{"operation":"document","citation":"PHMSA-RSPA-1998-4470-0161","title":"American Gas Association (AGA) Report: Permit Streamlining for Pipeline Integrity Testing and Repairs","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2005-06-24","effective_on":null,"summary":"Other; Report; docket PHMSA-RSPA-1998-4470.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-1998-4470-0161.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-1998-4470-0161.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-1998-4470-0161","source_url":"https://www.regulations.gov/document/PHMSA-RSPA-1998-4470-0161","body":"American Gas Association (AGA) Report: Permit Streamlining for Pipeline Integrity Testing and Repairs Other; Report. Filed in Regulations.gov docket PHMSA-RSPA-1998-4470.","truncated":false,"body_characters":170}