# Missouri Public Service Commission — State Waiver

- **operation:** document
- **citation:** PHMSA-2020-1112
- **title:** Missouri Public Service Commission — State Waiver
- **source type:** permit
- **agency:** Missouri Public Service Commission
- **status:** historical
- **official:** true
- **published on:** 2020-09-18
- **effective on:** 2020-09-18
- **summary:** Missouri state waiver granted 2020-09-18 for 49 CFR 192.740.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-state-waiver-missouri-public-service-commission-09182020.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-state-waiver-missouri-public-service-commission-09182020.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-state-waiver-missouri-public-service-commission-09182020
- **source url:** https://www.phmsa.dot.gov/pipeline/special-permits-state-waivers/missouri-public-service-commission-09182020
**body:**

PHMSA-2020-1112. State: Missouri. Entity: Missouri Public Service Commission. Regulation: 49 CFR 192.740. Date granted: 2020-09-18.

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
September 18, 2020
Mr. Morris L. Woodruff
Secretary, Chief Regulatory Law Judge
Missouri Public Service Commission
200 Madison Street, Suite 900
Jefferson City, Missouri 65101
Re: Docket No. PHMSA-2020-0112
State of Missouri – Public Service Commission, File No. GE-2020-0295
Dear Mr. Woodruff:
On September 2, 2020, pursuant to 49 United States Code (USC) § 60118(d), the Pipeline and
Hazardous Materials Safety Administration (PHMSA) received a letter from the Missouri Public
Service Commission (Commission) notifying PHMSA that the Commission granted a waiver of
49 Code of Federal Regulations § 192.740 to Spire Missouri, Inc. (Company). This waiver will
allow the Company to include their farm tap inspection program into the Company Distribution
Integrity Management Program (DIMP).
The Commission issued the waiver to the Company to continuously monitor farm taps for
heightened levels of risk under DIMP, to implement applicable pipeline regulations regarding
farm taps, and to provide quarterly and annual reports on leaks and other pressure regulating or
pressure limiting device failures of farm tap facilities to the Commission Staff. The waiver
applies to the Company’s Spire Missouri East and Spire Missouri West pipeline operating units.
Pursuant to 49 USC § 60118(d), PHMSA does not object to issuance of this waiver by the
Commission for the Spire Missouri East and Spire Missouri West pipeline facilities provided
the Company complies with the conditions set forth in the waiver. PHMSA requests that a
copy of the Commission’s final waiver to the Company be forwarded to PHMSA within 30 days
of issuance.
If you wish to discuss this or any other pipeline safety matter, my staff would be pleased to assist

<<<PAGE 2>>>

you. Please contact Sentho White, Director of Engineering and Research Division, at 202-366-
2415, for technical matters.
Sincerely,
ALAN
Digitally signed by
ALAN KRAMER
KRAMER
MAYBERRY
Date: 2020.09.18
MAYBERRY
15:03:40 -04'00'
Alan K. Mayberry,
Associate Administrator for Pipeline Safety
PHMSA-2020-0112 – State of Missouri – File No. GE-2020-0295 Page 2 of 2
- **truncated:** false
- **body characters:** 2386
