{"operation":"document","citation":"PHMSA-2011-0023-0508","title":"Pipeline Safety: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments; etc.; Corrections","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2022-05-04","effective_on":null,"summary":"Rule; Final Rule; docket PHMSA-2011-0023.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0508.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0508.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0508","source_url":"https://www.regulations.gov/document/PHMSA-2011-0023-0508","body":"Pipeline Safety: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments; etc.; Corrections Rule; Final Rule. Filed in Regulations.gov docket PHMSA-2011-0023.","truncated":false,"body_characters":210}