Regulationcurrent
192.17
Filing of Operation, Inspection, and Maintenance Plan
Current as of source date Government source
Arkansas Public Service CommissionOfficial agency material
View source § 192.17 Filing of Operation, Inspection, and Maintenance Plan Each operator shall file with the Pipeline Safety Office of the Arkansas Public Service Commission#
(PSO)a plan for operation, inspection, and maintenance of each pipeline facility which the operator owns or operates. In addition, each change to this plan must be filed with the PSO within 20 days after the change is made. Once filed, this plan becomes a part of these standards as though incorporated and must be followed by the operator.#