Regulationhistorical
49 CFR 192.739
Pressure limiting and regulating stations: Inspection and testing.
Snapshot 1999-10-01 Government source
eCFR editorial compilationAuthoritative but unofficial
View source Each pressure limiting station, relief device (except rupture discs), and pressure regulating station and its equipment must be subjected at intervals not exceeding 15 months, but at least once each calendar year, to inspections and tests to determine that it is—
(a) In good mechanical condition;
(b) Adequate from the standpoint of capacity and reliability of operation for the service in which it is employed;
(c) Set to function at the correct pressure; and
(d) Properly installed and protected from dirt, liquids, or other conditions that might prevent proper operation.
[35 FR 13257, Aug. 19, 1970, as amended by Amdt. 192-43, 47 FR 46851, Oct. 21, 1982]