{"operation":"document","citation":"PHMSA-2005-23447-0010","title":"Hereth and Zurcher - Proposed Presentation - The Use of Threat Analysis in Evaluating Operation of Pipelines at 80% of SMYS","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2006-02-07","effective_on":null,"summary":"Other; Presentation; docket PHMSA-2005-23447.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2005-23447-0010.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2005-23447-0010.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2005-23447-0010","source_url":"https://www.regulations.gov/document/PHMSA-2005-23447-0010","body":"Hereth and Zurcher - Proposed Presentation - The Use of Threat Analysis in Evaluating Operation of Pipelines at 80% of SMYS Other; Presentation. Filed in Regulations.gov docket PHMSA-2005-23447.","truncated":false,"body_characters":194}