{"operation":"document","citation":"PHMSA-2015-0248-0002","title":"U.S. DOT/PHMSA - Corrections to Final Rule; Periodic Updates to the Pipeline Safety Regulations (PS-143)","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2015-11-23","effective_on":null,"summary":"Notice; Correction; docket PHMSA-2015-0248.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0248-0002.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0248-0002.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2015-0248-0002","source_url":"https://www.regulations.gov/document/PHMSA-2015-0248-0002","body":"U.S. DOT/PHMSA - Corrections to Final Rule; Periodic Updates to the Pipeline Safety Regulations (PS-143) Notice; Correction. Filed in Regulations.gov docket PHMSA-2015-0248.","truncated":false,"body_characters":173}