{"operation":"document","citation":"Wis. Admin. Code § PSC 133.05","title":"PSC 133.05 Pre-application consultation.","source_type":"regulation","agency":"Public Service Commission of Wisconsin","status":"current","official":true,"published_on":null,"effective_on":"2007-11-01","summary":"Complete current PSC 133.05 from official Wisconsin Legislature sources (pipeline-construction-and-siting).","machine_formats":{"json":"https://regulus.evalyn.ai/document/wi-psc-133-05.json","markdown":"https://regulus.evalyn.ai/document/wi-psc-133-05.md"},"app_url":"https://regulus.evalyn.ai/document/wi-psc-133-05","source_url":"https://docs.legis.wisconsin.gov/document/administrativecode/PSC%20133.05","body":"PSC 133.05 Pre-application consultation. For any gas public utility project that requires a certificate of authority and is required to follow the department permit procedure for utility facilities under s. 30.025, Stats., the utility shall consult with the commission and department during development of the applications to discuss project scope, alternatives, routes or locations, and information required for the applications.","truncated":false,"body_characters":430}