# U.S. DOT/PHMAS - Decision Letter

- **operation:** document
- **citation:** 0900006480e9273b
- **title:** U.S. DOT/PHMAS - Decision Letter
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** PHMSA issued a special permit in response to Kinder Morgan/MEP's April 4, 2007 waiver request for relief from 49 CFR §§ 192.111 and 192.201 for an approximately 500-mile interstate natural gas transmission pipeline running from Bryan County, Oklahoma through Texas, Louisiana and Mississippi to Choctaw County, Alabama. The special permit permits MEP to design, construct and operate Class 1 location segments at a design factor up to 0.80 and stress levels up to 80% of SMYS (resulting in an MAOP of 1,480 psig). It also allows pressure relief and limiting devices sized so pressure in Class 1 segments would not exceed 104% of MAOP (or the pressure producing hoop stress of 83.2% SMYS) during overpressure events. The decision notes the October 13, 2008 PHMSA final rule on increasing MAOP was published and that the special permit was issued based on analysis in a Special Permit Analysis and is (
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e9273b.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e9273b.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480e9273b
- **source url:** https://downloads.regulations.gov/PHMSA-2007-27842-0007/attachment_1.pdf
**body:**

<<<PAGE 1>>>

of Transportation
U.S. Department
1200 New Jersey Avenue, SE
Materials Safety
Pipeline and Hazardous
DEC 5 2008
Washington, D.C. 20590
Administration
Mr. M. Dwayne Burton
Vice President, Gas Pipeline Operations and Engineering
Kinder Morgan, Inc.
One Allen Center
500 Dallas Street, Suite 1000
Houston, TX 77002
Docket No. PHMSA-2007-27842
Dear Mr. Burton:
On April 4, 2007, you wrote to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) requesting a waiver of compliance from the Federal pipeline safety regulations in
49 CFR §§ 192.111 and 192.201 for approximately 500-miles of proposed interstate natural gas
transmission pipeline. This pipeline will be operated by Midcontinent Express Pipeline, LLC
(MEP), a jointly owned subsidiary of Kinder Morgan Energy Partners, L.P., and Energy
Transfer Partners L.P. The new pipeline will originate in Bryan County, Oklahoma, and run
southeasterly through Texas, Louisiana and Mississippi to existing facilities in Choctaw County,
Alabama.
On October 13, 2008, PHMSA published the final rule, Standards for Increasing the Maximum
Allowable Operating Pressure for Gas Transmission Pipelines, which becomes effective 30 days
after publication. The rule covers the requirements for any pipeline to operate at a design factor
of up to 0.80 in Class 1 areas. PHMSA is proceeding with issuing the Midcontinent Express
Pipeline special permit as a result of the thorough analysis contained in the Special Permit
Analysis and Findings document, prepared well in advance of the final rule. Moreover, since
the Midcontinent Express pipeline varies from certain provisions of the final rule, this special
permit is necessary to cover all requested variances from regulations and required conditions,
and is consistent with, or more stringent than, prior grants of special permit for existing
pipelines.
PHMSA is granting this waiver through the enclosed special permit, which allows MEP to
design, construct and operate the MEP pipeline in Class 1 locations, using a design factor in
§ 192.111 up to 0.80 and at stress levels up to 80% of the specified minimum yield strength
(SMYS). This would result in a maximum allowable operating pressure (MAOP) of 1,480 psig.
This special permit also allows MEP to design, install and operate pressure relief and limiting
devices on the MEP pipeline, with a capacity that would ensure the pressure in Class 1 location
pipeline segments would not exceed 104% of the MAOP, or the pressure that produces a hoop
stress of 83.2% SMYS in the event an overpressure situation develops. This special permit has
conditions and limitations and provides some relief from the Federal pipeline safety regulations
for the MEP pipeline, while ensuring that pipeline safety is not compromised.

<<<PAGE 2>>>

Page 2
Mr. M. Dwayne Burton
Docket No. PHMSA-2007-27842
My staff would be pleased to discuss this special permit or any other regulatory matter with
you. John Gale, Director of Regulations, (202-366-0434), may be contacted on regulator
natters and Alan Mayberry, Director of Engineering and Emergency Support (202-366-5124)
may be contacted on matters specific to this special permit.
Sincerely,
Direse
Jeffrey D. Wiese
Associate Administrator for Pipeline Safety
Enclosure: Special Permit