{"operation":"document","citation":"WAC 480-75-310","title":"Geological considerations.","source_type":"regulation","agency":"Washington Utilities and Transportation Commission","status":"current","official":true,"published_on":null,"effective_on":"2008-06-30","summary":"When a pipeline company is planning to build a new pipeline, the design of the new pipeline must reflect consideration of the potential impacts from seismic activity and earth movement.","machine_formats":{"json":"https://regulus.evalyn.ai/document/wac-480-75-310.json","markdown":"https://regulus.evalyn.ai/document/wac-480-75-310.md"},"app_url":"https://regulus.evalyn.ai/document/wac-480-75-310","source_url":"https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-310","body":"When a pipeline company is planning to build a new pipeline, the design of the new pipeline must reflect consideration of the potential impacts from seismic activity and earth movement.","truncated":false,"body_characters":185}