{"operation":"document","citation":"0900006480e90e58","title":"U.S. DOT/PHMSA - Letter of Acknowledgment","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"u.s. Department of Transportation Pipeline and Hazardous Materials Safety Administration May 5, 2010 1200 New Jersey Ave., SE Washington, DC 20590 Mr. David Goodwin Vice President, Boardwalk Pipeline Partners 9 Greenway Plaza, Suite 2800 Houston, TX 77042 Docket No. PHMSA-2010-0124 Dear Mr. Goodwin: The Pipeline and Hazardous Materials Safety Administration (PHMSA) has received your March 17,2010, letter requesting special permit waiving compliance from certain Federal pipeline safety regulations in 49 CFR Part 192. Specifically, your requested waiver of 49 CFR 192.611, \"Change in Class Location: Confirmation or Revision of Maximum Allowable Operating Pressure\" for a segment of Gulf South Pipeline Line TPL-880...","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e90e58.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e90e58.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e90e58","source_url":"https://downloads.regulations.gov/PHMSA-2010-0124-0003/attachment_1.pdf","body":"<<<PAGE 1>>>\n\nu.s. Department\nof Transportation\nPipeline and Hazardous Materials\nSafety Administration\nMay 5, 2010\n1200 New Jersey Ave., SE\nWashington, DC 20590\nMr. David Goodwin\nVice President, Boardwalk Pipeline Partners\n9 Greenway Plaza, Suite 2800\nHouston, TX 77042\nDocket No. PHMSA-2010-0124\nDear Mr. Goodwin:\nThe Pipeline and Hazardous Materials Safety Administration (PHMSA) has received your\nMarch 17,2010, letter requesting special permit waiving compliance from certain Federal\npipeline safety regulations in 49 CFR Part 192. Specifically, your requested waiver of 49 CFR\n192.611, \"Change in Class Location: Confirmation or Revision of Maximum Allowable\nOperating Pressure\" for a segment of Gulf South Pipeline Line TPL-880 in Mobile County of\nAlabama.\nPHMSA has assigned docket ill PHMSA-2010-0124 to your request in the Federal Docket\nManagement System (FDMS) located on the Internet at www.Regulations.gov. We will post\nyour request, supplemental information, Federal Register notices, public comments and other\ndocuments related to this request in this docket. All documents placed into the docket are\navailable for public viewing. PHMSA will contact you if additional information is required for\ncontinued processing of your special permit request.\nIf I can further assist you with this, or any other pipeline safety matter, please contact me at\n202-366-0490.\nSincerely,\nq;; ~;t. Ii<;r=--t::\nDana L. Register\nTransportation Program Specialist\nPHMSA, Office of Regulations","truncated":false,"body_characters":1486}