192.724
Hazardous Facilities
§ 192.724 Hazardous Facilities#
(a)If at any time the supplier to a master meter system or private line system becomes aware that the receiving system is experiencing a lost and unaccounted for gas percentage of ten percent (10%) or more, as calculated on a rolling average over the prior year, the supplier may terminate service to the receiving system without delay.#
(b)If at any time the supplier to a master meter system or private line system becomes aware that the receiving system has an operating condition which causes it to deliver gas service in an unsafe manner and endanger life or property, the supplier shall terminate service to the receiving system without delay.#
(c)Following the termination of service pursuant to#
(a)or#
(b)above, the supplier to a master meter system or private line system shall make contact with PSO personnel by telephone or electronic mail within one hour of termination and provide a detailed justification for such termination.#
(d)Prior to reconnection of service to a master meter system or private line system that has been terminated pursuant to#
(a)or#
(b)above, the supplier shall comply with its reconnection policy.#