Regulationcurrent
49 CFR 193.2505
Cooldown.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
View source (a)The cooldown of each system of components that is subjected to cryogenic temperatures must be limited to a rate and distribution pattern that keeps thermal stresses within design limits during the cooldown period, paying particular attention to the performance of expansion and contraction devices.#
(b)After cooldown stabilization is reached, cryogenic piping systems must be checked for leaks in areas of flanges, valves, and seals.#