49 CFR 192.725
Test requirements for reinstating service lines.
Snapshot 2017-10-01 Government source
eCFR editorial compilationAuthoritative but unofficial
View source (a) Except as provided in paragraph (b) of this section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated.
(b) Each service line temporarily disconnected from the main must be tested from the point of disconnection to the service line valve in the same manner as a new service line, before reconnecting. However, if provisions are made to maintain continuous service, such as by installation of a bypass, any part of the original service line used to maintain continuous service need not be tested.