section 10 (On-Call and Telephonic Notification), Section 20 (Response to Pipeline Incidents), Section 24 (Investigations Policy), Section 24-A (Level of Investigation Matrix). 5 General Comments: Info Only = No Points Evaluator Notes: No issues. No point deductions. Info Only Info Only Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 5\n\nPART C - State Qualifications Points(MAX) Score 1 Has each inspector and program manager fulfilled training requirements? (See Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead b. Completion of Required IMP Training before conducting inspection as lead c. Root Cause Training by at least one inspector/program manager d. Note any outside training completed e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector (Reference State Guidelines Section 4.3.1) 5 5 Evaluator Notes: a. Yes. All inspectors including the Chief Engineer and PM have attended and successfully completed required OQ training. b. Lead inspectors had the required training. c. Nine inspectors including PM and Chief Engineer have completed Root Cause training. d. None in CY2020 e. All inspection staff who led HL standard inspections conducted in 2020 were qualified. 2 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 5 No = 0 Needs Improvement = 1-4 5 5 Evaluator Notes: Yes. Sean Mayo demonstrated adequate knowledge of program and regulations and has attended and successfully completed all core classes required for the PM position. Sean has been with the program four years. 3 General Comments: Info Only = No Points Evaluator Notes: No issues noted. No deductions. Info Only Info Only Total points scored for this section: 10 Total possible points for this section: 10 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 6\n\nPART D - Program Performance Points(MAX) Score 1 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 a. Standard (General Code Compliance) b. Public Awareness Effectiveness Reviews c. Drug and Alcohol d. Control Room Management e. Construction (did state achieve 20% of total inspection person-days?) f. OQ (see Question 3 for additional requirements) g. IMP (see Question 4 for additional requirements) Evaluator Notes: A review of inspection history showed no deficiencies. 5 5 2 Did inspection form(s) cover all applicable code requirements addressed on Federal 10 10 Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1. Do inspection records indicate that adequate reviews of procedures, records and field activities, including notes and the appropriate level of inspection person-days for each inspection, were performed? Yes = 10 No = 0 Needs Improvement = 1-9 a. Standard (General Code Compliance) b. Public Awareness Effectiveness Reviews c. Drug and Alcohol d. Control Room Management e. Construction f. OQ (see Question 3 for additional requirements) g. IMP (see Question 4 for additional requirements) Evaluator Notes: Yes. The program utilizes the IA application for conducting most inspection types except construction and annual operator reviews. IA now used for conducting D&A inspections. 3 Is state verifying monitoring (Protocol 9/Form15) of operators OQ programs? This 2 2 should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals established in the operator's plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Protocol 9 inspections are conducted during annual reviews, standard, construction inspections and accident investigations when they occur. 4 Is state verifying operator's integrity management Programs (IMP)? This should include a 2 2 review of plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operator's plan(s). 49 CFR 192 Subpart P Yes = 2 No = 0 Needs Improvement = 1 a. Are the state's largest operator(s) plans being reviewed annually to ensure they are completing the full cycle of the DIMP/IMP process? Evaluator Notes: Yes. As a general policy, Integrity Management inspections will be conducted within five years. Intervals have been met. Program changes and Integrity management activities reviewed during the annual operator review inspection. DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 7\n\n5 Did the state review the following (these items are NTSB recommendations to PHMSA 2 2 that have been deemed acceptable response based on PHMSA reviewing these items during the evaluation process): Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 a. Operator records of previous accidents and failures including reported third- party damage and leak response to ensure appropriate operator response as required by 195.402; and b. Directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies; Evaluator Notes: Items covered and included in the UTC Operator Annual Review Checklist. b. Reviewed under IA procedural questions PD. OC.ODPROGRAM.P and IM.RA.INFOCONSIDERED.P 6 Did the State verify Operators took appropriate action regarding advisory bulletins issued since the last evaluation? (Advisory Bulletins Current Year) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: Yes. Question is incorporated into the Operator Annual Review Checklist along with a link to the PHMSA web site. Also addressed during HL operator meetings. 7 (Compliance Activities) Did the state follow compliance procedures (from discovery to 10 10 resolution) and adequately document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 Yes = 10 No = 0 Needs Improvement = 1-9 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? b. Were probable violations documented properly? c. Resolve probable violations d. Routinely review progress of probable violations e. Did state issue compliance actions for all probable violations discovered? f. Can state demonstrate fining authority for pipeline safety violations? g. Does Program Manager review, approve and monitor all compliance actions? (note: Program Manager or Senior Official should sign any NOPV or related enforcement action) h. Did state compliance actions give reasonable due process to all parties? Including \"show cause\" hearing, if necessary. i. Within 30 days, conduct a post-inspection briefing with the owner or operator outlining any concerns j. Within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection. (Incident investigations do not need to meet 30/90-day requirement) Evaluator Notes: Yes to items a thru j. Non-compliance letter reviewed. Correspondence sent to appropriate company official. Correspondence did not exceed the 90 day requirement. The program has demonstrated it's fining authority having most recently collected civil penalties in CY2017. 8 (Accident Investigations) Were all federally reportable incidents investigated, thoroughly documented, with conclusions and recommendations? Yes = 10 No = 0 Needs Improvement = 1-9 a. Does state have adequate mechanism to receive and respond to operator reports of incidents, including after-hours reports? b. Did state keep adequate records of Incident/Accident notifications received? c. If onsite investigation was not made, did the state obtain sufficient information from the operator and/or by means to determine the facts to support the decision not to go on site? DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation 10 10 Washington Washington Utilities and Transportation Commission, Page: 8\n\nd. Were onsite observations documented? e. Were contributing factors documented? f. Were recommendations to prevent recurrences, where appropriate, documented? g. Did state initiate compliance action for any violations found during any incident/accident investigation? h. Did state assist Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? i. Does state share any lessons learned from incidents/accidents? Evaluator Notes: No reportable HL incidents in CY2020. a. Pipeline operators contact the 24-Hr Emergency Response line which is then directed to the on-call engineer. b &c Yes, when applicable. d & e. Yes. g. Yes, when applicable. h. The program maintains communications with PHMSA AID and Western Region offices during reportable events. I. Yes, during seminars and annual NAPSR meetings. 9 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The program did not have any HL point deductions. No response required. 1 1 10 Did State conduct or participate in pipeline safety training session or seminar in Past 3 Years? Chapter 8.5 Info Only = No Points Evaluator Notes: Info Only Info Only Yes. HL operator face to face meeting held February 3rd, 2020. Agenda and PowerPoint presentation reviewed. 11 Has state confirmed transmission operators have submitted information into NPMS database along with changes made after original submission? Info Only = No Points Evaluator Notes: Yes. Question #2 on the program's \"Operator Annual Review Checklist\". Info Only Info Only 12 Does the state have a mechanism for communicating with stakeholders - other than state 1 1 pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. As noted last year. The UTC web site provides information and links to other external resources including Call Before You Dig, State and Federal Pipeline Safety Rules, Pipeline News, Completed inspection reports, forms and compliance letters, Failure Investigation reports, enforcement action information, and the Citizens Committee on Pipeline Safety. 13 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, when applicable. No HL SRC's reported in CY2020. 1 1 14 Was the State responsive to: Yes = 1 No = 0 Needs Improvement = .5 1 1 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 9\n\na. Surveys or information requests from NAPSR or PHMSA; and b. PHMSA Work Management system tasks? Evaluator Notes: Yes. Reviewed PM emails to NAPSR in response to certain requests for data and Survey Monkey results. 15 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: None for hazardous liquids. 1 1 16 Were pipeline program files well-organized and accessible? Info Only = No Points Evaluator Notes: No issues. Utilizes Quickbase application for managing files. Info Only Info Only 17 Discussion with State on accuracy of inspection day information submitted into State Inspection Day Calculation Tool (SICT). Has the state updated SICT data? Yes = 3 No = 0 Needs Improvement = 1-2 Evaluator Notes: No issues. PM reviews and adjusts estimates as needed. 3 3 18 Discussion on State Program Performance Metrics found on Stakeholder Communication Info Only Info Only site.\\ http://primis.phmsa.dot.gov/comm/states.htm?nocache=4805 Info Only = No Points Evaluator Notes: Yes. Discussed performance metrics. No significant changes. The WA-UTC metrics appeared to be at reasonable performance levels. Excavation damages per 1000 tickets (requested) continues to trend down since 2015 averaging approximately 3.0 damages in CY2020. 19 Did the state encourage and promote operator implementation of Pipeline Safety Info Only Info Only Management Systems (PSMS), or API RP 1173? This holistic approach to improving pipeline safety includes the identification, prevention and remediation of safety hazards. Info Only = No Points a. https://pipelinesms.org/ b. Reference AGA recommendation to members May 20, 2019 Evaluator Notes: The program promotes implementation of PSMS via operator meetings and as part of the Operator Annual Reviews (Refer to the UTC's OAR Checklist). 20 General Comments: Info Only = No Points Evaluator Notes: No issues identified. No point deductions. Info Only Info Only Total points scored for this section: 50 Total possible points for this section: 50 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 10\n\nPART E - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative (enter specifics into the comments box below) Info Only = No Points a. What type of inspection(s) did the state inspector conduct during the field portion of the state evaluation? (i.e. Standard, Construction, IMP, etc) b. When was the unit inspected last? c. Was pipeline operator or representative present during inspection? d. Effort should be made to observe newest state inspector with least experience Info Only Info Only Evaluator Notes: A UTC standard \"Annual Review\" of the Tidewater - Snake River Terminal facility. This operator was last inspected in 2020. Yes, the operator was present during this inspection. Scott Anderson has been with the UTC safety program since 2015. 2 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. The inspector utilized UTC Form \"A\" (Annual Review) for this inspection. 2 2 3 Did the inspector adequately review the following during the inspection 10 10 Yes = 10 No = 0 Needs Improvement = 1-9 a. Procedures (were the inspector's questions of the operator adequate to determine compliance?) b. Records (did the inspector adequately review trends and ask in-depth questions?) c. Field Activities/Facilities (did inspector ensure that procedures were being followed, including ensuring that properly calibrated equipment was used and OQ's were acceptable?) d. Other (please comment) e. Was the inspection of adequate length to properly perform the inspection? Evaluator Notes: Pre-inspection office review of the operator's written plans and PHMSA required data submitals conducted prior to engaging with the operator remotely via MS Teams. The \"Annual Review\" consists of a review of the operator's NPMS Submission/ Changes, Damage Prevention /Annual Report data, Incident/SRC/AOC reports submited, review of changes to O&M & Emergency Response programs, IM program changes and implementation activities, OQ plan changes and personnel quals, PAPEI updates, CRM plan updates, SMS API 1173 implementation (if any), Assessment of operator inspection units (when applicable), Operator's Public Web site content, Implementation of relevant PHMSA Advisory Bulletins. Duration of inspection was of adequate length to perform review. 4 From your observation did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Mr. Anderson demonstrated good working knowledge of the safety program and regulations. 2 2 5 Did the inspector conduct an exit interview, including identifying probable violations? (If inspection is not totally completed the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. No PV's or concerns identified. 1 1 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 11\n\n6 Was inspection performed in a safe, positive, and constructive manner ? Info Only = No Points a. No unsafe acts should be performed during inspection by the state inspector b. What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) c. Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) d. Other Evaluator Notes: Inspection performed remotely. No issues noted. Info Only Info Only 7 General Comments: Info Only = No Points Evaluator Notes: No issues. No point deductions under Part E. Info Only Info Only Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 12\n\nPART F - Damage prevention and Annual report analysis Points(MAX) Score 1 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues. Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes. As in the past the UTC performs a Operator Annual Review utilizing a customized checklist. Information taken from these reviews are incorporated into the programs risk-based inspection scheduling model. The program has begun a project to automate their Annual Review Checklist. The program also discuss detailed inspection/incident trends during their annual operator seminar. 2 Has the state verified that the operators analyze excavation damages for the purpose of 2 2 determining root causes and minimizing the possibility of a recurrence? (192.617) Has the state verified that the operators have appropriately identified excavators who have repeatedly violated one-call laws and damaged their facilities. Have the operators taken steps to mitigate that risks? (192.1007) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: This is covered in their Annual Review Checklist Damage Prevention Data section, with additional elements from Q1 and Q2. 3 Has the state reviewed the operator's annual report pertaining to Part D - Excavation Info Only Info Only Damage? Info Only = No Points a. Is the information complete and accurate with root cause numbers? b. Has the state evaluated the causes for the damages listed under \"One-Call Notification Practices Not Sufficient\" (Part D.1.a.)? c. Has the state evaluated the causes for the damages listed under \"Locating Practices Not Sufficient\" (Part D.1.b)? For each operator, does the state review the following? d. Is the operator or its locating contractor(s) qualified and following written procedures for locating and marking facilities? e. Is the operator appropriately requalifying locators to address performance deficiencies? f. What is the number of damages resulting from mismarks? g. What is the number of damages resulting from not locating within time requirements (no-shows)? h. Is the operator appropriately addressing discovered mapping errors resulting in excavation damages? i. Are mapping corrections timely and according to written procedures? j. Has the state evaluated the causes for the damages listed under \"Excavation Practices Not Sufficient\" (Part D.1.c.)? Evaluator Notes: Items a thru j covered in the program's Annual Review Checklist Damage Prevention Data section, with additional elements from Q1 and Q2. Also addressed during annual operator seminar. 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? Yes = 2 No = 0 Needs Improvement = 1 a. What stakeholder group is causing the highest number of damages to the pipelines? Operator, contractor, locating company or public. b. Has the state verified the operator is appropriately focusing damage prevention education and training to stakeholders causing the most damages? 2 2 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 13\n\nc. Has the state evaluated which of the following best describes the reason for the excavation damages; i.e., operator or contractor not following written procedures, failure to maintain marks, failure to support exposed facilities, failure to use hand tools were required, failure to test-hole (pot hole), improper backfilling practices, failure to maintain clearance or insufficient excavation practices. d. Has the state verified the operator is appropriately focusing damage prevention education and training to address the causes of excavation damages? Evaluator Notes: Yes. Mandatory reporting via the UTC's Virtual DIRT. Aggregated data is used to identify needs and trends. Results are posted on the UTC web site. This data and trending is also reflected on the Annual Review Checklist, and presented during their annual operator seminar. Outside of the annual review process, the program routinely works with operators when Annual Reports and DIRT reports are vague or do not demonstrate the level of detail they want from operators. Also present detailed trending at the annual operators meeting/seminar. 5 General Comments: Info Only = No Points Evaluator Notes: No issues. No point deductions. Info Only Info Only Total points scored for this section: 6 Total possible points for this section: 6 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 14\n\nPART G - Interstate Agent/Agreement States Points(MAX) Score 1 Were all inspections of interstate pipelines conducted using the Inspection Assistant program for documenting inspections? Info Only = No Points Evaluator Notes: Yes. IA was utilized to document inspection results. Info Only Info Only 2 If inspections were conducted independent of a PHMSA team inspection was notice of all Info Only Info Only identified probable violations provided to PHMSA within 60 days? Info Only = No Points Evaluator Notes: No independent inspection conducted. 3 If inspections were conducted independent of a PHMSA team inspection was PHMSA immediately notified of conditions which may pose an immediate safety hazard to the public or environment? Info Only = No Points Evaluator Notes: No independent inspection conducted. Info Only Info Only 4 If inspections were conducted independent of a PHMSA team inspection did the state coordinate with PHMSA if inspections not were not included in the PHMSA Inspection Work Plan? Info Only = No Points Evaluator Notes: No independent inspection conducted. Info Only Info Only 5 Did the state take direction from and cooperate with PHMSA for all incident investigations conducted on interstate pipelines? Info Only = No Points Evaluator Notes: Yes, when applicable. No HL incidents reported in CY2020. Info Only Info Only 6 General Comments: Info Only = No Points Evaluator Notes: No issues reported. Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 088967570 2020 Hazardous Liquid State Program Evaluation Washington Washington Utilities and Transportation Commission, Page: 15","truncated":false,"body_characters":31884}