# U.S. DOT/PHMSA - Decision

- **operation:** document
- **citation:** 0900006480e91a43
- **title:** U.S. DOT/PHMSA - Decision
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** The document records that TransCanada Pipeline Limited (operator of American Natural Resources Pipeline) requested a special permit on February 6, 2009 to waive compliance with 49 CFR § 192.611 for one segment of its natural gas transmission pipeline in Tate County, Mississippi. PHMSA denied the special permit, stating the application provided insufficient information demonstrating the adequacy of the pipe steel toughness properties to mitigate fracture propagation. PHMSA directs TCPL-ANR to comply with 49 CFR § 192.611 by September 30, 2011, and notes that the denial’s full reasons are described in an enclosed Special Permit Analysis and Findings document available in Docket No. PHMSA-2009-0056. Contact names and phone numbers for regulatory and technical matters are provided. The summary is limited to the content of the supplied passage and does not infer agency rationale or legalize;s
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a43.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a43.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e91a43
- **source url:** https://downloads.regulations.gov/PHMSA-2009-0056-0008/attachment_1.pdf
**body:**

<<<PAGE 1>>>

u.s. Department
of Transportation
Pipeline and Hazardous Materials
Safety Administration
1200 New Jersey Ave., SE
Washington, DC 20590
'JUL 1 620lD
Mr. David Chittick
Director, Pipeline Engineering
TransCanada Pipelines Limited
450 - 1st Street, S.W.
Calgary, Alberta, Canada T2P 5Hl
Docket No. PHMSA-2009-0056
Dear Mr. Chittick:
On February 6, 2009, TransCanada Pipeline Limited operator of American Natural Resources
Pipeline (TCPL-ANR) wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) requesting a special permit to waive compliance from PHMSA's pipeline safety
regulation in 49 CFR § 192.611 for one (1) segment of the TCPL-ANR natural gas transmission
pipeline system located in Tate County, Mississippi. The regulation requires confirmation or
revision of the maximum allowable operating pressure (MAOP) ofa pipeline segment where the
class location has changed.
PHMSA is denying this special permit due to insufficient information in the application
demonstrating the adequacy of the pipe steel toughness properties to mitigate fracture
propagation. The reasons for this denial are more fully described in the special permit analysis
and findings document enclosed with this letter. This document and all other pertinent
documents are available for review in Docket No. PHMSA-2009-0056 in the Federal Docket
Management System (FDMS) located on the internet at www.Regulations.gov.
TCPL-ANR should comply with the requirements of 49 CFR § 192.611 by September 30, 2011.
My staff would be pleased to discuss this special permit or any other regulatory matter with you.
John Gale, Director of Regulations (202-366-4046), may be contacted on regulatory matters and
Alan Mayberry, Deputy Associate Administrator for Pipeline Safety (202-366-5124), may be
contacted on technical matters specific to this special permit
Sincerely,
~~
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Enclosure: Special Permit Analysis and Findings
- **truncated:** false
- **body characters:** 1983