{"operation":"document","citation":"PHMSA-2011-0023-0739","title":"Paul Clannon Executive Director CPUC Letter to Christopher Johns President PGE Safety Response to the San Bruno Pipeline Explosion Sept. 13 2010","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2023-09-15","effective_on":null,"summary":"Other; Supplement (SUP); docket PHMSA-2011-0023.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0739.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0739.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2011-0023-0739","source_url":"https://www.regulations.gov/document/PHMSA-2011-0023-0739","body":"Paul Clannon Executive Director CPUC Letter to Christopher Johns President PGE Safety Response to the San Bruno Pipeline Explosion Sept. 13 2010 Other; Supplement (SUP). Filed in Regulations.gov docket PHMSA-2011-0023.","truncated":false,"body_characters":218}