{"operation":"document","citation":"PHMSA-2013-0119-0050","title":"Pipeline Safety: Public Workshop on Integrity Verification Process, Comment Extension","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2013-09-12","effective_on":null,"summary":"Notice; Notice of Extension; docket PHMSA-2013-0119.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2013-0119-0050.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2013-0119-0050.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2013-0119-0050","source_url":"https://www.regulations.gov/document/PHMSA-2013-0119-0050","body":"Pipeline Safety: Public Workshop on Integrity Verification Process, Comment Extension Notice; Notice of Extension. Filed in Regulations.gov docket PHMSA-2013-0119.","truncated":false,"body_characters":163}