# U.S. DOT/PHMSA - Special Permit Analysis and Findings

- **operation:** document
- **citation:** 0900006480e91a41
- **title:** U.S. DOT/PHMSA - Special Permit Analysis and Findings
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** u.s. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION Special Permit Analysis and Findings Special Permit Information: Docket Number: Pipeline Operator: Date Requested: Code Section(s): PHMSA-2009-0056 TransCanada Pipelines Limited, operator of American Natural Resources Pipeline (TCPL-ANR) February 6, 2009 49 CFR § 192.611 Purpose: The... requirement for wall loss, but would need to run in line inspection tools both high resolution MFL and geometry tools to detect corrosion and to detect dents. 7) TCPL-ANR has met this requirement for wall loss, but would need to run an ILl tool to detect dents and re-run ILl for anomalies and corrosion. 8) Criteria for...
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a41.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a41.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a41
- **source url:** https://downloads.regulations.gov/PHMSA-2009-0056-0009/attachment_1.pdf
**body:**

<<<PAGE 1>>>

u.s. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
Special Permit Analysis and Findings
Special Permit Information:
Docket Number:
Pipeline Operator:
Date Requested:
Code Section(s):
PHMSA-2009-0056
TransCanada Pipelines Limited, operator of American Natural
Resources Pipeline (TCPL-ANR)
February 6, 2009
49 CFR § 192.611
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this
information to describe the facts ofthe subject special permit application submitted by
TransCanada Pipelines Limited, operator of American Natural Resourcesl (TCPL-ANR), to
discuss any relevant public comments received with respect to the application, to present the
engineering/safety analysis of the special permit application, and to make findings regarding
whether the requested special permit should be granted and if so under what conditions.
Pipeline System Affected:
This special permit application applies to one (1) special permit segment along the TCPL-ANR
system of natural gas pipelines. This special permit segment is on the 30-inch Line 1-501
pipeline located in Tate County, Mississippi. The class location along the pipeline special permit
segment has changed from an original Class 1 Location to a Class 32 Location.
This special permit application applies to the special permit segment and special permit
inspection area defined using the TCPL-ANR valve stationing references as follows:
1 American Natural Resources is owned and operated by TransCanada Pipelines Limited~
2 This Class 3 special permit segment was originally a Class 1 location that was upgraded to Class 2 location in
accordance with § 192.611 (a) hydrostatic test.

<<<PAGE 2>>>

• Special permit segment - Line 1-501,872 feet, from Valve 27 Station 927 +05 to Valve 27
Station 935+77.
• Special permit inspection area means the area that extends 220 yards perpendicular on each
side of the centerline of the Line 1-501, 30-inch, pipeline from the discharge of the Sardis
Compressor Station at Valve 27 Station 0+00 (approximately 17.6 miles upstream of the
special permit segment) to the Brownsville Compressor Station at Valve 29 Station 297+05
(approximately 25 miles downstream of the special permit segment). The special permit
inspection area is approximately 42.77 miles long and 440 yards wide and includes the
special permit segment.
Special Permit Request
TCPL-ANR submitted an application to PHMSA on February 6, 2009, for a special permit
seeking relief from the Federal pipeline safety regulations in 49 CFR § 192.611(a) for one (1)
segment of TCPL-ANR natural gas transmission 30-inch Line 1-501 pipeline where a change has
occurred from an original Class 1 location to a Class 3 location in Tate County, Mississippi.
This special permit request is to allow TCPL-ANR to continue to operate the pipeline special
permit segment at its current maximum allowable operating pressure (MAOP) of 858 pounds per
square inch gauge (psig). The Federal pipeline safety regulations in 49 CFR § 192.611 (a)
require natural gas pipeline operators to confirm or revise the MAOP of a pipeline segment after
a change in class location.
Public Notice:
On April 28, 2009, PHMSA posted a notice of this special permit request in the Federal Register
(74 FR 19264). PHMSA did not receive any comments for or against this special permit request
as a result of this notice. The request letter, Federal Register notice, and all other pertinent
documents are available for review in Docket No. PHMSA-2009-0056 in the Federal Docket
Management System (FDMS) located on the internet at www.Regulations.gov.
Analysis:
Background: On June 29,2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of class location change waivers, now referred to as a special

<<<PAGE 3>>>

permit. Certain threshold requirements must be met for a pipeline section to be further evaluated
for a class location change special permit. The age and manufacturing process of the pipe;
system design and construction; environmental, operating and maintenance histories; and
integrity management program elements are evaluated as significant criteria. These significant
criteria are presented in matrix form and can be reviewed in the FDMS, Docket Number
PHMSA-RSPA-2004-17401. Special permits will only then be granted when pipe conditions
and active integrity management provides a level of safety greater than or equal to a pipe
replacement or pressure reduction.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the
June 29, 2004, FR notice is discussed below in regards to the TCPL-ANR special permit petition.
1) No pipeline segments in a class location changing to Class 4 Location will be considered.
This special permit request is for the PHMSA 2009-0056 segment of TCPL-ANR pipeline
where a class location change has occurred from a Class 1 location to a Class 3 location.
2) No bare pipe will be considered. These TCPL-ANR special permit segment is coated with
Allied cold tar enamel, primer, and felt wrap. TCPL-ANR has met this requirement.
3) No pipe containing wrinkle bends will be considered. There are no wrinkle bends in the
special permit segments. TCPL-ANR has met this requirement.
4) No pipe segments operating above 72% of the specified minimum yield strength (SMYS)
will be considered for a Class 3 special permit. The special permit segment operates at or
below 72% SMYS. TCPL-ANR has met this requirement.
5) Records must be produced that show a hydrostatic test to at least 1.25 x maximum allowable
operating pressure (MAOP) and 90% of SMYS. TCPL-ANR records submitted show that
the sections ofthe 30-inch Line 1-501 pipeline has been hydrostatically tested to 1,150 psig
which is 1.34 x MAOP and 96.5% of SMYS. TCPL-ANR has met this requirement. TCPL-
ANR has mechanical and chemical properties test reports for the pipe to verify the pipe
specifications, but these reports indicate the pipe has low toughness properties.
6) In-line inspection (Ill) must have been performed with no significant anomalies identified
that indicate systemic problems. The proposed special permit segment was last inspected by
III in 2003, with no immediately actionable anomalies found. TCPL-ANR has met this

<<<PAGE 4>>>

requirement for wall loss, but would need to run in line inspection tools both high resolution
MFL and geometry tools to detect corrosion and to detect dents.
7) TCPL-ANR has met this requirement for wall loss, but would need to run an ILl tool to
detect dents and re-run ILl for anomalies and corrosion.
8) Criteria for consideration of class location change waiver, now referred to as a special permit,
published by PHMSA in the Federal Register (69 FR 38948), define a waiver inspection
area (special permit inspection area) as up to 25 miles of pipe either side of the waiver
segment (special permit segment). The special permit inspection area must be inspected
according to operator's integrity management program and periodically inspected with an in-
line inspection technique. The special permit inspection area is approximately 42.77 miles
in contiguous length. This special permit, if issued, would be contingent upon the operator's
incorporation of each of the special permit segments in its written integrity management
program as a "covered segment" in a "high consequence area" (HCA) per 49
CFR § 192.903.
Criteria Matrix: The original and supplemental data submitted by TCPL-ANR for the special
permit segments have been compared to the class location change special permit criteria matrix.
The data fall within the probable acceptance column of the criteria matrix except for:
a. Possible acceptable justification - pipe coating, depth of cover, hydrostatic test
rupture, ILl, and cathodic protection.
b. Requires substantial justification - pipe manufacture and girth weld inspections
The data findings below fall within the "possible acceptance" or the "requires substantial
justification" column of the criteria matrix:
1) Possible Acceptable Justification - Pipe coating, leaks & failures, depth of cover and ILl
inspections: The 30-inch pipe is coated with coal tar enamel coating. TCPL-ANR would be
required to remediate this coating in the special permit segment by Direct Current Voltage
Gradient (DCVG) surveyor an Alternating Current Voltage Gradient (ACVG) survey and
close interval surveys (CIS) and remediate poor quality coating. The pipeline did have a
hydrostatic test failure in 1966, but has no leaks or failures since that time. Depth of cover
was not confirmed by TCPL-ANR, so a survey and remediation of shallow areas would need

<<<PAGE 5>>>

to be required if a special permit was issued. To confirm cathodic protection a CIS survey
would be required in the special permit inspection area.
2) Requires substantial justification - pipe manufacture and girth weld inspections: TCPL-ANR
indicates 30-inch Line 1-501 pipeline was installed in 1966 and consists of American
Petroleum Institute Specification 5LX, Specification/or Line Pipe (API 5LX), double
submerges arc welded (DSAW), X-60 steel pipe manufactured by Kaiser Steel. TCPL-ANR
states it has mill test reports to verify the strength and chemistry of the pipe, but the pipe steel
toughness is low for fracture arrest. TCPL-ANR has tested this pipeline to 96.5% SMYS test
levels, 1150 psig, and 134% ofMAOP. TCPL-ANR reports no in service leaks or failure on
this 30-inch pipeline in the special permit inspection area. This would place all special
permit segments in the "requires substantial justification" column of the criteria matrix.
TCPL-ANR would be required by the special permit conditions to hydrostatically test the 30-
inch pipe in the special permit segment to 100% SMYS and to cut pipe samples to verify the
pipe strength properties. TCPL-ANR does not have records to show that pipeline girth welds
were non-destructively tested during construction. TCPL-ANR would be required to conduct
tests to verify girth weld quality in the special permit conditions, if a special permit was
issued.
To further address the pipe manufacture and girth weld quality, an operator of pipe such as
the pipe involved in this application would have to treat all special permit segments as
"covered segments" in an HCA per 49 CFR § 192.903. ILl assessments, anomaly repairs,
CIS, and stress corrosion cracking direct assessment (SCCDA) of 30-inch Line 1-501
pipeline would be required to be performed along the entire length of the special permit
inspection area and special permit segments according to the requirements of 49 CFR
§ 192.929 within one year after the grant of a special permit and on a 7 year reassessment
interval. A special permit would need to include a condition that each special permit
segment be operated at or below its existing MAOP. TCPL-ANR would be required by a
special permit to evaluate girth weld quality and pipe strength.

<<<PAGE 6>>>

PHMSA has determined that issuing a special permit with conditions would not provide
equivalent safety for this area where an original Class 1 location is being upgraded to a Class 3
location. TCPL-ANR did not furnish documentation that shows the pipe steel toughness
properties are high enough to mitigate fracture propagation and arrest cracks in the steel pipeline.
Low toughness pipe can potentially increase the consequences of a pipeline failure in a Class 3
location. Class location upgrades that are considered by PHMSA for special permits in
populated areas must meet pipe toughness standards, so that integrity evaluations for special
permit conditions are technically sound.
Findings:
PHMSA has determined that a special permit, even with conditions, that would allow TCPL-
ANR to leave the existing subject pipeline segment in service at its current MAOP will not
ensure equivalent safety in this populated Class 3 location and would not be consistent with
pipeline safety. Accordingly, we recommend that the special permit request be denied.
tJUL 1 62010
Completed in Washington DC on: ____________ _
Prepared By: PHMSA - Engineering and Emergency Support