{"operation":"document","citation":"WAC 480-75-620","title":"Pressure testing reporting requirements.","source_type":"regulation","agency":"Washington Utilities and Transportation Commission","status":"current","official":true,"published_on":null,"effective_on":"2008-06-30","summary":"If a pipeline company uses pressure testing as part of an effort to increase the maximum operating pressure of the pipeline, the pipeline company must file a report with the commission at least forty-five days prior to pressure testing. The report must include the change in the maximum operating pre","machine_formats":{"json":"https://regulus.evalyn.ai/document/wac-480-75-620.json","markdown":"https://regulus.evalyn.ai/document/wac-480-75-620.md"},"app_url":"https://regulus.evalyn.ai/document/wac-480-75-620","source_url":"https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-620","body":"If a pipeline company uses pressure testing as part of an effort to increase the maximum operating pressure of the pipeline, the pipeline company must file a report with the commission at least forty-five days prior to pressure testing. The report must include the change in the maximum operating pressure and information justifying a higher operating pressure.","truncated":false,"body_characters":361}