{"operation":"document","citation":"PHMSA-2025-1271-0004","title":"RBI NPRM HL Annual Report Form and Instructions - PHMSA F 7000-1.1 (rev 4-2023) Redlined 2025-10-20","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2026-06-03","effective_on":null,"summary":"Supporting & Related Material; Report; docket PHMSA-2025-1271.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2025-1271-0004.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2025-1271-0004.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-2025-1271-0004","source_url":"https://www.regulations.gov/document/PHMSA-2025-1271-0004","body":"RBI NPRM HL Annual Report Form and Instructions - PHMSA F 7000-1.1 (rev 4-2023) Redlined 2025-10-20 Supporting & Related Material; Report. Filed in Regulations.gov docket PHMSA-2025-1271.","truncated":false,"body_characters":187}