49 CFR 194.121
Response plan review and update procedures.
(a) Each operator shall review its response plan at least every 5 years from the date of submission and modify the plan to address new or different operating conditions or information included in the plan.
(b) If a new or different operating condition or information would substantially affect the implementation of a response plan, the operator must immediately modify its response plan to address such a change and, within 30 days of making such a change, submit the change to RSPA. Examples of changes in operating conditions that would cause a significant change to an operator's response plan are:
(1) An extension of the existing pipeline or construction of a new pipeline in a response zone not covered by the previously approved plan;
(2) Relocation or replacement of the pipeline in a way that substantially affects the information included in the response plan, such as a change to the worst case discharge volume;
(3) The type of oil transported, if the type affects the required response resources, such as a change from crude oil to gasoline;
(4) The name of the oil spill removal organization;
(5) Emergency response procedures;
(6) The qualified individual;
(7) A change in the NCP or an ACP that has significant impact on the equipment appropriate for response activities; and
(8) Any other information relating to circumstances that may affect full implementation of the plan.
(c) If RSPA determines that a change to a response plan does not meet the requirements of this part, RSPA will notify the operator of any alleged deficiencies, and provide the operator an opportunity to respond, including an opportunity for an informal conference, to any proposed plan revisions and an opportunity to correct any deficiencies.
(d) An operator who disagrees with a determination that proposed revisions to a plan are deficient may petition RSPA for reconsideration, within 30 days from the date of receipt of RSPA's notice. After considering all relevant material presented in writing or at the conference, RSPA will notify the operator of its final decision. The operator must comply with the final decision within 30 days of issuance unless RSPA allows additional time.
[58 FR 253, Jan. 5, 1993, as amended by Amdt. 194-1, 62 FR 67293, Dec. 24, 1997]