49 CFR 192.383
Excess flow valve installation.
(a) Definitions. As used in this section:
Replaced service line means a gas service line where the fitting that connects the service line to the main is replaced or the piping connected to this fitting is replaced.
Service line serving single-family residence means a gas service line that begins at the fitting that connects the service line to the main and serves only one single-family residence.
(b) Installation required. An excess flow valve (EFV) installation must comply with the performance standards in § 192.381. The operator must install an EFV on any new or replaced service line serving a single-family residence after February 12, 2010, unless one or more of the following conditions is present:
(1) The service line does not operate at a pressure of 10 psig or greater throughout the year;
(2) The operator has prior experience with contaminants in the gas stream that could interfere with the EFV's operation or cause loss of service to a residence;
(3) An EFV could interfere with necessary operation or maintenance activities, such as blowing liquids from the line; or
(4) An EFV meeting performance standards in § 192.381 is not commercially available to the operator.
(c) Reporting. Each operator must report the EFV measures detailed in the annual report required by § 191.11.
[Amdt. 192-113, 74 FR 63934, Dec. 4, 2009, as amended at 75 FR 5244, Feb. 2, 2010; 76 FR 5499, Feb. 1, 2011]