{"operation":"document","citation":"Tenn. Comp. R. & Regs. 1220-04-05-.21","title":"REQUIREMENT FOR GOOD ENGINEERING PRACTICE","source_type":"regulation","agency":"Tennessee Public Utility Commission","status":"current","official":true,"published_on":null,"effective_on":null,"summary":"(1) The gas plant of the utility shall be constructed, installed, maintained and operated in accordance with accepted good engineering practice in the gas industry to assure, as far as reasonably possible, continuity of service, uniformity in the quality of service furnished, and the safety of perso","machine_formats":{"json":"https://regulus.evalyn.ai/document/tn-rules-1220-04-05-21.json","markdown":"https://regulus.evalyn.ai/document/tn-rules-1220-04-05-21.md"},"app_url":"https://regulus.evalyn.ai/document/tn-rules-1220-04-05-21","source_url":"https://publications.tnsosfiles.com/rules/1220/1220-04/1220-04-05.20180427.pdf","body":"(1) The gas plant of the utility shall be constructed, installed, maintained and operated in accordance with accepted good engineering practice in the gas industry to assure, as far as reasonably possible, continuity of service, uniformity in the quality of service furnished, and the safety of persons and property.","truncated":false,"body_characters":316}