# Pressure testing reporting requirements.

- **operation:** document
- **citation:** WAC 480-75-620
- **title:** Pressure testing reporting requirements.
- **source type:** regulation
- **agency:** Washington Utilities and Transportation Commission
- **status:** current
- **official:** true
- **published on:** Not available
- **effective on:** 2008-06-30
- **summary:** If a pipeline company uses pressure testing as part of an effort to increase the maximum operating pressure of the pipeline, the pipeline company must file a report with the commission at least forty-five days prior to pressure testing. The report must include the change in the maximum operating pre
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/wac-480-75-620.json
- **markdown:** https://regulus.evalyn.ai/document/wac-480-75-620.md
- **app url:** https://regulus.evalyn.ai/document/wac-480-75-620
- **source url:** https://app.leg.wa.gov/WAC/default.aspx?cite=480-75-620
**body:**

If a pipeline company uses pressure testing as part of an effort to increase the maximum operating pressure of the pipeline, the pipeline company must file a report with the commission at least forty-five days prior to pressure testing. The report must include the change in the maximum operating pressure and information justifying a higher operating pressure.
- **truncated:** false
- **body characters:** 361
