{"operation":"document","citation":"Wyo. Admin. Rules 023.0002.3 § 28(a)(ii), (b)","title":"Gas service interruption records","source_type":"regulation","agency":"Wyoming Public Service Commission","status":"current","official":true,"published_on":"2025-07-16","effective_on":"2025-07-16","summary":"(a) Each utility shall report within 30 days after the end of each calendar quarter the following service interruptions, planned or otherwise: (ii) Natural gas utilities: all service interruptions, other than meter testing or change outs; (b) These records shall be retained by the utility for a mini","machine_formats":{"json":"https://regulus.evalyn.ai/document/wy-admin-rules-023-0002-3-28-a-ii-b.json","markdown":"https://regulus.evalyn.ai/document/wy-admin-rules-023-0002-3-28-a-ii-b.md"},"app_url":"https://regulus.evalyn.ai/document/wy-admin-rules-023-0002-3-28-a-ii-b","source_url":"https://rules.wyo.gov/Search.aspx?mode=7&agency=23&program=214&chapter=3","body":"(a) Each utility shall report within 30 days after the end of each calendar quarter the following service interruptions, planned or otherwise:\n\n(ii) Natural gas utilities: all service interruptions, other than meter testing or\n\nchange outs;\n\n(b) These records shall be retained by the utility for a minimum of six years.","truncated":false,"body_characters":320}