{"operation":"document","citation":"PHMSA-RSPA-2003-16560-0024","title":"U.S. DOT/RSPA - Pipeline Safety: Change in Response Plan Review Cycle - Confirmation of Effective Date and Correction of Direct Final Rule","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":"2004-03-24","effective_on":null,"summary":"Other; Correction(s); docket PHMSA-RSPA-2003-16560.","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-2003-16560-0024.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-2003-16560-0024.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-document-phmsa-rspa-2003-16560-0024","source_url":"https://www.regulations.gov/document/PHMSA-RSPA-2003-16560-0024","body":"U.S. DOT/RSPA - Pipeline Safety: Change in Response Plan Review Cycle - Confirmation of Effective Date and Correction of Direct Final Rule Other; Correction(s). Filed in Regulations.gov docket PHMSA-RSPA-2003-16560.","truncated":false,"body_characters":215}