Regulationhistorical
49 CFR 192.376
Installation of plastic service lines by trenchless excavation.
Snapshot 2022-10-01 Government source
eCFR editorial compilationAuthoritative but unofficial
View source Plastic service lines installed by trenchless excavation must comply with the following:
(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.
(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.
[Amdt. 192-124, 83 FR 58719, Nov. 20, 2018]