# Department of Natural Resources, Office of Conservation — State Waiver

- **operation:** document
- **citation:** PHMSA-2022-0013
- **title:** Department of Natural Resources, Office of Conservation — State Waiver
- **source type:** permit
- **agency:** Department of Natural Resources, Office of Conservation
- **status:** historical
- **official:** true
- **published on:** 2022-02-24
- **effective on:** 2022-02-24
- **summary:** Louisiana state waiver granted 2022-02-24 for 49 CFR 195.8; 195.106; 195.112; 195.200; and 195.406(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-state-waiver-department-natural-resources-office-0.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-state-waiver-department-natural-resources-office-0.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-state-waiver-department-natural-resources-office-0
- **source url:** https://www.phmsa.dot.gov/standards-rulemaking/pipeline/special-permits-state-waivers/department-natural-resources-office-0
**body:**

PHMSA-2022-0013. State: Louisiana. Entity: Department of Natural Resources, Office of Conservation. Regulation: 49 CFR 195.8; 195.106; 195.112; 195.200; and 195.406(a). Date granted: 2022-02-24.

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
March 24, 2022
Mr. Michael Peikert
Pipeline Division Assistant Director
State of Louisiana
Department of Natural Resources, Office of Conservation
617 North 3rd Street, 9th Floor
Baton Rouge, Louisiana 70802
Re.: PHMSA-2022-0013 and Louisiana State Waiver PL Order No. 8405 (Amended)
Harvest Midstream Company – Waiver to March 3, 2032
Dear Mr. Peikert:
On March 8, 2022, pursuant to 49 United States Code (USC) § 60118(d), the Pipeline and
Hazardous Materials Safety Administration (PHMSA) received your letter that the
Commissioner of Conservation in the Louisiana Department of Natural Resources
(Commissioner) publicly noticed a state waiver, PL Order No. 8405-Amended (Waiver), on
December 16, 2021. The Waiver was requested by Harvest Midstream Company (Harvest) for
the installation and operation of approximately 4.2 miles of 6-inch diameter FlexSteel pipe
(Pipeline) and fittings to transport crude oil in St. Mary Parish, Louisiana. The Commissioner’s
notice indicated that the Waiver would be granted pending a 60-day review and no objection by
PHMSA.
The Pipeline crosses the Intracoastal Waterway and is routed between Harvest’s Atchafalaya 12-
inch diameter pipeline and their Burns Dock Facility. The Waiver is for usage of FlexSteel pipe
and fittings that are not covered under 49 Code of Federal Regulations (CFR) §§ 195.8; 195.106;
195.112; 195.200; and 195.406(a) for the materials, design, installation, and operation of
approximately 4.2 miles of 6-inch diameter FlexSteel pipe and fittings that will be inserted into
an existing 12-inch diameter pipeline with internal corrosion issues. The FlexSteel pipe will
have a pressure rating of 1,500 pounds per square inch gauge (psig) and the pipeline will operate
at a maximum operating pressure of 700 psig. The notice set forth numerous Waiver conditions
involving extensive design, testing, operational, and maintenance requirements.

<<<PAGE 2>>>

Pursuant to 49 USC § 60118(d), PHMSA does not object to this Waiver dated March 3, 2022,
and effective until March 3, 2032, on the condition that the Commissioner requires Harvest to
implement the specified Waiver conditions on the Pipeline located in St. Mary Parish, Louisiana.
If you wish to discuss this or any other pipeline safety matter, my staff would be pleased to assist
you. Please contact Sentho White, Director of Engineering and Research Division, at
202-366-2415, for technical matters.
Sincerely,
Alan K. Mayberry,
Associate Administrator for Pipeline Safety
PHMSA-2022-0013 – Louisiana PL Order No. 8405 - Amended Harvest Midstream Company – Waiver to use FlexSteel Pipe