# U.S. DOT/PHMSA - Special Permit Analysis and Findings

- **operation:** document
- **citation:** 0900006480eb58c3
- **title:** U.S. DOT/PHMSA - Special Permit Analysis and Findings
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** Not available
- **summary:** Document conclusions, scope and key conditions summarized from the application and PHMSA analysis: - Conclusion: "PHMSA finds that granting this special permit to TCPL is inconsistent with pipeline safety." (passage id: regulations-gov-attachment-0900006480eb58c3-node-9) - Purpose and request: PHMSA prepared this analysis to "describe the facts of the subject special permit application... to discuss any relevant public comments... to present the engineering/safety analysis... and to make findings regarding whether the requested special permit should be granted and if so under what conditions." The applicant (TransCanada Pipelines Limited, operator of ANR Pipeline Company) requested relief from 49 CFR § 192.611(a) to "allow TCPL to continue to operate the one (1) pipeline segment at its current maximum allowable operating pressure (MAOP) of 1050 pounds per square inch gauge (psi g)" after
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480eb58c3.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480eb58c3.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-attachment-0900006480eb58c3
- **source url:** https://downloads.regulations.gov/PHMSA-2010-0192-0007/attachment_1.pdf
**body:**

<<<PAGE 1>>>

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA)
Special Permit Analysis and Findings
Special Permit Information:
Docket Number: PHMSA-20 1 0-0 192
Pipeline Operator: TransCanada Pipelines Limited, operator of ANR Pipeline Companyl
Date Requested: June 24,2010
Code Section(s): 49 CFR § 192.611(a)
Purpose:
The Pipeline and Hazardous Materials Safety Administration (PHMSA) provides this
information to describe the facts of the subject special permit application submitted by
TransCanada Pipelines Limited (TCPL), operator of the ANR Pipeline Company (ANR), to
discuss any relevant public comments received with respect to the application, to present the
engineering/safety analysis of the special permit application, and to make findings regarding
whether the requested special permit should be granted and if so under what conditions.
Pipeline System Affected:
This special permit request involves one (1) special permit segment along the 30-inch ANR
Lateral Loop 2-716 pipeline natural gas transmission pipeline in St. Martin Parish, Louisiana.
The special permit segment class location along the pipeline has changed from an original Class
1 location to a Class 32 location.
This special permit, if granted, will allow TCPL to continue to operate the one (1) pipeline
segment at its current maximum allowable operating pressure (MAOP) of 1050 pounds per
square inch gauge (psi g) for the 30-inch ANR Lateral Loop 2-716 pipeline.
I ANR Pipeline Company is owned and operated by TransCanada Pipelines Limited.
2 The Class 3 location special permit segment was originally a Class 1 location that was upgraded to Class 2 location
in accordance with 49 CFR § 192.611 (a) hydrostatic test.
1

<<<PAGE 2>>>

This special permit application applies to the special permit segment defined as follows using the
ANR Lateral Loop 2-716 pipeline mile post and valve section survey station references:
• Special permit segment is defined as the 30-inch ANR Lateral Loop 2-716 pipeline
beginning at Mile Post 54.02 (V4 584+66 feet) between Valve Site 3 and Valve Site 4.
The special permit segment extends for 3,149 feet along 30-inch ANR Lateral Loop 2-
176 and concludes at Mile Post 54.61 (V4 616+15), also between Valve Site 3 and Valve
Site 4. The special permit segment is located in St. Martin Parish, Louisiana. (Note: The
above ground Mile Posts do not correlate exactly with the below ground pipe lengths.)
This special permit application applies to the special permit inspection area defined as the area
that extends 220 yards on each side ofthe centerline along the entire length of the 30-inch ANR
Lateral Loop 1-716 and 2-716 pipelines as follows:
• Special permit inspection area is defined as the pipeline that begins at Mile Post 29.02 at
Valve Site 2 (V3 427+75 feet) on Loop 1-716 in Iberia Parish, Louisiana. The special
permit inspection area extends through Valve Site 3 to Mile Post 43.03 where the ANR
pipeline lateral naming convention changes from Loop 1-716 to Loop 2-716 in st. Martin
Parish, Louisiana. The special permit inspection area continues along Loop 2-176 to
Valve Site 4 at Mile Post 55.52 where the ANR pipeline lateral naming convention
reverts back to Loop 1-176, also in St. Martin Parish, Louisiana. The special permit
inspection area continues along Loop 1-176 and concludes at Valve Site 5 at Mile Post
70.78 (V5 00+00 feet) in St. Landry Parish, Louisiana.
The total length of the proposed special permit inspection area is approximately 41.76 miles and
includes the special permit segment.
Special Permit Request
TCPL submitted an application to PHMSA on June 24,2010, for a special permit seeking relief
from the Federal pipeline safety regulations in 49 CFR 192.611(a) for one (1) segment of
TCPL's 30-inch ANR Lateral Loop 2-716 natural gas transmission pipeline, where a change has
occurred from a original Class 1 location to a Class 3 location in St. Martin Parish, Louisiana.
2

<<<PAGE 3>>>

As requested, this proposed special permit would allow TCPL to continue to operate the pipeline
segment at its current maximum allowable operating pressure (MAOP) of 1050 pounds per
square inch gauge (psig). The Federal pipeline safety regulations in 49 CFR 192.611 (a) require
natural gas pipeline operators to confIrm or revise the MAOP of a pipeline segment after a
change in class location. A special permit, if granted, will allow TCPL to continue to operate the
special permit segment at its existing MAOP's despite a change in class location.
In its application, TCPL suggested that the special permit segment be included in a special
permit inspection area (see TCPL's application for the specifIc details). The special permit
inspection area on the 30-inch ANR Lateral Loops 1-716 and 2-716 pipeline will begin
approximately 25 miles upstream of the beginning of the special permit segment and
approximately 16.17 miles downstream of the special permit segment. The special permit
inspection area would be approximately 41.76 miles in length and will include the special permit
segment.
Public Notice:
On March 3,2011, PHMSA posted a notice of this special permit request in the Federal Register
(76 FR 11853). The request letter, Federal Register notice, and all other pertinent documents are
available for review in Docket No. PHMSA-2010-0192 in the Federal Docket Management
System (FDMS) located on the internet at www.Regulations.gov.
PHMSA received no public comments on this application for a class location special permit.
Analysis:
Background: On June 29,2004, PHMSA published in the Federal Register (69 FR 38948) the
criteria it uses for the consideration of class location change waivers, now being granted through
a special permit. First, certain threshold requirements must be met for a pipeline section to be
further evaluated for a class location change special permit. Second, the age and manufacturing
process of the pipe; system design and construction; environmental, operating and maintenance
histories; and integrity management program elements are evaluated as signifIcant criteria.
These signifIcant criteria are presented in matrix form and can be reviewed in the FDMS, Docket
3

<<<PAGE 4>>>

Number PHMSA-RSPA-2004-17401. Third, such special permits will only then be granted
when pipe conditions and active integrity management provides a level of safety greater than or
equal to a pipe replacement or pressure reduction.
Threshold Requirements: Each of the threshold requirements published by PHMSA in the
June 29,2004, FR notice is discussed below in regards to the TCPL special permit petition.
1) No pipeline segments in a class location changing to Class 4 location will be considered.
This special permit request is for one (1) segment of ANR's 30-inch Lateral Loop 2-716
2) pipeline where a class location change has occurred from Class 1 to Class 3 location.
No bare pipe will be considered. This TCPL special permit segment is coated with coal tar
enamel coating. TCPL has met this requirement.
3) No pipe containing wrinkle bends will be considered. There are no wrinkle bends in the
special permit segment. TCPL has met this requirement.
4) No pipe segments operating above 72% of the specified minimum yield strength (SMYS)
will be considered for a Class 3 special permit. The special permit segment operates at or
below 72% SMYS. TCPL has met this requirement.
5) Records must be produced that show a hydrostatic test to at least 1.25 x maximum allowable
operating pressure (MAOP) and 90% of SMYS. TCPL records submitted show that the
section of the ANR's 30-inch Lateral Loop 2-716 pipeline containing the special permit
segment has been hydrostatically tested to 1450 psig, which is 1.38 xMAOP and 99% of
SMYS. TCPL has met this requirement.
6) In-line inspection (ILl) must have been performed with no significant anomalies identified
that indicate systemic problems. The proposed special permit segment was last inspected by
ILl in 2009, with no immediately actionable anomalies found. TCPL has met this
requirement.
7) Criteria for consideration of class location change waiver, now being granted through special
permit, published by PHMSA in the Federal Register (69 FR 38948), define a waiver
inspection area (special permit inspection area) as up to 25 miles of pipe either side of the
waiver segment (special permit segment). The special permit inspection area must be
inspected according to TCPL's integrity management program and periodically inspected
with an in-line inspection technique. The special permit inspection area is approximately
4

<<<PAGE 5>>>

41.76 miles long, which is the entire length of the 30-inch ANR Lateral Loops 1-716 and 2-
716 pipeline. This special permit is contingent upon TCPL's incorporation of the special
permit segment in its written integrity management program as a "covered segment" in a
"high consequence area" (HCA) per 49 CFR § 192.903.
The special permit segment meets the threshold requirements.
Criteria Matrix: The original and supplemental data submitted by TCPL for the special permit
segment have been compared to the class location change special permit criteria matrix. The
special permit segment falls in the probable acceptance column of the criteria matrix for all
criteria except for:
• Possible acceptance - pipe manufacture, pipe coating, and depth of cover.
• Requires substantial justification - none.
The data findings above fall within the "possible acceptance" columns of the criteria matrix and
would require some remediation measures as described below:
1) Pipe manufacture: ANR's 30-inch Lateral Loop 2-716 pipeline was installed in 1972, and
2) 3) consists of American Petroleum Institute Specification 5LX, Specification/or Line Pipe (API
5LX), doubled submerged arc welded (DSA W), X-52 steel pipe manufactured by US Steel
Corporation. This pipe is of sufficient toughness - 53 foot-pounds. The ANR Lateral Loop
1-716 and 2-716 pipeline in the special permit inspection area has had no leaks or ruptures.
This pipe meets requirements for a special permit with no conditions for manufacture.
Pipe coating: The pipe is coated with coal tar enamel- Koppers 70-B primer and hi-melt
enamel. If the special permit is granted, TCPL will be required to perform ILl assessments,
anomaly repairs, close interval surveys, and stress corrosion cracking direct assessment
(SCCDA) along the entire length of the ANR Lateral Loops 1-716 and 2-716 pipeline
special permit inspection area and special permit segment according to the requirements of
49 CFR § 192.929 within one (1) year after the grant of this special permit
Depth of cover: TCPL has not conducted a pipeline depth of cover survey, and would be
required to conduct a depth of cover survey in the special permit segment and implement
remediation measures where depth of cover is reduced.
5

<<<PAGE 6>>>

PHMSA has determined that imposing the special pennit conditions, if granted, would address
these concerns and provide equivalent safety for these areas.
Operational Integrity Compliance:
PHMSA reviewed this special permit request to ensure that integrity threats to the pipeline in the
special permit segment and special permit area are in the operator's operations and management
plan (O&M Plan) to provide a systematic program to review and remediate the pipeline for
safety concerns. Additional operational integrity review and remediation requirements will be
required for this special permit segment class location change, if a special permit is granted. The
pipeline operational integrity requirements are to ensure that the operator has an ongoing
program to locate and remediate safety threats. These threats to integrity and safety include pipe
coating quality, cathodic protection effectiveness, operations damage prevention program for
third party damage, weld seam and girth weld integrity, anomalies in the pipe steel, and material
and structures either along or near the pipeline that could cause the cathodic protection system to
be ineffective. PHMSA carefully designs a comprehensive set of conditions that an operator
would be required to meet in order for the special permit to be granted. Among other things, the
proposed conditions would include:
• A close interval survey to determine the effectiveness of the cathodic protection system
must be performed within the special permit inspection area and all areas with
inadequate cathodic protection must be remediated.
• A coating survey to determine the quality of the pipe coating must be conducted and in-
effective coating areas must be required to be remediated.
• Stress corrosion cracking (SCC) surveys on the pipeline will be required to ensure that
the pipe steel does not contain cracks due to the effects of high and near neutral pH SCC.
• The latest methods of damage prevention must be incorporated by the operator, such as
the best practices of the Common Ground Alliance (CGA) within the special permit
inspection area.
• Interference currents from electric transmission lines and other interfering structures in
the special permit inspection area must be identified, controlled and mitigated by
conducting surveys and installing grounding systems where required.
6

<<<PAGE 7>>>

• An analysis of pipeline field coated girth welds that could have shielding coatings that
could cause corrosion of the pipe steel must be undertaken in the special permit segment
and in-line inspection logs that indicate 30% corrosion indications on shielding or
unknown coatings must be exposed and evaluated.
• Anomalies and dents in the pipeline must be repaired, based upon the special permit
repair criteria.
• Girth welds in the special permit segments must have been inspected to a non destructive
test plan during construction, or a quality review and remediation program must be
implemented by the pipeline operator.
• All shorted casing at road crossings and railroad crossings in the special permit segments
(either metallic or electrolytic) must be cleared to prevent corrosion.
• Pipeline longitudinal seams within the special permit inspection area must have an
engineering analysis to determine if there are any threats and remediated, if integrity
threats are determined.
• Periodic close interval surveys and in-line inspection surveys (pipeline internal surveys to
determine corrosion in the pipeline) must be performed on the special permit segment at
the applicable reassessment intervals.
• In-line tool (ILl) inspections must be conducted through the special permit segments and
the special permit inspection area, and anomaly findings remediated any in accordance
with the 49 CFR Part 192, Subpart 0, § 192.485, and the conditions of the special permit.
• A depth of cover survey of the special permit segments must be conducted. Any pipe in
the special permit segment that does not meet 49 CFR § 192.327(a) must have additional
safety measures implemented in areas with reduced depth of cover.
Compliance History - 2007 through 2011:
A review ofPHMSA enforcement actions of ANR from February 22,2007, through May 24,
2011, shows the following closed enforcement actions against TCPL. During this time interval,
TCPL has owned and operated ANR (OPID 405).
• Letters - of Concern or Warning - 4 matters closed
• Notices - of Amendment or of Probable Violation - 1 matters closed
• Collected Civil Penalties - $41,000 collected
7

<<<PAGE 8>>>

This enforcement history reveals a few compliance issues, including pipeline maintenance
Issues. PHMSA would require TCPL to comply with Special Permit conditions to address these
Issues.
PHMSA reviewed the existing special permits issued to TGPL to ensure that TCPL is in
compliance with the conditions of any existing special permits issued to them. PHMSA found
that TGPL was not following all of the special permit conditions on the PNGTS3 24-inch
mainline pipeline (PHMSA-RSPA-2003-15733) through-out the life of the special permit as
follows:
Special Permit Condition 5: Findings, remediation, and documentation - Perform
weekly aerial patrols and quarterly ground patrols over the entire 143.8 miles of the 24-
inch pipeline. The ground patrols must include leak surveys on all Class 3 portions of the
pipeline using appropriate instrumented leak detection equipment.
PHMSA review of compliance documents:
TCPLIPNGTS did not meet the special permit conditions for performing weekly
aerial patrols and quarterly ground patrols.
• TCPLIPNGTS stopped conducting weekly aerial patrols in July, 2006,
through early 2010. Bi-weekly aerial patrols were performed from 2008
through early 2010 .. PHMSA was not notified of this special permit
modification.
• TCPLIPNGTS performed quarterly ground patrols until the 4th-quarter of
2004, and annual ground patrols were conducted in 2005,2006, and 2007.
Quarterly ground patrols were resumed in 2008. PHMSA was not notified
of this special permit modification.
PHMSA fmds that TCPLIPNGTS's lack of diligence in following all of the conditions of the
existing special permit to be inconsistent with pipeline safety.
3 TGPL is operator of the PNGTS Pipeline Company and was issued special permit (PHMSA-RSPA-2003-15733)
on March 4, 2004.
8

<<<PAGE 9>>>

Findings:
TCP requested a special permit to operate the ANR 30-inch Lateral Loop 2-716, a natural gas
transmission pipeline, at the current MAOP where a change in class location has occurred from
an original Class 1 location to a Class 3 location. Based on the information submitted by TCPL
and PHMSA's analysis of the technical, operational, and existing special permit non-compliance
issues on other TOPL operated pipelines, PHMSA finds that granting this special permit to
TCPL is inconsistent with pipeline safety.
Completed in Washington DC on: ----., ... u ... JN ..... ' ...... 7~2f+01HI---
Prepared by: Engineering and Research Division
9