# Right of way inspections.

- **operation:** document
- **citation:** WAC 480-75-530
- **title:** Right of way inspections.
- **source type:** regulation
- **agency:** Washington Utilities and Transportation Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2008-06-30
- **summary:** The pipeline company must schedule right of way inspections at least once each calendar week. If weather impedes the ability to conduct a fly-over inspection for a consecutive two week period, the weather condition must be noted and the pipeline company must inspect the right of way inspection by mo
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/wac-480-75-530.json
- **markdown:** https://regulus.evalyn.ai/document/wac-480-75-530.md
- **app url:** https://regulus.evalyn.ai/document/wac-480-75-530
- **source url:** https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-530
**body:**

The pipeline company must schedule right of way inspections at least once each calendar week. If weather impedes the ability to conduct a fly-over inspection for a consecutive two week period, the weather condition must be noted and the pipeline company must inspect the right of way inspection by motor vehicle or walking the area, within a two week period.
- **truncated:** false
- **body characters:** 358
