{"operation":"document","citation":"PHMSA-2012-0175-0063","title":"U.S. DOT/PHMSA - Results of Proof of Concept Tests to Verify the Design and Construction Methods for the Longhorn Partners Pipeling Trench over the Edwards Aquifer Recharge Zone in Austin, Texas - December 2001","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2012-12-27","effective_on":null,"summary":"Other; Report; docket PHMSA-2012-0175.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0063.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0063.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0063","source_url":"https://www.regulations.gov/document/PHMSA-2012-0175-0063","body":"U.S. DOT/PHMSA - Results of Proof of Concept Tests to Verify the Design and Construction Methods for the Longhorn Partners Pipeling Trench over the Edwards Aquifer Recharge Zone in Austin, Texas - December 2001 Other; Report. Filed in Regulations.gov docket PHMSA-2012-0175.","truncated":false,"body_characters":274}