Subpart A—General Requirements8Subpart B—General Operating Requirements4Subpart C—General Handling and Loading Requirements7Subpart D—Handling of Placarded Rail Cars, Transport Vehicles and Freight Containers5Subpart E—Class I (Explosive) Materials10Subpart F—Detailed Requirements for Class 2 (Gases) Materials4Subpart G—Detailed Requirements for Class 3 (Flammable Liquid) Materials4Subpart J—Detailed Requirements for Division 6.1 (Poisonous) Materials3Subpart K—Detailed Requirements for Class 7 (Radioactive) Materials3
Regulationcurrent
49 CFR 174.105
Routing shipments, Division 1.1 or 1.2 (explosive) materials.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
Before a shipment of Division 1.1 or 1.2 (explosive) materials destined to a point beyond the lines of the initial carrier is accepted from the shipper, the initial carrier shall ascertain that the shipment can go forward by the route designated. To avoid delays en route, the initial carrier must be in possession of full rate information before forwarding the shipment.#