{"operation":"document","citation":"PHMSA-2022-0118-0001","title":"Pipeline Safety: Cost Recovery for Siting Reviews for Liquefied Natural Gas Facilities","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"proposed","official":true,"published_on":"2024-08-19","effective_on":null,"summary":"Proposed Rule; Notice of Proposed Rulemaking (NPRM); docket PHMSA-2022-0118.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2022-0118-0001.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2022-0118-0001.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2022-0118-0001","source_url":"https://www.regulations.gov/document/PHMSA-2022-0118-0001","body":"Pipeline Safety: Cost Recovery for Siting Reviews for Liquefied Natural Gas Facilities Proposed Rule; Notice of Proposed Rulemaking (NPRM). Filed in Regulations.gov docket PHMSA-2022-0118.","truncated":false,"body_characters":188}