{"operation":"document","citation":"WAC 480-75-530","title":"Right of way inspections.","source_type":"regulation","agency":"Washington Utilities and Transportation Commission","status":"current","official":true,"published_on":null,"effective_on":"2008-06-30","summary":"The pipeline company must schedule right of way inspections at least once each calendar week. If weather impedes the ability to conduct a fly-over inspection for a consecutive two week period, the weather condition must be noted and the pipeline company must inspect the right of way inspection by mo","machine_formats":{"json":"https://regulus.evalyn.ai/document/wac-480-75-530.json","markdown":"https://regulus.evalyn.ai/document/wac-480-75-530.md"},"app_url":"https://regulus.evalyn.ai/document/wac-480-75-530","source_url":"https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-530","body":"The pipeline company must schedule right of way inspections at least once each calendar week. If weather impedes the ability to conduct a fly-over inspection for a consecutive two week period, the weather condition must be noted and the pipeline company must inspect the right of way inspection by motor vehicle or walking the area, within a two week period.","truncated":false,"body_characters":358}