{"operation":"document","citation":"WAC 480-93-250","title":"Damage prevention.","source_type":"regulation","agency":"Washington Utilities and Transportation Commission","status":"current","official":true,"published_on":null,"effective_on":"2008-06-30","summary":"Each gas pipeline company must comply with chapter 19.122 RCW, including:\n\n(1) Subscribe to the appropriate one-number locator service;\n\n(2) Provide, upon receipt of locate notice, reasonably accurate information as to its locatable underground facilities by surface-marking the location of the facil","machine_formats":{"json":"https://regulus.evalyn.ai/document/wac-480-93-250.json","markdown":"https://regulus.evalyn.ai/document/wac-480-93-250.md"},"app_url":"https://regulus.evalyn.ai/document/wac-480-93-250","source_url":"https://app.leg.wa.gov/WAC/default.aspx?cite=480-93-250","body":"Each gas pipeline company must comply with chapter 19.122 RCW, including:\n\n(1) Subscribe to the appropriate one-number locator service;\n\n(2) Provide, upon receipt of locate notice, reasonably accurate information as to its locatable underground facilities by surface-marking the location of the facilities;\n\n(3) Respond with locate markings within two business days after receipt of the notice or within a time mutually agreed upon between the operator and the excavator requesting the utility locate information.","truncated":false,"body_characters":513}