{"operation":"document","citation":"Wis. Admin. Code § PSC 135.199","title":"PSC 135.199 Requirements for design of pressure relief and limiting devices additions [49 CFR 192.199].","source_type":"regulation","agency":"Public Service Commission of Wisconsin","status":"current","official":true,"published_on":null,"effective_on":"1999-11-01","summary":"Complete current PSC 135.199 from official Wisconsin Legislature sources (pipeline-safety).","machine_formats":{"json":"https://regulus.evalyn.ai/document/wi-psc-135-199.json","markdown":"https://regulus.evalyn.ai/document/wi-psc-135-199.md"},"app_url":"https://regulus.evalyn.ai/document/wi-psc-135-199","source_url":"https://docs.legis.wisconsin.gov/document/administrativecode/PSC%20135.199","body":"PSC 135.199 Requirements for design of pressure relief and limiting devices additions [49 CFR 192.199].\n\n(1) After 49 CFR 192.199(e), insert:\n\n(2) After 49 CFR 192.199(h), insert:","truncated":false,"body_characters":179}