View source (a) To certify that the tank complies with all specification requirements, each tank shall be plainly and permanently stamped in letters and figures at least 3/8 inch high into the metal near the center of both outside heads as follows:
Example of required stamping Specification DOT-105A100W Material ASTM A 516 Cladding material (if any) ASTM A240-304 Tank builder's initials Clad Date of original test ABC Car assembler (if other than tanker builder) 00-0000DEF
(b) [Reserved]
[29 FR 18995, Dec. 29, 1964. Redesignated at 32 FR 5606, Apr. 5, 1967, and amended by Amdt. 179-10, 36 FR 21346, Nov. 6, 1971; Amdt. 179-52, 61 FR 28679, June 5, 1996; 65 FR 50463, Aug. 18, 2000]