{"operation":"document","citation":"PHMSA-2015-0020-0003","title":"U.S. DOT/PHMSA - Notice of Postponement of Effective Date: Transportation of Natural and Other Gas by Pipeline: Design of Plastic Pipeline (OPSO-42)","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2015-01-30","effective_on":null,"summary":"Rule; Delay of Effective Date; docket PHMSA-2015-0020.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0020-0003.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0020-0003.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0020-0003","source_url":"https://www.regulations.gov/document/PHMSA-2015-0020-0003","body":"U.S. DOT/PHMSA - Notice of Postponement of Effective Date: Transportation of Natural and Other Gas by Pipeline: Design of Plastic Pipeline (OPSO-42) Rule; Delay of Effective Date. Filed in Regulations.gov docket PHMSA-2015-0020.","truncated":false,"body_characters":228}