{"operation":"document","citation":"PHMSA-2024-0090","title":"GPA-API September 2023 Petition to correct an editorial error in the RMV requirements for HVL pipelines in Section 195.418","source_type":"rulemaking","agency":"Pipeline and Hazardous Materials Safety Administration","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"GPA-API September 2023 Petition to correct an editorial error in the RMV requirements for HVL pipelines","machine_formats":{"json":"https://regulus.evalyn.ai/document/regulations-gov-phmsa-2024-0090.json","markdown":"https://regulus.evalyn.ai/document/regulations-gov-phmsa-2024-0090.md"},"app_url":"https://regulus.evalyn.ai/document/regulations-gov-phmsa-2024-0090","source_url":"https://www.regulations.gov/docket/PHMSA-2024-0090","body":"GPA-API September 2023 Petition to correct an editorial error in the RMV requirements for HVL pipelines","truncated":false,"body_characters":103}