# Magellan Pipeline Company - 2009 Operational Reliability Assessment of the Longhorn Pipeline System - Final Report

- **operation:** document
- **citation:** PHMSA-2012-0175-0070
- **title:** Magellan Pipeline Company - 2009 Operational Reliability Assessment of the Longhorn Pipeline System - Final Report
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2013-01-08
- **effective on:** Not available
- **summary:** Other; Report; docket PHMSA-2012-0175.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0070.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0070.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2012-0175-0070
- **source url:** https://www.regulations.gov/document/PHMSA-2012-0175-0070
**body:**

Magellan Pipeline Company - 2009 Operational Reliability Assessment of the Longhorn Pipeline System - Final Report Other; Report. Filed in Regulations.gov docket PHMSA-2012-0175.
- **truncated:** false
- **body characters:** 178
