{"operation":"document","citation":"WAC 480-75-550","title":"Change in class location.","source_type":"regulation","agency":"Washington Utilities and Transportation Commission","status":"current","official":true,"published_on":null,"effective_on":"2008-06-30","summary":"Each pipeline company complying with WAC 480-75-360 and 480-75-370 must reevaluate its maximum operating pressure when there is a change in class location. The pipeline company must reevaluate the class location periodically, but not less often than once every five years.","machine_formats":{"json":"https://regulus.evalyn.ai/document/wac-480-75-550.json","markdown":"https://regulus.evalyn.ai/document/wac-480-75-550.md"},"app_url":"https://regulus.evalyn.ai/document/wac-480-75-550","source_url":"https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-550","body":"Each pipeline company complying with WAC 480-75-360 and 480-75-370 must reevaluate its maximum operating pressure when there is a change in class location. The pipeline company must reevaluate the class location periodically, but not less often than once every five years.","truncated":false,"body_characters":272}