# U.S. DOT/PHMSA - Advance Notice of Proposed Rulemaking; Gas Pipeline Operating Above 72 Percent of Specified Minimum Yield Strength (PS-115)

- **operation:** document
- **citation:** PHMSA-2015-0191-0001
- **title:** U.S. DOT/PHMSA - Advance Notice of Proposed Rulemaking; Gas Pipeline Operating Above 72 Percent of Specified Minimum Yield Strength (PS-115)
- **source type:** rulemaking
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** current
- **official:** true
- **published on:** 2015-09-15
- **effective on:** Not available
- **summary:** Notice; Advance Notice of Proposed Rulemaking (ANPRM); docket PHMSA-2015-0191.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0191-0001.json
- **markdown:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0191-0001.md
- **app url:** https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0191-0001
- **source url:** https://www.regulations.gov/document/PHMSA-2015-0191-0001
**body:**

U.S. DOT/PHMSA - Advance Notice of Proposed Rulemaking; Gas Pipeline Operating Above 72 Percent of Specified Minimum Yield Strength (PS-115) Notice; Advance Notice of Proposed Rulemaking (ANPRM). Filed in Regulations.gov docket PHMSA-2015-0191.
- **truncated:** false
- **body characters:** 244
