# Public Service Commission of Wisconsin — State Waiver

- **operation:** document
- **citation:** PHMSA-2023-0063
- **title:** Public Service Commission of Wisconsin — State Waiver
- **source type:** permit
- **agency:** Public Service Commission of Wisconsin
- **status:** historical
- **official:** true
- **published on:** 2023-07-28
- **effective on:** 2023-07-28
- **summary:** Wisconsin state waiver granted 2023-07-28 for 49 CFR §§ 192.59(a)(1) and 192.63(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-state-waiver-public-service-commission-wisconsin-07282023.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-state-waiver-public-service-commission-wisconsin-07282023.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-state-waiver-public-service-commission-wisconsin-07282023
- **source url:** https://www.phmsa.dot.gov/standards-rulemaking/pipeline/special-permits-state-waivers/public-service-commission-wisconsin-07282023
**body:**

PHMSA-2023-0063. State: Wisconsin. Entity: Public Service Commission of Wisconsin. Regulation: 49 CFR §§ 192.59(a)(1) and 192.63(a). Date granted: 2023-07-28.

<<<PAGE 1>>>

1200 New Jersey Avenue, SE
Washington, DC 20590
U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
July 28, 2023
Mr. Alex J. Kirschling
Pipeline Safety Program Manager
Division of Energy Regulation and Analysis
Public Service Commission of Wisconsin
4822 Madison Yards Way
P.O. Box 7854
Madison, Wisconsin 53707-7854
Re: Docket No. PHMSA-2023-0063
Public Service Commission of Wisconsin – Docket – 9250-PL-2023
Dear Mr. Kirschling:
On July 5, 2023, pursuant to 49 United States Code (USC) § 60118(d), the Public Service
Commission of Wisconsin (Commission) notified the Pipeline and Hazardous Materials Safety
Administration (PHMSA) that it granted a waiver to Republic Services of Wisconsin, LP
(Republic). The Commission issued the waiver (Docket – 9250-PL-2023) to Republic on July 3,
2023, for the 0.6-mile-long Kestrel Hawk pipeline, which is an 8-inch HDPE pipeline that carries
landfill biogas in Racine County, Wisconsin.
The waiver allows Republic to continue to operate the Kestrel Hawk pipeline although the high-
density polyethylene (HDPE) was not tested to meet the requirements of a listed ASTM
International (formerly known as the American Society for Testing and Materials) (ASTM)
specification incorporated by reference in 49 Code of Federal regulations (CFR) § 192. The
applicant requested a waiver of 49 CFR §§ 192.59(a)(1) and 192.63(a) to continue using the
8-inch HDPE pipe.
Pursuant to 49 USC § 60118(d), PHMSA does not object to issuance of this waiver by the
Commission to Republic.
If you wish to discuss this or any other pipeline safety matter, please contact Mary L. McDaniel,
Acting Director of Engineering and Research Division, at 713-272-2847.
Sincerely,
Alan K. Mayberry,
Associate Administrator for Pipeline Safety
- **truncated:** false
- **body characters:** 1962
